Municipal Guide Oregon Washington County

Beaverton Building Permit Guide

Everything contractors, builders, and developers need to get a building permit in Beaverton, OR - requirements, BEPS, fees, trade permits, and inspections.

Authority: City of Beaverton Building DivisionCode: Oregon State Building CodePortal: BEPS
Authority
City of Beaverton Building DivisionBuilding Division, Community Development
Apply
BEPSApply, track, pay, inspect
Code cycle
Oregon specialty codesStatewide code + local standards
Permit fee
Valuation-basedPer local/state fee schedule

Building permits in Beaverton, OR are handled by Building Division, Community Development. Oregon uses a statewide building code system administered by the Oregon Building Codes Division, while city and county building departments manage local intake, plan review, fees, and inspections.

This guide covers what requires a permit, how to apply through BEPS, permit fees, trade permits, and inspections - so your Oregon project can move from submittal to approval with fewer correction cycles.

📍

Confirm the authority having jurisdiction before filing. This guide covers properties inside Beaverton city limits. Washington County handles unincorporated property outside the city. Oregon cities and counties often split building, planning, public works, septic, fire, and right-of-way approvals across different offices.

📄

Oregon is a statewide code state. Projects are reviewed against the Oregon State Building Code and adopted specialty codes, plus local zoning, land-use, floodplain, system development charge, and public-works standards. Commercial, multi-family, and engineered scopes may require Oregon-licensed design professionals.

The Beaverton Electronic Permitting System (BEPS) provides online access for applications, inspections, project tracking, and fee payment.

What requires a building permit in Beaverton?

Under Oregon specialty codes and local ordinances, a permit is required before most construction, alteration, demolition, repair, relocation, occupancy change, and trade work begins.

Permit required

  • New residential, commercial, industrial, and mixed-use construction
  • Additions, structural alterations, tenant improvements, conversions, and change of occupancy
  • Structural repairs, seismic work, decks, porches, garages, carports, and many accessory structures
  • Electrical service changes, panel upgrades, EV chargers, solar PV, and permanent wiring
  • Plumbing, water heaters, repipes, sewer connections, gas piping, and fixture relocations
  • Mechanical equipment, HVAC replacements, ductwork, commercial kitchen hoods, and exhaust systems
  • Demolition, signs, grading, retaining walls, floodplain work, and right-of-way work where applicable

Typically exempt

  • Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work
  • Minor repairs that replace like-for-like materials without structural or system changes
  • Small detached accessory structures below the local exemption threshold and without utilities
  • Some fences, patios, and non-structural site work, subject to zoning and local limits

Exemptions are narrow. Zoning, setbacks, floodplain, easements, historic review, or HOA requirements may still apply even when a building permit is not required.

Get the permit issued before starting work. Work without a permit can lead to correction notices, stop-work orders, double fees, required engineering, or removal of unapproved work.

Who handles permitting in Beaverton?

Building Division, Community Development handles permit intake, plan review coordination, permit issuance, and construction inspections for properties inside Beaverton city limits. Washington County handles unincorporated property outside the city.

Beaverton permitting - contact
DetailInformation
OfficeBuilding Division, Community Development
ApplyBEPS
CodeOregon State Building Code and adopted Oregon specialty codes
Jurisdictionproperties inside Beaverton city limits. Washington County handles unincorporated property outside the city.
Review timelineVaries by permit type, completeness, valuation, occupancy, and outside-agency reviews
Contractor licenseOregon CCB license plus applicable trade credentials and local registration where required
💻

Apply through BEPS when available. Submit the application, upload plans, respond to review comments, pay fees, download approved documents, and schedule inspections through the official online process.

Beaverton building permit cost

Building permit costs in Beaverton are usually based on project valuation, permit type, trade scope, plan review, and any local development or system charges. Final fees are assessed by the jurisdiction after intake and review.

How Beaverton permit fees are structured
Fee componentHow it works
Residential building permitUsually valuation-based, with plan review and inspection fees where applicable
Commercial building permitValuation and occupancy based; larger projects may include phased/deferred submittal fees
Trade permitsSeparate electrical, plumbing, mechanical, manufactured structure, and specialty fees may apply
Planning / zoning / land useMay be required before or during building review, especially for site changes or new use
Public works / SDCsTransportation, water, sewer, stormwater, right-of-way, and system development charges may apply
Revisions / re-inspectionsAdditional fees may apply for revised drawings, failed inspections, or expired permits
🧮

Want a precise number for a specific Beaverton project? Send us the scope, address, and valuation and we will return a filing path, fee-risk notes, and timeline estimate.

Beaverton trade permits

Electrical, plumbing, mechanical, manufactured structure, fire, and specialty scopes may require separate permits and licensed trades. Some trade permits can be pulled independently, while others must be tied to a building permit or plan-review record.

Electrical permits

Required for electrical services, feeders, panels, branch circuits, EV chargers, solar PV, generators, and most permanent wiring. Oregon licensing and permit rules apply, and utilities may require separate service coordination.

Plumbing & gas permits

Required for water, waste, vent, fixtures, backflow, water heaters, sewer, and gas piping work. Septic or onsite wastewater review may be separate for rural properties.

Mechanical permits

Required for HVAC equipment, ductwork, ventilation, commercial hoods, gas appliances, exhaust systems, and similar mechanical scope.

Specialty permits

Depending on scope, projects may also need demolition, sign, fire alarm/sprinkler, grading, erosion control, floodplain, right-of-way, driveway, tree, or public works permits.

💼

Verify Oregon licensing before filing. Most paid construction work requires an active Oregon Construction Contractors Board license, and trade work may require additional Oregon specialty credentials. Permit applications should match the contractor, license, owner, scope, and valuation.

How to get a building permit in Beaverton

Confirm permit requirement & jurisdiction

Verify that the address falls under City of Beaverton Building Division. Check zoning, land use, floodplain, historic, septic, utility, fire, and right-of-way requirements before preparing drawings.

Prepare your application package

Assemble the application, site plan, construction drawings, structural calculations, energy forms, scope narrative, valuation, contractor information, and owner authorization. Commercial and engineered projects may need Oregon-licensed professionals.

Submit application & plans

Submit through BEPS or the official instructions published by Building Division, Community Development. Choose the correct permit record type and upload complete drawings and supporting documents.

Plan review & corrections

Staff review the project against Oregon specialty codes and local development standards. Respond to correction notices with revised plans and a clear response letter.

Pay fees & receive permit

Pay assessed plan review, building, trade, SDC, and other fees. Download the issued permit and approved plan set and post them on-site before construction begins.

Schedule inspections

Use the official inspection process to schedule footing, foundation, framing, rough-in MEP, insulation, fire/life-safety, and final inspections as applicable. Obtain final approval or certificate of occupancy before use.

Inspections in Beaverton

Schedule inspections through BEPS or the inspection process published by Building Division, Community Development. Standard checkpoints can include erosion control, footing, foundation, framing, rough electrical, rough plumbing, rough mechanical, insulation, drywall/fire assemblies, final trade, and final building inspections.

Keep the permit card, approved drawings, engineering, deferred submittals, product approvals, and revision documents on site. Failed inspections or missing documents can delay finals and trigger re-inspection fees.

Official Beaverton permitting resources

Simplify Beaverton permitting with Alliance Permitting

Beaverton permitting rewards applicants who submit complete packages, use the correct portal, and resolve jurisdiction issues early. Alliance Permitting is a permit expediter for Beaverton - our permit expediting services pair AI-driven document review with experts who understand Oregon building permit workflows, so your submission moves faster.

250K+Permits approved
All 50States covered
AI + HumanExpert filing
Done-for-youWe file, you build

Trusted by leading builders and brands - including Dream Finders Homes, Tesla, Verizon, Hyatt, and Sunnova.

Contractors and builders choose Alliance for Beaverton because we deliver:

  • Local filing strategy - we confirm the correct Oregon AHJ, portal, permit type, and required documents before submittal.
  • Complete package control - applications, plans, license info, valuations, revisions, and inspection requirements stay organized.
  • Fewer correction cycles - AI pre-checks plus expert review catch missing documents, scope mismatches, and format problems early.

Alliance Permitting is a permit documentation and submission company: we prepare your paperwork, file it correctly, and coordinate with the building department through issuance. We are not a contractor and do not perform licensed plan review or inspections; that work stays with your team and the jurisdiction.

Need a Beaverton building permit?

Get your Beaverton project permitted right. Alliance Permitting handles applications, corrections, and permit coordination - so you build, not wait.

This guide is provided by Alliance Permitting for general informational purposes and reflects publicly available information believed accurate as of June 2026. Permit requirements, fees, portals, and review processes change; always confirm current details with the local building department before filing. This is not legal advice.

Expedite Your Permits Today!

Free Quote1-855-478-4290