Skip to main content
All States

Oregon Building Permit Guides

74 building permit guides for Oregon jurisdictions.

How building permits work in Oregon

Municipal GuideOregon

Albany Building Permit Guide

Albany files every permit on its ePermitting site. The Building Division counter, 2026-2027 fees and a new-home fee example, the patio cover rule, historic review and inspection booking.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Ashland Building Permit Guide

How building permits work in Ashland, Oregon: the Building Division's portal and walk-in hours, wildfire submittal items, current and 2027 fees, trades and inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Astoria Building Permit Guide

How building permits work in Astoria, Oregon: who issues each permit, ePermitting and paper filing, Schedule A fees, the flood overlay and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Baker City Building Permit Guide

How building permits work in Baker City, Oregon: the Building Department on First Street, City zoning and fence rules, historic district review, fees and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Baker County Building Permit Guide

How building permits work in Baker County, Oregon: the one department that serves every city and rural parcel, county zoning clearance, septic, fees, inspection routes and records.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Beaverton Building Permit Guide

Beaverton files every permit electronically in BEPS. The Building Division office and hours, the Clean Water Services review first, TVF&R and the regional charges from July 1, 2026.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Bend Building Permit Guide

Bend’s Building Safety Division reviews, issues and inspects permits. Permit technician contacts, joint review, fire hardening rules from May 15, 2026 and how portal inspections work.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Benton County Building Permit Guide

Benton County permits everything outside Corvallis, Philomath and Albany. Office and hours, 2026 fees, average processing times, septic, road approaches, inspections and the Corvallis office.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Central Point Building Permit Guide

How building permits work in Central Point, Oregon: the Building Division's forms and ePermitting, the fee schedule and SDCs, Public Works conditions, floodplain review and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Clackamas County Building Permit Guide

Everything contractors, builders and developers need for a Clackamas County building permit — the Building Codes division in Oregon City, the uniform statewide code, the Mount Hood rural areas, and where Lake Oswego and Happy Valley work goes instead.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Clatsop County Building Permit Guide

How building permits work in Clatsop County, Oregon: the county and city split by trade, development permits, septic, the 2022 fee schedule, inspections and records.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Columbia County Building Permit Guide

Columbia County’s building office is temporarily at 445 Port Avenue on reduced days. Coverage by city, the planning-septic-road sequence, submittal sets, fees and the St. Helens office.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Coos Bay Building Permit Guide

How building permits work in Coos Bay, Oregon: the City and county permit split, paper and online filing, the fee schedule, floodplain rules and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Coos County Building Permit Guide

Coos County runs a full building and septic program. Land use authorization, how coverage differs in Coos Bay, North Bend and Lakeside, filing, review time and inspections.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Corvallis Building Permit Guide

Everything contractors, builders and developers need to pull a City of Corvallis building permit — Development Services on Madison Avenue, the uniform statewide code, university-driven growth, land-use review, and Cascadia seismic design.

10 min readAugust 2026
Read Guide
Municipal GuideOregon

Cottage Grove Building Permit Guide

How building permits work in Cottage Grove, Oregon: the City's common-work permit list, ePermitting filing, the November 2024 fee schedule and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Crook County Building Permit Guide

How building permits work in Crook County, Oregon: one county office for Prineville and rural land, land use and septic steps, the 2026-27 fees, inspections and records.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Dallas Building Permit Guide

How building permits work in Dallas, Oregon: the City's ePermitting filing, owner permits, the indexed fee schedule, inspection days and Polk County electrical permits.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Deschutes County Building Permit Guide

Everything contractors, builders and developers need for a Deschutes County building permit — the Community Development Department in Bend, the uniform statewide code, fast high-desert growth and the wildland interface, and where Bend and Redmond work goes instead.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Douglas County Building Permit Guide

Douglas County’s Building Department reviews and inspects Roseburg projects after the City’s site plan review. Contacts, the two-step process, demolition rules and inspection scheduling.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Eugene Building Permit Guide

Eugene takes every construction permit through eBuild. The owner contact rule, express same-day review slots, trade permits, file naming, plan check fees and the My Permits inspection system.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Fairview Building Permit Guide

How building permits work in Fairview, Oregon: the Building Division in Public Works, planning approval first, the July 2026 Master Fee Schedule and foundation survey rules.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Forest Grove Building Permit Guide

How building permits work in Forest Grove: the Building Division at City Hall, Cornelius coverage, county electrical permits, fees, the 2026 new-home estimate and inspections.

12 min readOctober 2026
Read Guide
Municipal GuideOregon

Grants Pass Building Permit Guide

How building permits work in Grants Pass, Oregon: the Building Division's online process, review tracks, 2026 fees and SDCs, floodplain rules and inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Gresham Building Permit Guide

Gresham issues building permits at City Hall and everything else online. Contacts, exemption conditions, grading and right-of-way permits, the July 2026 fee schedule and inspection cut-offs.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Happy Valley Building Permit Guide

How building permits work in Happy Valley: the Building Division and HVWorks, fees from July 1, 2026, new-house SDCs, checklists, review times and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Hermiston Building Permit Guide

How building permits work in Hermiston, Oregon: the Building Department's filing rules, master fee schedule, zoning review, dust plans, plan review times and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Hillsboro Building Permit Guide

Hillsboro’s Permit Center takes walk-ins at the Civic Center. Address, hours and phone, the Accela, ProjectDox and OpenCounter systems, the data center moratorium and inspection scheduling.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Hood River County Building Permit Guide

How building permits work in Hood River County, Oregon: who permits each city, zoning and agency sign-offs, septic, SDCs, the July 2026 fees and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Jackson County Building Permit Guide

Jackson County permits White City and three contract cities, plus electrical in two more. Office hours, fees and valuation, DEQ septic, road approaches, virtual inspections and Medford’s office.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Jefferson County Building Permit Guide

How building permits work in Jefferson County, Oregon: the county permits every city, the land use and septic steps, owner work, costs, inspections and records.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Josephine County Building Permit Guide

Josephine County Building Safety covers the county and Cave Junction, with Illinois Valley inspections three days a week. Offices, Grants Pass, exempt buildings, septic, road fees and inspections.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Keizer Building Permit Guide

How Keizer building permits work: City Hall intake, Marion County plan review and inspections, fees, trade permits and system development charges.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Klamath County Building Permit Guide

Everything contractors, builders and developers need for a Klamath County building permit — countywide permitting from Klamath Falls, the uniform statewide code, high-desert terrain, and the city planning approval that comes first inside Klamath Falls.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

La Grande Building Permit Guide

How building permits work in La Grande, Oregon: the Building Division at City Hall, zoning and flood forms, the 2017 fee methodology, trade permits and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Lake Oswego Building Permit Guide

How building permits work in the City of Lake Oswego: the Building Department at City Hall, the 2026 fee schedule, Planning and tree sign-off, demolition rules and inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Lane County Building Permit Guide

Everything contractors, builders and developers need for a Lane County building permit — the Land Management Division, the uniform statewide code, the coast-to-Cascades terrain, and where Eugene and Springfield work goes instead.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Lebanon Building Permit Guide

How building permits work in Lebanon, Oregon: the City's Building Division, its July 2024 fee schedule and new-house example, inspections and Linn County electrical permits.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Lincoln County Building Permit Guide

Every Lincoln County building application starts with a Zoning Clearance review. Area covered, hours, fees, inspections, septic, floodplain and road approach permits.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Linn County Building Permit Guide

Linn County Planning & Building issues permits and handles land use from Albany. Office and hours, ePermitting, Mill City, and the separate Albany and Sweet Home building programs.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Malheur County Building Permit Guide

How building permits work in Malheur County, Oregon: which office permits each city, zoning and septic first, the structural fee schedule, inspections and permit records.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Marion County Building Permit Guide

Marion County permits the unincorporated county and parts of some cities. Office hours, who handles Woodburn, Aurora, Silverton, Mill City and Keizer, zoning review, septic, fees and inspections.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

McMinnville Building Permit Guide

How building permits work in McMinnville, Oregon: the Building Division's ePermitting process, the August 2026 fee schedule, SDCs, school tax and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Medford Building Permit Guide

Everything contractors, builders and developers need to pull a City of Medford building permit — the Building Safety Department, the uniform statewide code, Rogue Valley growth and wildfire recovery, land-use review, and inspections.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Milwaukie Building Permit Guide

How building permits work in Milwaukie, Oregon: the City's own electrical program, the fee schedule adopted June 16, 2026, review targets and inspection order.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Monmouth Building Permit Guide

How building permits work in Monmouth, Oregon: the City's full-service Building Department, ePermitting and paper filing, valuation fees, SDCs and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Morrow County Building Permit Guide

How building permits work in Morrow County, Oregon: the contract building department for the county and its cities, state electrical permits, zoning, septic, fees and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Multnomah County Building Permit Guide

Everything contractors, builders and developers need for building in Multnomah County — the uniform statewide code, the county’s small unincorporated footprint, and where Portland and Gresham city work goes instead.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Newberg Building Permit Guide

How building permits work in Newberg, Oregon: OpenGov filing, the July 2026 Master Fee Schedule, SDCs, inspections and Yamhill County electrical permits.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Newport Building Permit Guide

How building permits work in Newport, Oregon: Community Development's permits and inspections, the 2026-27 fee schedule, SDCs, excise taxes and overlays.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

North Bend Building Permit Guide

How building permits work in North Bend, Oregon: what the City issues, who handles electrical and plumbing, the 2026 fee resolution, inspections and permit expiry rules.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Ontario Building Permit Guide

How building permits work in Ontario, Oregon: the City's Building Division, the county's electrical and plumbing permits, the 2026-27 fee schedule, SDCs, planning and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Oregon City Building Permit Guide

How building permits work in Oregon City: the Building Division on Warner Parrott Road, the CSS portal, current fees and the fee changes proposed in late 2026, and inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Polk County Building Permit Guide

Polk County permits the unincorporated county and Falls City, and electrical in Dallas and Independence. No Friday inspections from August 31, 2026; septic, school tax, driveways and the Dallas office.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

Portland Building Permit Guide

Everything contractors, builders and developers need to pull a City of Portland building permit — Portland Permitting and Development, the uniform statewide code, Cascadia seismic design, land-use review, and inspections.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Redmond Building Permit Guide

How building permits work in Redmond, Oregon: the City building department, fire plan review by Redmond Fire & Rescue, the WUI code, fees and trade permits.

11 min readOctober 2026
Read Guide
Municipal GuideOregon

Salem Building Permit Guide

Salem files every residential project in its Permit Application Center portal. Office hours and phones, who permits across the Marion and Polk line, site hazard checks and the 180-day rule.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Sandy Building Permit Guide

How building permits work in Sandy, Oregon: the City's Building Division, Clackamas County electrical permits, the July 2026 fee schedule and the sewer connection moratorium.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Sherwood Building Permit Guide

How building permits work in Sherwood, Oregon: the Building Department's ePermitting steps, the October 2026 fee schedule, Washington County electrical permits and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Silverton Building Permit Guide

How building permits work in Silverton, Oregon: the City Building Department, iWorQ, email or counter filing, the January 2026 permit fees and the inspection rules.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Springfield Building Permit Guide

Springfield’s counter is open Tuesday to Friday. Filing routes, FY27 fees with the 7.5% administrative fee, grading permits, SDCs and waivers, and the 7:00 a.m. inspection cut-off.

4 min readOctober 2026
Read Guide
Municipal GuideOregon

St. Helens Building Permit Guide

How building permits work in St. Helens, Oregon: the City Building Department, Columbia County electrical permits, Resolution 2069 fees and texting inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Tigard Building Permit Guide

Tigard’s Permit Center joins building, engineering and planning. Its hours, online Hub, inspection windows and work hours, plus Clean Water Services, TVF&R and regional charges.

3 min readOctober 2026
Read Guide
Municipal GuideOregon

Tillamook County Building Permit Guide

How building permits work in Tillamook County, Oregon: who permits each city, appointments and paper filing, zoning, septic, school tax, the 2023 fees and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Troutdale Building Permit Guide

How building permits work in Troutdale, Oregon: the Building Division and its Gresham partners, the CSS portal, Resolution 2685 fees, flood hazard permits and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Tualatin Building Permit Guide

How building permits work in Tualatin: the Building Division on Herman Road, eTrakit, old and new 2026 fee schedules, review times, deck and shed rules and inspections.

12 min readOctober 2026
Read Guide
Municipal GuideOregon

Umatilla County Building Permit Guide

Everything contractors, builders and developers need for a Umatilla County building permit — state building services from the Pendleton field office, county planning and land use, and where Pendleton and Hermiston work goes instead.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

Union County Building Permit Guide

How building permits work in Union County, Oregon: the building division that serves every city and rural parcel, county zoning, Harney County septic service, fees and inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Wasco County Building Permit Guide

How building permits work in Wasco County, Oregon: the county office that permits every city, zoning and Scenic Area rules, septic, the state fee table, inspections and records.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Washington County Building Permit Guide

Everything contractors, builders and developers need for a Washington County building permit — Building Services under Land Use and Transportation, the Silicon Forest economy, electronic plan review, and where Hillsboro and Beaverton work goes instead.

9 min readAugust 2026
Read Guide
Municipal GuideOregon

West Linn Building Permit Guide

How building permits work in West Linn: the Building Division's paperless intake, the fee schedule adopted June 9, 2026, planning and hub and tack rules, and ePermitting inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Wilsonville Building Permit Guide

How building permits work in Wilsonville: the Building Division at City Hall, its portal and review targets, posted fees and the 2026 adjustment, SDCs and inspections.

13 min readOctober 2026
Read Guide
Municipal GuideOregon

Woodburn Building Permit Guide

How building permits work in Woodburn, Oregon: the Building Division's ePermitting process, fees, SDCs, Marion County trade permits and inspections.

14 min readOctober 2026
Read Guide
Municipal GuideOregon

Yamhill County Building Permit Guide

Yamhill County permits the unincorporated county and five cities, plus electrical in ten. Office hours, the four approvals, septic, driveways, manufactured home fees and McMinnville’s office.

4 min readOctober 2026
Read Guide

How building permits work in Oregon

These rules apply across Oregon. Each local guide above covers what is specific to that city or county: its permitting office and contacts, the land-use and overlay rules it adds, fees and inspections.

One statewide code, administered locally

Oregon has one building code. The state building code — the Oregon Specialty Codes, adopted by the Building Codes Division of the Department of Consumer and Business Services — is applicable and uniform throughout the state, and no municipality may enforce different requirements on the same matters unless the department’s director authorises it (ORS §455.040). The Oregon Residential Specialty Code covers one- and two-family dwellings and townhouses; the Oregon Structural Specialty Code covers other buildings; mechanical, plumbing, electrical and energy specialty codes sit alongside them.

Administration is local. The Building Codes Division counts 131 municipalities that administer the state building code; the city or county sets the fee schedule, the submittal list, the inspection booking method and the land-use rules, but not the technical requirements.

The exemptions are statewide too, and the 2026 Oregon Residential Specialty Code sets them out in two lists. Its chapter 1 has been mandatory since October 1, 2026 (the rest of the 2026 code becomes mandatory on April 1, 2027). The first list (section R105.2) is work that needs no building permit, among other things: a nonhabitable one-story detached accessory structure, not used for sleeping or permanent cooking, of up to 200 square feet and 15 feet high (400 square feet on a parcel of two acres or more); detached platforms and decks no more than 30 inches above grade, of any size, and porches and decks attached to a house at that height; above-grade and on-ground swimming pools; replacement or repair of siding that is not required to be fire rated; door and window replacements, unless a structural member changes or the unit must be fire rated; and reroofing, including replacement of damaged sheathing, where the added dead load is 4 pounds per square foot or less, except on townhouses and attached stacked two-family dwellings, for building-integrated and other photovoltaic roof coverings, and where the original construction had to meet the wildfire standards of section R327. The second list (section R101.2.2) is exempt unless a city or county ordinance requires a permit: fences, though a swimming pool barrier always needs one and no ordinance may require a permit for a wood, wire-mesh or chain-link fence 7 feet high or less; retaining walls, though a wall that protects a building’s users, supports a regulated building or holds back material that could affect one always needs a permit, and an ordinance may not require one for other walls 4 feet high or less unless they hold back a slope steeper than 3:1 or a surcharge other than soil; ground-mounted solar arrays, which need no permit at 10 feet high or less with no public access beneath; freestanding antennas, towers and tanks; fixed docks; and in-ground swimming pools at one- and two-family dwellings and townhouses. An exemption from the building permit is never an exemption from zoning, land use or a separate electrical, plumbing or mechanical permit.

Site design values come from the state’s Oregon Design Criteria Hub, which gives ground snow load, design wind speed and seismic values for a location. A residential permit expires if work does not start within 180 days of issue, or stops for 180 days once started; the building official can extend it in writing, up to 180 days at a time.

⚠️ Get the permit before work begins. Building without a required permit exposes the job to stop-work orders, investigation fees, correction orders, delayed occupancy and problems at resale, refinancing or insurance. Because Oregon licenses contractors and runs one code statewide, unpermitted and unlicensed work is straightforward for a jurisdiction to identify.

CCB licensing, its narrow exemptions and state trade licences

Contractors are licensed by the Construction Contractors Board. Anyone who works, offers or bids as a contractor needs a current CCB licence with the right residential or commercial endorsement (ORS §701.021), and there is no minimum job value. The exemptions in ORS §701.010 are narrow: work on one structure totalling less than $1,000 that is casual, minor or inconsequential, by someone who does not advertise as a contractor; a person working on property they own, occupied or not, or on their own residence; and an owner who hires licensed contractors. Neither owner exemption applies to someone building or remodelling with the intent of selling, and not living in the finished building is evidence of that intent.

The trades are licensed by the state on top of the CCB licence: electricians and electrical contractors under ORS chapter 479, and plumbers and plumbing contractors under ORS chapters 447 and 693. An owner may do electrical work on their own residential or farm property that is not for sale or rent without a licence (ORS §479.540), and plumbing licensing does not apply to plumbing work not done for hire (ORS §447.060); the work still needs its permit and must meet the code.

How fees are set: the valuation method and the 12% surcharge

The state fixes the fee method, not the price. For new one- and two-family dwellings and additions the valuation is the ICC Building Valuation Data figure in force on 1 April multiplied by the floor area, and for commercial work it is the greater of that figure and the value the applicant states (OAR 918-050-0100); and the local fee schedule turns that valuation into the permit fee. Plan review is charged as the municipality sets it.

A 12 percent state surcharge is added to every permit fee — building, electrical, plumbing, mechanical and manufactured dwelling installation permits alike — and the municipality collects it and passes it to the state (ORS §§455.210 and 455.220).

Electrical and plumbing permits

  • Electrical: a permit is required before new or altered electrical work starts. According to the Building Codes Division, none is needed for like-for-like replacement of broken or damaged outlets, light fixtures and switches (outlets with ground-fault protection excepted), for replacing fuses, defective breakers, light bulbs or fluorescent tubes, or for replacing an existing garbage disposal or dishwasher of 30 amps or less (see also OAR 918-309-0000). Licensed contractors can use a minor label instead of a permit for eligible small jobs, but not for underground work, work needing a cover inspection or plan review, hazardous locations or pools (OAR 918-309-0220).
  • Plumbing: permits are required for plumbing installations; the only statutory exemption is for ordinary minor repairs that do not change the existing system, and it never covers water heaters, underground plumbing or new construction (ORS §447.072).

Sources