Skip to main content

Coos County, Oregon Building Permit Guide

Coos County runs a full building codes program from Coquille, including septic. Every permit, even electrical and plumbing, starts with land use authorization from the planning office for the property.

Authority: Community Development, Building DepartmentOffices: CoquilleFiling: Oregon ePermitting or in person
Main office
541-396-7770Building, planning, septic
Inspection line
541-266-1098Or email, ePermitting
Lakeside
541-759-3009Own building department
Road Department
541-396-76601281 W. Central

The Coos County Building Department, part of Community Development, runs a full building codes program. Its structural inspector covers the whole county except the Cities of Coos Bay and North Bend. Septic permits and inspections are handled by the county’s own Onsite Septic Program, to which DEQ has delegated the program.

This guide covers the county program and its septic, floodplain and road offices. The county’s pages disagree on which areas get county plumbing and electrical inspections and on walk-in days, so both versions are given below; confirm with the county.

What requires a building permit in Coos County?

Land use authorization must accompany every permit request, including electrical and plumbing. Properties without municipal sewer need an onsite system permit from the county.

Oregon’s building code and its exemptions are the same in Coos County as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works

Short on time to read all of this?

Get a free quote →

Who handles permitting in Coos County?

The county’s pages describe its reach two ways. The Building Department page says county inspectors do plumbing and electrical inspections for all of Coos County. The homeowner guide says Coos County issues all building permits except structural and mechanical inside North Bend or Coos Bay, and handles electrical and plumbing everywhere except the City of Lakeside, which has its own building department (541-759-3009).

Coos County permit offices
ForOfficeContact
Planning outside city limitsCoos County Planning541-396-7770; planning@co.coos.or.us
Coquille planningCity planning office541-396-2115x 203
Bandon planningCity planning office541-347-7922
Myrtle Point planningCity planning office541-572-2626
RoadsCoos County Road Department, 1281 W. Central, Coquille541-396-7660; M-TH 7:00am-5:30pm

Not sure this scope needs a permit?

Get a free quote →

Filing and walk-ins in Coos County

Permits can be applied for through Oregon ePermitting, or fillable forms can be filed in person at 60 E. 2nd St., Coquille, or mailed to 250 N. Baxter, Coquille. Permit specialists take walk-ins from 7:30 am to 12:00 pm and 1:00 pm to 4:30 pm; the Building Department page says Monday through Friday, while the permit-application page says Monday through Thursday.

Coos County permit costs and fees

Coos County’s land use fees (effective 7/1/26, Order 26-06-021L) list a floodplain review without a notice of decision at 546.00 dollars, or 955.00 with one, and a rural address at 241.00.

Oregon fixes the method rather than the price: new construction is valued with the ICC building valuation data under OAR 918-050-0100, Coos County applies its own schedule, and a 12 percent state surcharge is added to every permit fee. How Oregon permit fees are set

Rather talk it over?

Call 1-855-478-4290 →

How to get a building permit in Coos County

1. Authorization to build

Get it from the planning office for the property’s jurisdiction: Coos County Planning outside city limits, or Coquille, Bandon or Myrtle Point.

2. Septic

Get an Onsite Septic Installation Permit if the property has no municipal sewer.

3. Assemble the structural application

Zoning Compliance Letter, septic permit if applicable, a full plan set and the checklist.

4. File

Oregon ePermitting, in person in Coquille, or by mail.

5. Allow for review

Plan review may take up to 8 weeks in peak season; permits are valid for 180 days from issue or last inspection.

An Oregon building permit expires if work does not start within 180 days of issue or stops for 180 days; the building official can extend it in writing, 180 days at a time. Oregon’s statewide code rules

Inspections in Coos County

Request inspections on the inspection line 541-266-1098, by email, through the e-permitting system, or via the main office at 541-396-7770.

Rather not deal with the Coos County building department?

Get a free quote →

Official Coos County permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Frequently asked questions

Want this handled start to finish?

Get a free quote →

Does Coos County issue permits inside Coos Bay and North Bend?

Partly. Its structural inspector covers the county except those two cities; the homeowner guide says the county issues all permits there except structural and mechanical.

Who issues permits in Lakeside?

The county’s homeowner guide says the City of Lakeside has its own building department (541-759-3009); the Building Department page says county inspectors do plumbing and electrical for all of the county, so confirm.

How long is a Coos County permit valid?

180 days from issue or from the last inspection.

Simplify Coos County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build
  • Get land use authorization from the right planning office before the permit
  • Assemble the Zoning Compliance Letter, septic permit, plan set and checklist
  • File through Oregon ePermitting and book inspections on the county line

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Coos County sooner?

Let Alliance prepare, file, and track your Coos County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Coos County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.