Skip to main content
Municipal GuideOregonNewport · Lincoln County

Newport, Oregon Building Permit Guide

To get a building permit in Newport, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Newport’s Community Development Department at City Hall issues and inspects building, electrical, mechanical and plumbing permits for the city, Monday to Thursday, with permits and plans handled in Oregon ePermitting.

Authority: Newport Community DevelopmentCode: 2025 OSSC; 2026 ORSC (phase-in to April 2027)Phone: 541-574-0629
Authority
Community Development169 SW Coast Highway
Hours
Mon–Thu, 8 a.m. to 6 p.m.City Hall closed Fridays
Inspections
541-574-0628Monday to Thursday
Minimum fee
$752026-27 schedule

The City of Newport handles every building permit inside its limits through the Community Development Department: structural, electrical, mechanical and plumbing permits, plan review and inspections. Licensed contractors buy permits, submit plans and get their certificate of occupancy in Oregon ePermitting, and paper applications are available at City Hall. Under the fee schedule for July 1, 2026 to June 30, 2027, a building permit starts at $75, plan review is 65% of the permit fee and a 12% state surcharge is added to permit fees but not to plan review.

Community Development is at Newport City Hall, 169 SW Coast Highway (541-574-0629). City Hall is open Monday to Thursday, 8 a.m. to 6 p.m., and closed on Fridays and holidays. The state’s directory lists Joseph Lease as Building Official; he keeps office hours from 8 to 9 a.m., Monday to Thursday, or by appointment. Newport, in Lincoln County, had 10,383 residents in the Census estimate for 2025.

The City permits inside Newport’s city limits. Unincorporated Lincoln County is permitted by the Lincoln County Building Division.

What requires a building permit in Newport?

Newport’s document center lists the City’s permit forms: commercial and residential building permits, demolition, commercial and residential electrical, renewable energy electrical, commercial fire systems, grading, manufactured homes, mechanical, plumbing, commercial reroofs and signs. Any work in the City right-of-way needs a right-of-way or encroachment permit. For houses, the permit and exemption rules are those in chapter 1 of the 2026 Oregon Residential Specialty Code, mandatory since October 1, 2026; the City’s FAQ still quotes a 10-foot height limit for small sheds from the older code, while the 2026 code allows 15 feet.

Permit required

  • New buildings, additions and structural alterations, including partial or interior demolition
  • Demolition of a whole building
  • Almost any electrical or plumbing work beyond basic maintenance
  • New heating, venting and air conditioning equipment and kitchen hood systems
  • Grading, signs, commercial reroofs and fire systems
  • Work in the City right-of-way

No building permit under the 2026 ORSC

  • Nonhabitable detached accessory buildings of one story, 200 sq ft or less and up to 15 feet high at the average roof
  • Decks and porches 30 inches or less above grade
  • Concrete sidewalks, slabs and driveways; painting, cabinets and countertops
  • Fences of wood, wire or chain link up to 7 feet, unless part of a pool barrier
  • Retaining walls 4 feet or less that do not support a surcharge, a steep slope or a building

What Newport decides and what the state holds

The state writes the building code. Newport adopts a new fee schedule each fiscal year, with its land use fees adjusted for inflation by the CPI-U under Municipal Code chapter 14.60, and it controls its own zoning and design overlays, geologic hazard rules, shoreland and estuary permits, system development charges and the City’s affordable housing construction excise tax.

Short on time to read all of this?

Get a free quote →

Oregon’s building code and its exemptions are the same in Newport as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works

Newport building department: who handles permitting

One department covers both building and land use: Community Development runs the City’s land use planning and urban renewal programs and its building program, collects SDCs and building fees, reviews construction plans and inspects. Because Newport issues electrical permits itself, the City also inspects electrical work, with Class A electrical inspections on set days. Septic permits for lots without sewer come from Lincoln County’s Onsite Waste Management Division, DEQ’s agent in the county.

Newport permitting contacts
DetailInformation
Community DevelopmentNewport City Hall, 169 SW Coast Highway, Newport, OR 97365; 541-574-0629
City Hall hoursMonday to Thursday, 8 a.m. to 6 p.m.; closed Fridays and holidays
Building Official office hours8 to 9 a.m., Monday to Thursday, or by appointment
Planner and code administratorMonday to Thursday, 8 a.m. to 5 p.m.
Inspection requests541-574-0628, or the QR code on the back of the permit
Online filingOregon ePermitting, also for right-of-way permits
Septic permitsLincoln County Onsite Waste Management, 210 SW 2nd Street; 541-265-4192

Permit types

Residential permits

Residential building, electrical, mechanical and plumbing permit applications (also published in Spanish) are on the City’s site and at the Community Development counter, along with a building permit fee calculation worksheet and the ICC building valuation table the City uses. According to the City’s FAQ, an owner can take out an electrical, plumbing or mechanical permit for work in their own home. ADUs pay system development charges at the small-home rate. Prescriptive rooftop solar is a $210 permit with plan review included, and a stand-alone residential fire sprinkler system costs $200 for up to 2,000 sq ft, $250 up to 3,600 sq ft, $325 up to 7,200 sq ft and $410 above that, plan review included.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial building, electrical, fire system and reroof permits have their own forms. Structural plan review is 65% of the permit fee and fire and life safety review 40% where required; electrical plan review is 30%, mechanical 40% and plumbing 25%. Commercial fire suppression plan review is $200 plus $50 for each floor above three levels, with the permit itself priced by valuation. A phased project pays a $350 minimum plus 10% of the total building permit fee, up to $1,500 a phase.

What comes before the building permit

Building in the Nye Beach Design Review Overlay uses the City’s overlay checklists for houses, multifamily, accessory and commercial buildings, and the City Center has its own form-based code and checklists. Geologic hazard areas need a geologic permit ($310), with a $5,000 peer review in active landslide areas; shoreland and estuarine work need a shoreland impact permit ($720) or an estuarine use permit ($825). A land use compatibility sign-off is $75. Work in the street is covered by a right-of-way permit, filed in ePermitting, or an encroachment permit, which goes through a land use application ($670) under sections 9.10 and 9.15 of the Municipal Code. FEMA’s October 18, 2019 maps are the ones in force for Newport, a participating NFIP community.

Newport permit costs and fees

Building fees are in the City’s Comprehensive Schedule of Fees and Charges, effective July 1, 2026 through June 30, 2027; the building valuation rows did not change from 2025-26. The schedule’s surcharge rule reads: “A 12% surcharge shall be imposed on all building, grading, electrical, plumbing, mechanical and manufactured dwelling permits (not to include plan review) the proceeds from which are to be remitted to the Oregon Building Codes Division.” The City’s FAQ adds that the permit fee and all other fees are due when the permit is issued.

Rather talk it over?

Call 1-855-478-4290 →
Newport building fees (fiscal year 2026-27)
ItemFee or rule
Valuation $1 to $2,000$75
$2,001 to $25,000$75 plus $10.25 per added $1,000 or fraction
$25,001 to $50,000$310.75 plus $7.75 per added $1,000
$50,001 to $100,000$504.50 plus $5.50 per added $1,000
Over $100,000$779.50 plus $4.25 per added $1,000
Plan review65% structural; 40% fire and life safety; $100 an hour for added review
New house plumbing$122.25 (1 bath), $214.50 (2 baths), $258 (3 baths); $63.75 per extra bath or kitchen
Electrical, new house up to 1,000 sq ft$175, service included
Electrical service, 200 amps or less$93.50
Electrical, mechanical, plumbing minimums$75 each
Demolition$140 residential or small commercial; $350 over 4,000 sq ft; not subject to the state surcharge
Re-inspection or special inspection$75 an hour; after hours $150 an hour, two-hour minimum
State surcharge12% of permit fees, not of plan review

Worked example. A house valued at $300,000: $779.50 plus 200 × $4.25 ($850) is a building permit fee of $1,629.50. Plan review at 65% adds $1,059.18, and the 12% state surcharge on the permit fee alone adds $195.54, for $2,884.22 before the electrical, plumbing and mechanical permits, the excise taxes and the SDCs.

New construction can also owe two excise taxes and the City’s SDCs. Newport’s affordable housing construction excise tax is 1% of the permit value for residential and for commercial and industrial work (Resolution 3787), and the Lincoln County School District tax is $1.70 per sq ft of new residential space from August 1, 2026. The SDC rate sheet effective July 1, 2026 charges single-family homes by floor area in three size bands; for a house of up to 1,700 sq ft the rates are $0.78 for water, $1.38 for wastewater, $1.05 for stormwater and $1.57 for transportation per sq ft, plus $0.66 for parks. For homes of 1,701 to 2,900 sq ft the water, wastewater, stormwater and transportation rates are $0.64, $1.10, $0.63 and $1.49, and above 2,900 sq ft $0.51, $0.92, $0.50 and $1.37. The listed rates include a 4.18% administrative fee and are adjusted every year by the construction cost index under Resolution 3786.

Trade permits and who may pull them

The City sells electrical, plumbing and mechanical permits itself, on its own forms or in ePermitting. Its FAQ says almost any electrical or plumbing work beyond basic maintenance, such as replacing a switch plate or clearing a drain, needs a permit, and a mechanical permit covers new heating, ventilation, air conditioning and kitchen hood equipment but not plumbing, sprinklers, gas lines, refrigeration or boilers. A residential swimming pool electrical permit, covering the panel, circuits and bonding, is $100.

Rather not deal with the building department?

Get a free quote →

Who may do the work

  • Contractors need an Oregon Construction Contractors Board license; electrical and plumbing work is done under state trade licenses
  • An owner may take out an electrical, plumbing or mechanical permit for work in their own home

Trade inspections

  • Building, mechanical, electrical and plumbing: Monday to Thursday
  • Class A electrical: Tuesdays and Wednesdays
  • Class A plumbing: by appointment only

How to apply for a Newport building permit

1. Check zoning and overlays

Ask the planner (Monday to Thursday, 8 a.m. to 5 p.m.) about Nye Beach design review, the City Center code, geologic hazards and shoreland rules.

2. Get land use approvals

Apply for any geologic, design review, shoreland or estuarine permit before the building permit.

3. Prepare the application

Use the residential or commercial building permit form and the fee calculation worksheet, or start the record in ePermitting.

4. Submit plans

Upload electronic plans in ePermitting or bring the application to City Hall from Monday to Thursday.

5. Answer corrections and pay

Correction notices come through ePermitting; permit fees, SDCs and excise taxes are due when the permit is issued.

6. Inspect and occupy

Call 541-574-0628 or scan the permit’s QR code for inspections; the certificate of occupancy is issued through ePermitting.

Review, corrections and what causes delay

Correction notices and approvals come back through ePermitting, and added review caused by changes, additions or revisions after submittal costs $100 an hour. Work in the Nye Beach overlay, the City Center or a geologic hazard area carries its own land use review, which comes before the building permit, and Class A electrical and plumbing inspections are only available on their set days or by appointment. A deferred submittal is reviewed at 65% of the fee for the deferred part, with a $100 minimum.

Inspections in Newport

Schedule inspections by calling 541-574-0628 or by scanning the QR code printed on the back of the permit. Building, mechanical, electrical and plumbing inspections inside the city run Monday to Thursday; Class A electrical inspections are on Tuesdays and Wednesdays, and Class A plumbing inspections are by appointment only.

Re-inspections, special inspections and inspections with no listed fee are $75 an hour, an extra inspection beyond those allowed is $75, and inspections outside business hours are $150 an hour with a two-hour minimum. The certificate of occupancy is issued through ePermitting at the end of the job.

Want this handled start to finish?

Get a free quote →

Newport permit search and official resources

Newport has its own building and land use records search, by street or address, for older building records and large-format plans; the City notes these copies are for information only and not the official record. Records from about March 2016 onward may instead be in Oregon ePermitting’s public search.

Inspections are where schedules slip.

Get a free quote →

Newport building permit FAQ

Does Newport issue electrical permits?

Yes. The City issues and inspects building, electrical, mechanical and plumbing permits inside Newport.

How much is a building permit in Newport?

$75 for work valued up to $2,000; a $300,000 house pays $1,629.50, plus $1,059.18 for plan review and $195.54 in state surcharge.

Is Newport City Hall open on Fridays?

No. City Hall is open Monday to Thursday, 8 a.m. to 6 p.m., and inspections also run Monday to Thursday.

How do I schedule an inspection in Newport?

Call 541-574-0628 or scan the QR code on the back of your permit.

What does it cost to demolish a house in Newport?

$140 for a residential or small commercial building under the 2026-27 schedule, or $350 for a commercial building over 4,000 sq ft; the City’s FAQ still lists older figures.

Where can I find old building plans for a Newport property?

Use the City’s building and land use records search by street or address; records from about March 2016 on may be in Oregon ePermitting instead.

Do I need a permit for a shed in Newport?

Not for a detached, one-story, nonhabitable shed of 200 sq ft or less and no more than 15 feet to the average roof height under the 2026 state code, though zoning and overlay rules still apply.

Do new homes in Newport pay excise taxes?

Yes: the City’s 1% affordable housing construction excise tax and the Lincoln County School District’s $1.70 per sq ft, plus SDCs.

Simplify Newport permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Newport sooner?

Let Alliance prepare, file, and track your Newport permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Newport permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.