Tigard, Oregon Building Permit Guide

Everything contractors, builders and developers need to pull a City of Tigard building permit — the Building Division, the uniform statewide code, southwest Portland-metro growth, land-use review, and Cascadia seismic design.

Authority: Building DivisionOffices: TigardCounter: Mon–Thu, 8–6
Southwest metro
Portland’s SW suburbsSteady pipeline
Retail and transit growth
Regional shopping hubCommercial work
Uniform state code
Same code statewideLocal administration
Cascadia seismic
Valley riskDesign criteria first

Tigard is a southwest Portland-metro city in Washington County at about 58,000 residents, a retail and transit hub between Portland and the western suburbs. Building permits are issued by the city’s Building Division, which handles plan review, permits and inspections under the uniform statewide code.

This guide covers the Building Division and how to reach it, the uniform statewide code, land-use review that sits alongside a permit, and how fees and inspections work.

This guide covers work inside the City of Tigard limits. Washington County and neighbouring Beaverton, Tualatin and King City are separate authorities.

🏦

Tigard runs its own Building Division within a growing southwest-metro corridor, so land-use, transit-oriented and design review often shape a project alongside the building code. The division administers the uniform state code; confirm whether a parcel is inside the city or in unincorporated Washington County, and pull Cascadia seismic values from the state Design Criteria Hub.

What requires a building permit in Tigard?

Permit required

  • New residential and commercial construction, additions, alterations and conversions
  • Structural and load-bearing work, foundations, decks over the exempt height, and retaining walls above the code threshold
  • Finishing basements and attics, garage conversions and any change of use or occupancy
  • Electrical work under the Oregon Electrical Specialty Code, including services, circuits, solar and EV charging
  • Plumbing under the Oregon Plumbing Specialty Code, and mechanical work under the mechanical code
  • Re-roofing above the exempt scope, in-ground pools, signs and demolition; on houses, only fire-rated siding and door or window work that changes a structural member

Typically exempt

  • Painting, papering, tiling, carpeting, cabinets and similar finish work
  • One-story detached accessory structures below the code floor-area exemption
  • Wood, wire-mesh and chain-link fences, exempt by statewide code
  • Minor repairs replacing materials in kind, and like-for-like fixture swaps

Short on time to read all of this?

Get a free quote →

Which code applies — OSSC or ORSC

The Oregon Residential Specialty Code (ORSC) governs one- and two-family dwellings and townhouses and their accessory structures; the Oregon Structural Specialty Code (OSSC) governs commercial buildings, apartments of three or more units and everything outside the residential scope. Alongside them sit the mechanical, plumbing, electrical and energy specialty codes, and the Oregon Fire Code is adopted by the State Fire Marshal. In Tigard, the city’s Building Division administers the state code alongside the city’s land-use and design review.

Oregon’s building code and its exemptions are the same in Tigard as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works

Who handles permitting in Tigard?

The Building Division handles plan review, permit issuance and inspections inside the city, with land-use and planning review alongside.

Tigard permitting contact
DetailInformation
AuthorityCity of Tigard Building Division
OfficesTigard
ServesWork inside the City of Tigard limits
MetroSouthwest Portland metro, in Washington County
CodeOregon Specialty Codes (uniform statewide)
SeismicCascadia design via the state Design Criteria Hub
Land useLand-use and design review alongside the permit
Contractor credentialsCCB licence for almost any paid job

The Building Division reviews plans, issues permits and inspects construction inside the city. A regional retail base and transit-oriented redevelopment keep both commercial and residential volume high, and land-use and design review can clear ahead of the building permit. Confirm the jurisdiction from the parcel first, since unincorporated Washington County and the neighbouring cities run their own counters.

The technical code is the uniform state code; what Tigard adds is land use, the fee schedule and the inspection process.

In 2025, building permits issued in Tigard authorized 228 new privately owned housing units, 157 of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.

Not sure this scope needs a permit?

Get a free quote →

Permit types

Residential permits

Residential work spans infill, redevelopment and accessory dwelling units. Re-roofs beyond the exempt scope, solar and EV chargers need permits, seismic detailing applies broadly, and every contractor needs a current CCB licence, apart from casual work under $1,000 and owners working on their own property.

Commercial permits

Commercial work runs from regional retail and mixed-use to transit-oriented redevelopment, all subject to plan review, land use, and the CCB licence requirement, with electrical and plumbing work generally done by state-licensed trades.

Contractors need a current Construction Contractors Board licence with the right endorsement for a job of any size; the exceptions are casual work under $1,000 by someone who does not advertise as a contractor, and owners working on their own property who are not building to sell. Contractor licensing in Oregon

Tigard permit costs and fees

Budget the city building permit and plan-review fees, the statewide surcharge, separate trade permits, and any land-use or design review a parcel triggers. Fees follow Oregon’s statewide valuation method with the city schedule.

How Tigard permit fees are structured
Fee componentHow it works
Building permitBased on Oregon’s statewide valuation method; the schedule is set locally
Plan reviewA percentage of the building permit fee, charged at submittal
Trade permitsSeparate electrical, plumbing and mechanical fees
State surchargeA statewide percentage surcharge added to permit fees
Land-use reviewZoning, design or land-use review where the project triggers it
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

Rather talk it over?

Call 1-855-478-4290 →
🧮

Need a real number for a specific Tigard project? Send us the scope, address and valuation and we will identify the filing path, the reviews it will trigger and the fee categories that will apply.

Oregon fixes the method rather than the price: new construction is valued with the ICC building valuation data under OAR 918-050-0100, Tigard applies its own schedule, and a 12 percent state surcharge is added to every permit fee. How Oregon permit fees are set

Trade permits and who may pull them

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work on commercial and multi-family structures

Typically exempt

  • Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
  • Clearing a stoppage without replacing or rearranging concealed piping
  • Filter, thermostat and routine component service
  • Like-for-like appliance repair that does not alter the connection

Electricians and plumbers are licensed by the state, though an owner may do electrical work on their own home and plumbing work that is not for hire. An electrical permit is needed for new or altered wiring; like-for-like repairs of outlets, switches and fixtures, and bulb, fuse and small-appliance swaps, are exempt. Electrical and plumbing permits in Oregon

Rather not deal with the building department?

Get a free quote →

How to apply for a Tigard building permit

1. Confirm city limits versus Washington County

Beaverton, Tualatin, King City and unincorporated ground are separate authorities.

2. Clear land-use or design review where it applies

Some parcels raise it ahead of the building permit.

3. Pull seismic values from the Design Criteria Hub

Cascadia design applies broadly in the valley.

4. Confirm every contractor holds a CCB licence

Oregon requires it for almost any paid job; the exceptions are casual work under $1,000 and owners working on their own property.

5. Confirm electrical and plumbing state licences

An owner may do electrical work on their own home and plumbing work not done for hire; otherwise the installer needs the state trade licence.

6. Assemble the city submittal and file

Confirm the sets and forms the Building Division needs.

An Oregon building permit expires if work does not start within 180 days of issue or stops for 180 days; the building official can extend it in writing, 180 days at a time. Oregon’s statewide code rules

Inspections in Tigard

Standard checkpoints include footing and foundation, under-floor and slab, framing, rough-in electrical, plumbing and mechanical, insulation and energy, fire systems on commercial work, and final, with occupancy approval before use. Redevelopment and infill work adds site and existing-condition verification.

Many Oregon jurisdictions take inspection requests online, several through the state ePermitting system; confirm the method the Building Division uses and give the notice it asks for.

Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, the seismic and energy documentation, product listings and your correction responses available on site.

Tigard permit search and official resources

Permit records in Oregon sit with the authority that issued them — where the Building Division administers the code, it holds the building permit, the inspection history and the certificate of occupancy for work in the City of Tigard limits. Many jurisdictions expose permit search through the state ePermitting portal. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was.

Want this handled start to finish?

Get a free quote →
🔍

The code is statewide, but the counter is local. Fees, submittal lists, review turnaround and land-use requirements are set by the administering jurisdiction; the technical code is not. Confirm current requirements, fees and review turnaround for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and portal procedures change — confirm the position for your filing date.

Frequently asked questions

Where do I get a Tigard building permit?

From the city’s Building Division, which handles plan review, permits and inspections inside the city.

Is Tigard’s permitting separate from Washington County’s?

Yes. Work inside Tigard files with the city; unincorporated Washington County files with the county’s Building Services.

Is the building code different from Washington County?

No. Oregon runs one uniform code statewide; what differs is the administering office, the fee schedule and the land-use rules.

Inspections are where schedules slip.

Get a free quote →

Do I need a contractor licence for a small Tigard job?

Almost always. Oregon requires a current CCB licence for construction work of any size; the exceptions are work under $1,000 that is casual, minor or inconsequential, by someone who does not advertise as a contractor, and owners working on their own property who are not building to sell.

Does seismic design apply in Tigard?

Yes. Cascadia seismic design applies broadly; pull site-specific values from the state Design Criteria Hub.

How do I run a Tigard permit search?

Use the city’s own permit search; the permit and inspection history sit with the city.

Simplify Tigard permitting with Alliance Permitting

Tigard runs a full-service Building Division in a growing southwest-metro corridor, so jurisdiction, land use and sequence are what matter. Confirming those up front keeps a filing predictable.

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Tigard because the work is done by people who have stood at the counter:

  • We confirm city-versus-county jurisdiction from the parcel.
  • We clear land-use and design review before the building permit.
  • We pull seismic values from the state Design Criteria Hub.
  • We verify every contractor holds a current CCB licence.
  • We assemble the city plan set and track the review.

Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Tigard sooner?

Let Alliance prepare, file, and track your Tigard permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Tigard permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.