Skip to main content
Municipal GuideOregonDouglas County

Douglas County, Oregon Building Permit Guide

Inside Roseburg, a project takes two steps: City of Roseburg site plan review first, then the structural plans and the city approval go to the Douglas County Building Department.

Authority: Douglas County Building DepartmentOffices: Justice Building, RoseburgIn Roseburg: City site plan review first
County Building Department
541-440-4559Code questions, inspections
Roseburg Community Development
541-492-6750Site plan review
Roseburg Public Works
541-492-6730Street closures
Sanitary Authority
541-672-1551Roseburg

The Douglas County Building Department is in Room 106 of the Justice Building, 1036 SE Douglas Ave., Roseburg, OR 97470, phone 541-440-4559, as listed by the City of Roseburg. Since July 1, 2007 it has done the building plan review and inspections for properties inside Roseburg, and it issues all plumbing, electrical and mechanical permits within the city limits.

Douglas County’s own website could not be checked, so its coverage outside Roseburg, office hours, fees and septic rules are not given here; contact the county Building Department directly. The rest of this guide comes from City of Roseburg pages.

What requires a building permit in Douglas County?

In Roseburg, the City’s site plan review under Chapter 12.06 of the Roseburg Municipal Code is required for most development, including grading/paving, new construction, additions, remodeling, demolition and new signage. Every demolition inside the city limits needs a City site review and a fire department demolition checklist. Fence standards are in Section 12.08.040(G) of the Roseburg Municipal Code, with diagrams for corner and interior lots.

Short on time to read all of this?

Get a free quote →

Oregon’s building code and its exemptions are the same in Douglas County as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works

Who handles permitting in Douglas County?

Offices for a Roseburg project
ForOfficeContact
Building plan review, inspections, trade permitsDouglas County Building Department, Room 106, Justice Building, 1036 SE Douglas Ave.541-440-4559
Site plan reviewCity of Roseburg Community Development, City Hall 3rd floor, 900 SE Douglas Avenue541-492-6750; cdd@roseburgor.gov
Street closuresCity of Roseburg Public Works541-492-6730
SewerRoseburg Urban Sanitary Authority, 1297 NE Grandview Dr.541-672-1551

Not sure this scope needs a permit?

Get a free quote →

Roseburg Community Development is open Monday - Friday 8 a.m. - 5:00 p.m., closed for lunch 12 p.m. - 1 p.m.

How to get a building permit in Roseburg

1. Create a portal account

Roseburg site review applications are filed on the City’s OpenGov portal (roseburgor.portal.opengov.com).

2. Site plan review

Most residential submittals need a site plan, floor plans and building elevations; review is generally a two-week process.

3. Take it to the county

Bring the structural plans and copies of the city approval to the Douglas County Building Department.

4. Schedule inspections

Call the county at (541) 440-4559 for inspections and code questions.

An Oregon building permit expires if work does not start within 180 days of issue or stops for 180 days; the building official can extend it in writing, 180 days at a time. Oregon’s statewide code rules

Rather talk it over?

Call 1-855-478-4290 →

Demolition in Roseburg

Typical City review of a demolition is 1-2 days for residential and 2 weeks for multifamily, commercial and industrial projects. Closing part of a street needs approval from Roseburg Public Works (541-492-6730). Demolishing a manufactured home needs additional review by the state Building Codes Division and the Douglas County Assessor’s Office, and the City’s handout also sends applicants to the Roseburg Urban Sanitary Authority.

Inspections in Douglas County

For Roseburg projects, building code questions and inspection scheduling go to the Douglas County Building Department at (541) 440-4559.

Official Douglas County permitting resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Rather not deal with the Douglas County building department?

Get a free quote →

Frequently asked questions

Who issues building permits inside Roseburg?

The Douglas County Building Department does the plan review and inspections and issues all plumbing, electrical and mechanical permits; the City does the site plan review first.

Want this handled start to finish?

Get a free quote →

How long is Roseburg site plan review?

Generally a two-week process; demolition review is typically 1-2 days for residential and 2 weeks for larger projects.

Where is the Douglas County Building Department?

Room 106 of the Justice Building, 1036 SE Douglas Ave., Roseburg, OR 97470, phone 541-440-4559.

Simplify Douglas County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build
  • File the Roseburg site plan review on the City’s OpenGov portal
  • Carry the city approval and structural plans to the Douglas County Building Department
  • Coordinate demolition checklists, street closures and inspections

Inspections are where schedules slip.

Get a free quote →

Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Douglas County sooner?

Let Alliance prepare, file, and track your Douglas County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Douglas County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.