In Central Point, the City’s Building Division, part of Community Development, reviews plans and issues and inspects permits for all residential and commercial construction, including the plumbing, mechanical and electrical work. Contractors can buy permits and book inspections in Oregon ePermitting, but every application still needs the City’s application form with the plans. Under the fee schedule effective January 1, 2024, the minimum structural permit is $85 and plan review is 65% of the permit fee.
Building and Planning share City Hall at 140 S. Third Street (541-664-3321, building@centralpointoregon.gov). The City’s contact page lists their hours as Monday to Friday, 7:30 a.m. to 4 p.m., closed for lunch from noon to 1 p.m., while the Community Development page gives 8 a.m. to 4 p.m. with the same lunch closure. Derek Zwagerman, P.E., is Building Official and Director (541-423-1024). Central Point, in Jackson County, had 19,139 residents in the Census estimate for 2025.
City permits cover land inside Central Point’s city limits; Jackson County issues building permits on unincorporated land nearby, including White City.
What requires a building permit in Central Point?
New homes, additions, remodels, accessory buildings over the exempt size, commercial work and new electrical, plumbing and mechanical work need permits. The City’s handouts add local checks that apply even to exempt work: setbacks and zoning, a Public Works review for every fence proposal, and a floodplain review for every project.
Permit required
- New houses, accessory dwelling units and additions
- Accessory buildings over 200 sq ft or over 15 feet high
- Decks more than 30 inches above grade
- Rooftop solar, with the prescriptive checklist or full plan review
- Fire sprinkler, alarm and kitchen hood systems
- Electrical work for a pool, and a pool barrier
- Sidewalks, driveways, curbs and right-of-way work (Public Works permit)
- Development in flood zones A, AE and AO (floodplain development permit)
No building permit (2026 ORSC)
- Nonhabitable one-story detached sheds up to 200 sq ft and 15 feet to the average roof height
- Decks and porches 30 inches or less above grade
- Deck, patio and porch covers up to 200 sq ft, 3 feet or more from lot lines
- Reroofing that adds 4 psf or less of dead load, except townhouses
- Wood, wire mesh and chain link fences up to 7 feet, except pool barriers
Short on time to read all of this?
Get a free quote →What Central Point decides and what the state holds
Permit exemptions follow sections R105.2 and R101.2.2 of the 2026 Oregon Residential Specialty Code, whose chapter 1 became mandatory on October 1, 2026. The City’s exemption handout predates it and still cites a 10-foot shed height and the old 30 percent reroofing rule. Pools are a moving target: on January 22, 2026 the City Council adopted Ordinance 2137, which updated the City’s building code chapter and repealed chapter 15.22 on privately owned swimming pools, and state code now leaves in-ground pools at houses permit-free unless a local ordinance requires a permit; the City’s pool handout still says a permit is needed unless the pool walls are entirely above grade, so ask the Building Division before you dig. Whatever the permit answer, the handout sets the barrier rules: at least 4 feet high, no more than 2 inches of clearance at the bottom, no opening that a 4-inch sphere can pass, and self-closing, self-latching gates that open away from the pool. Central Point sets its own fees, zoning, Public Works conditions and floodplain rules.
Oregon’s building code and its exemptions are the same in Central Point as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works
Central Point building department: who handles permitting
BCD’s Local Building Department Directory lists Central Point as providing all building permits, so structural, electrical, plumbing and mechanical permits all come from the same office. Planning handles zoning, land use and floodplain management, Public Works issues driveway, sidewalk, utility and right-of-way permits and signs off on occupancy, and Rogue Valley Sewer Services collects sanitary sewer fees for new connections.
| Detail | Information |
|---|---|
| Building Division | City Hall, 140 S. Third Street, Central Point, OR 97502 |
| Phone and email | 541-664-3321 (submittal checklist: ext. 292); building@centralpointoregon.gov |
| Hours | Monday to Friday, closed noon to 1 p.m.; the City lists both 7:30 a.m. and 8 a.m. openings, closing at 4 p.m. |
| Building Official and Director | Derek Zwagerman, P.E., 541-423-1024 |
| Online portal | Oregon ePermitting, for contractor applications, payments and inspections |
| Floodplain questions | Planning, 541-664-3321, ext. 245 or 243 |
Permit types
Residential permits
The City publishes separate building, mechanical, plumbing, electrical, fire sprinkler/alarm/hood and swimming pool applications. The residential intake checklist asks for a site plan to scale with distances to property lines and between structures, a foundation plan with hold-downs and reinforcing, floor plans showing smoke and carbon monoxide alarms and equipment, a cross section, elevations from floor to eave and grade to ridge, a wall bracing plan, framing plans with stamped truss drawings, calculations for members outside the span tables, energy compliance and the whole-house ventilation method. Owners acting as their own general contractor also sign the state’s property owner statement. For prescriptive designs the City lists 25 psf roof and 36 psf ground snow loads, a 12-inch frost depth, 96 mph wind and seismic design category D0.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial work is reviewed under the 2025 Oregon Structural and Mechanical Specialty Codes, with a 25 psf minimum roof snow load and geotechnical reports under section 1803 where required. Plan review is 65% of the permit fee, plus 40% for fire and life safety review when needed, and commercial mechanical, plumbing and electrical permits carry a 35% plan review fee. Phased projects pay at least $250 plus 10% of the total building permit fee, up to $1,500 a phase; deferred submittals pay 65% of the fee on their value, at least $150. Shell buildings are valued at 80% of the building valuation and the tenant improvement at 20%, and a foundation-only permit uses 10% of the total building value.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
Check zoning first: accessory buildings in residential zones may not exceed 15 feet to the highest point, and a detached one more than 55 feet from the street and at least 10 feet from other buildings may sit 5 feet from a side or rear line that does not adjoin a street; corner lots need a 10-foot street side yard, and ADUs follow chapter 17.77. Public Works then sets conditions: nothing may be built in a public utility easement, each house needs two covered off-street parking spaces, all four property corner monuments must be in place before a foundation is poured, and sites under one acre with ground disturbance need a Storm Drain Protection Permit. Seven streams cross the city, and any project in flood zones A, AE or AO needs a floodplain development permit; FEMA lists Central Point as participating in the National Flood Insurance Program, with a current map dated May 3, 2011.
Central Point permit costs and fees
The Building page links the City of Central Point Building Permit Fee Schedule effective January 1, 2024. Valuation uses the ICC table for good construction with the Oregon modifier, or the applicant’s estimate if higher. The City’s cost information sheet words the surcharge this way: the Building Codes Division “requires that the City of Central Point collect a 12% surcharge that is added to permits.”
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee or rule |
|---|---|
| Valuation $1 to $2,000 (minimum) | $85.00 |
| $2,001 to $25,000 | $85.00 plus $7.95 per added $1,000 or fraction |
| $25,001 to $50,000 | $267.85 plus $7.85 per added $1,000 |
| $50,001 to $100,000 | $464.10 plus $5.90 per added $1,000 |
| Over $100,000 | $759.10 plus $5.25 per added $1,000 |
| Plan review | 65% of the permit fee; fire and life safety 40% |
| New house plumbing | $300 one bath, $375 two, $425 three |
| New house electrical | $135 up to 1,000 sq ft, plus $25 per added 500 sq ft |
| Mechanical | $85 minimum; furnace up to 100,000 BTU or heat pump $25 each |
| Prescriptive solar | $150, plan review included |
| Reinspection | $75, charged after three disapproved inspections |
| Plan review outside the permit (changes, pre-application) | $50 an hour, one-hour minimum |
| Temporary certificate of occupancy | $50 for each specialty code, renewed every 30 days |
Worked example. A project valued at $150,000: $759.10 plus 50 × $5.25 ($262.50) gives a permit fee of $1,021.60. Plan review at 65% adds $664.04 and the 12% surcharge $122.59, for $1,808.23 before trade permits.
The City’s permit cost sheet, dated November 2024, works from this same table: its $15,000 remodel shows the $188.35 the table gives. Two of its examples do not add up, among them a 400 sq ft addition valued at $66,268 priced at $738.05 where the table gives $564.40, so check any quote against the schedule. The sheet also lists what a new house pays besides permits: a $250 water connection, $50 water quality, $335 Public Works plan review and $30 planning review, the school construction excise tax at $1.17 per sq ft of habitable space, and SDCs for streets ($2,326), storm drains ($514), water treatment ($2,366.74), parks and water. Its parks and water figures are out of date: on February 12, 2026 the Council raised the parks SDC from $2,445 to $2,805.46 per single-family home and rebuilt the water SDC by meter size, with the base charge going from $1,552 to $3,037, both effective April 13, 2026. These pass-through fees must be paid by check or cash, not card.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them
Central Point issues and inspects its own electrical permits as well as plumbing and mechanical. New-house electrical permits are priced by floor area and services start at $80 for 200 amps or less; plumbing permits for remodels and commercial work are priced per fixture, at least $65; a pool needs its own electrical permit.
Licensing
- Paid contractors need a Construction Contractors Board license
- Owners who are not CCB-licensed sign the property owner statement for residential building, electrical, mechanical and plumbing permits
- An owner who hires subcontractors must hire only CCB-licensed ones
- Licensed architects and engineers are exempt from the statement
Filing
- Contractors: Oregon ePermitting, plus the City application form
- Owners: the City’s own application forms, sent to the Building Division
- An electrical master permit costs $250 to set up and $125 per inspection
- Written authority from the owner when someone else applies
How to apply for a Central Point building permit
Ask Planning about setbacks, accessory limits and whether the lot is in a regulated floodplain.
Follow the residential intake checklist and the City’s design criteria sheet.
Fill in the building application and any trade applications; owners add the property owner statement.
Contractors apply and pay in Oregon ePermitting with the City form and plans attached; owners send the City forms and plans to the Building Division.
Driveway, sidewalk and utility permits, a Storm Drain Protection Permit and a floodplain permit where they apply.
Pay permit fees, and SDCs and school tax by check or cash, then book inspections.
Review, corrections and what causes delay
Central Point publishes no review time. Its intake checklist lists the minimum a residential submittal must contain, from the scaled site plan to the bracing, energy and ventilation details, and the Building page requires the City application form with every set of plans, including those filed through the state portal. Plan changes and pre-application review are charged at $50 an hour, and pass-through fees cannot be paid by card.
Inspections in Central Point
Contractors schedule inspections in Oregon ePermitting; for other inspection requests contact the Building Division. Before a foundation pour, the four property corner monuments must be in place, and the contractor must keep the street clear of debris and drain roofs, areas and crawl spaces away from the building.
Want this handled start to finish?
Get a free quote →No one may occupy a new structure until the certificate of occupancy has been signed by both the Building Official and the Public Works Director, and residential water service starts only after that; temporary water is for construction only. Inspections outside business hours or with no set fee are billed at $85 an hour, a change of occupancy inspection costs $150, and work started without a permit carries an $85-an-hour investigation fee.
Central Point permit search and official resources
Permits bought through Oregon ePermitting can be tracked in its public search. For older City permits, plans or certificates of occupancy, contact the Building Division at 541-664-3321 or building@centralpointoregon.gov; the City’s municipal code is published online by Code Publishing.
- Central Point Building Division
- Building permit fee schedule, effective January 1, 2024
- Permit cost information and examples
- Residential plan submittal intake checklist
- Design criteria and current codes
- Accessory structure information
- Swimming pool safety
- Public Works permits and conditions
- Floodplain management
- Central Point Municipal Code
- BCD Local Building Department Directory
- 2026 Oregon Residential Specialty Code, chapter 1
- Oregon ePermitting
- Oregon Construction Contractors Board
Inspections are where schedules slip.
Get a free quote →Central Point building permit FAQ
Does Central Point issue electrical permits?
Yes. The Building Division issues and inspects electrical, plumbing and mechanical permits as well as building permits.
How much is a building permit in Central Point?
The minimum is $85. A $150,000 project pays $1,021.60 plus 65% plan review and the 12% surcharge, about $1,808, before trade permits and SDCs.
Can I pay SDCs by credit card?
No. Pass-through fees such as SDCs and the school construction excise tax must be paid by check or cash.
Do I need a permit for a shed?
Not for a nonhabitable one-story shed up to 200 sq ft and 15 feet high, but it must meet zoning setbacks, and in a residential zone no accessory building may exceed 15 feet to its highest point.
Can I move into my new house after the final inspection?
Only once the certificate of occupancy is signed by both the Building Official and the Public Works Director; water service starts after that.
Do I need a permit for a fence?
Wood, wire mesh and chain link fences up to 7 feet need no building permit unless they are pool barriers, but every fence proposal goes through Public Works review, and fences in a utility easement need the Public Works Director’s approval.
Simplify Central Point permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Central Point sooner?
Let Alliance prepare, file, and track your Central Point permits while your crew stays on the job.
More Oregon permitting guides
Jackson County
Read guide →Ashland
Read guide →Medford
Read guide →Clackamas County Building Permit Guide
Read guide →Clatsop County Building Permit Guide
Read guide →Columbia County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Central Point permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.