The City of La Grande’s Building Division reviews plans, issues permits and inspects structural, electrical, plumbing, mechanical and manufactured home work in La Grande, and does the same for Union County and its other cities. Plans go in digitally wherever they can, licensed contractors can use Oregon ePermitting, and plan review, at 65% of the building permit fee, is due when you apply. Fees follow the 2017 Uniform Fee Methodology that the City and the County both adopted.
The division’s permit counter is on the first floor of City Hall, 1000 Adams Avenue (541-962-1360 or 541-963-1224; lgbuilding@cityoflagrande.org), and the inspection line is 541-962-1317. Joe Sloan is the Building Official (541-963-1225). The division page lists hours of Monday to Friday, 8 a.m. to 5 p.m.; the September 2025 submittal sheet lists City Hall as open Monday to Thursday, 8 a.m. to 5 p.m., and Friday until noon. La Grande, in Union County, had 12,985 residents in the Census estimate for 2025.
The same office covers unincorporated Union County and the cities of Cove, Elgin, Imbler, Island City, North Powder, Summerville and Union, but zoning approval comes from each place’s own planning office.
What requires a building permit in La Grande?
The division’s application forms show what it permits: buildings for homes and businesses, manufactured dwellings, demolition, electrical, plumbing and residential and commercial mechanical work, and commercial fire alarm and suppression systems. Its fee schedule also prices reroofs and fences “when a permit is required” on the valuation table, meaning projects outside the state exemptions.
Permit required
- New houses and additions, with the moisture content acknowledgment
- Remodels that change structure, and garages or shops over the exempt size
- Manufactured home placement, including any separate earthquake bracing system
- Decks more than 30 inches above grade
- Demolition of a house or commercial building
- Wiring, plumbing and heating or cooling work, each on its own permit
- Solar systems, on the prescriptive or valuation fee
No building permit (2026 ORSC)
- One-story nonhabitable detached buildings up to 200 sq ft and 15 feet high, or 400 sq ft on 2 acres or more
- Platforms, decks and porches no more than 30 inches above grade
- Wood, wire mesh and chain link fences up to 7 feet that are not pool barriers
- Reroofing adding 4 psf or less of dead load, except on townhouses
- Window and door replacements that change no structural member
What La Grande decides and what the state holds
The exemptions come from sections R105.2 and R101.2.2 of the 2026 Oregon Residential Specialty Code, mandatory since October 1, 2026; the division’s September 2025 submittal sheet still names the 2017 residential, plumbing and electrical codes. The state also lets an owner certify an agricultural building under ORS 455.315 to exempt it from the structural code, and the division posts the form for it. La Grande decides its fees jointly with Union County, its digital submittal rules, and, through its Land Development Code, zoning, setbacks and flood rules.
Short on time to read all of this?
Get a free quote →Oregon’s building code and its exemptions are the same in La Grande as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works
La Grande building department: who handles permitting
Permit technicians at the City Hall counter take applications and help with forms, plan review and issuance, and the division’s certified inspectors handle every trade. BCD’s directory lists La Grande as providing all building permits for itself, Union County and the county’s other cities. Zoning and planning for the city are a floor up at City Hall (541-962-1307), and Planning’s fees are separate from building fees.
| Detail | Information |
|---|---|
| Building Division | City Hall, first floor, 1000 Adams Avenue (PO Box 670), La Grande, OR 97850 |
| Phone and email | 541-962-1360 or 541-963-1224; lgbuilding@cityoflagrande.org; fax 541-663-8106 |
| Inspection scheduling | 541-962-1317, or Oregon ePermitting |
| Building Official | Joe Sloan, 541-963-1225 |
| Zoning and Planning | City Hall, second floor, 541-962-1307 |
| Hours | Division page: Monday to Friday, 8 a.m. to 5 p.m. (submittal sheet: Friday until noon) |
The submittal sheet prints the permitting number as 541-963-1360; the division’s web page gives 541-962-1360.
Permit types
Residential permits
A house application needs zoning approval from the planning office, the division’s set-back and flood information form, which the planning office fills in and returns, the additional energy measure form, the moisture content form and the plans. Filed electronically, one set is enough: an approved plot plan, foundation plan, floor joist plan for each level, roof plan with truss package or rafters, floor plans, elevations, a cross section with insulation R-values, beam and header calculations where dimensional lumber is not used, and a wall bracing schedule. A lot in a flood zone needs an elevation certificate from a licensed land surveyor. Owners building their own home file the 2022 property owner statement. The energy and moisture forms can be completed at the counter when you submit, but the energy form must be filled in correctly by then.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial applicants must state the project value, including all labor and materials but not land; houses are valued from the state’s mandated valuation table instead. The division posts a commercial plan submittal checklist and will not accept an incomplete submittal. Commercial plans carry the 65% building plan review, a 40% fire and life safety review when required and a 25% review for plumbing, electrical, energy, fire prevention or accessibility; commercial fire alarm and suppression systems are filed on their own form and priced on the building valuation table; deferred items cost 65% of the fee on their value, at least $250, and phased projects $150 a phase plus 10% of the total building permit fee, up to $1,500 a phase.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
The Planning Division suggests a pre-application meeting and can arrange a free preliminary review of a project by Planning, Building, Fire, Public Works and the local utilities. Check recorded easements and any homeowners’ association covenants with the Union County Clerk before designing. A house on a septic tank needs DEQ approval before the building permit, handled for Union County by Harney County’s onsite program, DEQ’s listed agent (541-573-2761); houses on city water and sewer do not. La Grande has one system development charge, for parks and recreation: $525 per new dwelling unit, collected before zoning approval and the building permit for any new home inside the city limits or the urban growth boundary. Section 7.1.004 of the Land Development Code caps it at half of the calculated cost per unit and never more than $1,000. Community Development Director Michael Boquist (541-962-1307) answers SDC and planning questions.
La Grande permit costs and fees
The City of La Grande/Union County 2017 Uniform Fee Methodology is the schedule both governments adopted under the state’s uniform fee rule. Plan review fees are paid when the application is submitted and permit fees when the permit is issued. The schedule’s surcharge sentence reads: “All building, plumbing, mechanical, electrical, and manufactured home permits are subject to the current State of Oregon surcharge, currently set at 12%.” Manufactured home installations also pay the state’s $30 administration fee.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee or rule |
|---|---|
| Valuation $1 to $500 | $50 |
| $501 to $2,000 | $50 plus $1.20 per added $100 or fraction |
| $2,001 to $25,000 | $68 plus $9 per added $1,000 |
| $25,001 to $50,000 | $275 plus $9 per added $1,000 |
| $50,001 to $100,000 | $500 plus $6 per added $1,000 |
| $100,001 to $1,000,000 | $800 plus $5 per added $1,000 |
| Over $1,000,000 | $5,300 plus $3 per added $1,000 |
| Building plan review | 65% of the building permit fee, due at submittal |
| New house plumbing | $174 one bath, $264 two, $354 three, $90 each added bath or kitchen |
| New house electrical | $145.75 up to 1,000 sq ft with service, plus $26.25 per added 500 sq ft |
| Manufactured dwelling | $450, including the first 30 feet of water, sewer and feeder |
| Demolition | $95 residential, $240 commercial |
| Re-inspection | $55 an hour, or $69 for electrical |
| Temporary certificate of occupancy | $100 for a house (up to 30 days); $300 commercial plus $30 a day past 30 |
Worked example. A garage or addition valued at $60,000 falls in the $50,001 to $100,000 band: $500 plus 10 × $6 ($60) is a $560 permit fee. Plan review at 65% is $364 and the 12% surcharge on the permit $67.20, for $991.20 before electrical or plumbing permits. The bands join cleanly, so the same arithmetic works anywhere on the table.
Smaller items: prescriptive solar costs $150 with one inspection but without plan review; residential mechanical permits start at $50, with a furnace at $20 and a heat pump at $54; plumbing permits start at $60. An earthquake-resistant bracing system added to a manufactured home after its original installation costs $85, and residential fire sprinkler systems run from $55 up to 2,000 sq ft to $160 above 7,200 sq ft. Refunds must be asked for in writing within 180 days of issue, are not given on permits under $70, and return at most 75% of the permit fee less a $50 processing fee.
Rather not deal with the building department?
Get a free quote →Trade permits and who may pull them
The division issues electrical, plumbing and mechanical permits itself, so a house project in La Grande deals with one office for every trade. The plumbing application states that plumbing permits are issued only to the person or contractor doing the work, and electrical permits cannot be transferred.
Who may pull permits
- Licensed contractors, who can also apply and book inspections in Oregon ePermitting
- Contractors working for pay need a Construction Contractors Board license
- Owners building their own home sign the property owner statement
- Plumbing: only the person or contractor doing the work
Trade permit rules
- Electrical permits are non-transferable and expire if work does not start within 180 days
- Plumbing and mechanical permits also lapse after 180 days without work
- Mechanical plan review, where needed, is 25% of the mechanical permit fee
- Electrical investigation and re-inspection fees are $69 an hour
How to apply for a La Grande building permit
Ask for a pre-application meeting and, where it helps, the free preliminary development review by the City’s departments and utilities.
Planning signs off and completes the set-back and flood information form; order an elevation certificate if the lot is in a flood zone.
Follow the residential or commercial checklist; files over 5 MB need other arrangements, and uploads are capped at 100 MB.
Building application, energy measure form, moisture form, and trade applications; owners add the property owner statement.
Bring the forms to the counter and send the plans through the division’s digital plan link, or, as a licensed contractor, apply in Oregon ePermitting; plan review is due at submittal.
Pay the permit fees and the 12% state surcharge at issuance.
Review, corrections and what causes delay
The division will not accept an incomplete submittal, so a missing zoning sign-off, flood form or energy form sends the application back before review begins. Plan revisions after approval are billed at $55 an hour, and approving an extra set of plans costs the same with a half-hour minimum. A permit extension must be asked for in writing, with a reason, before the permit expires; the first request costs $55.
Want this handled start to finish?
Get a free quote →Inspections in La Grande
Call the inspection line at 541-962-1317, or schedule in Oregon ePermitting, which also shows each permit’s inspection history. The same inspectors cover La Grande and the county’s other cities in every trade.
A re-inspection costs $55 an hour or part of an hour, $69 for electrical. Work started before a permit was issued carries an investigation fee at the same hourly rates. A temporary certificate of occupancy for a house costs $100 and lasts up to 30 days; a commercial one costs $300, plus $30 for each day beyond 30.
La Grande permit search and official resources
Licensed contractors can check the history and status of their permits in Oregon ePermitting. For other permit records, call the Building Division or email lgbuilding@cityoflagrande.org. The city’s flood map is old: FEMA’s status book still shows April 3, 1996 as La Grande’s current effective map date, under the communities taking part in the National Flood Insurance Program.
- La Grande Building Division
- Permit application forms
- Plan submittal checklists
- Residential plan submittal requirements (September 2025)
- Building Division fee schedule page
- City of La Grande/Union County 2017 Uniform Fee Methodology
- Digital plan review and ePermitting links
- Developing in La Grande: pre-application meetings
- BCD Local Building Department Directory
- 2026 Oregon Residential Specialty Code, chapter 1
- FEMA Community Status Book for Oregon
- Oregon ePermitting
- Oregon Construction Contractors Board
Inspections are where schedules slip.
Get a free quote →La Grande building permit FAQ
Who issues building permits in La Grande?
The City’s Building Division at City Hall, for every trade. The same office issues permits for the rest of Union County.
How much does a permit cost in La Grande?
A $60,000 project pays a $560 permit fee, $364 for plan review and $67.20 in state surcharge. The smallest jobs start at $50.
Do I have to submit plans digitally?
Yes, wherever plans can be submitted digitally. One electronic set is enough; files over 5 MB need other arrangements and uploads are limited to 100 MB.
How do I book an inspection?
Call 541-962-1317 or schedule in Oregon ePermitting.
Do I need DEQ approval?
Only for a house with a septic tank. Houses served by city water and sewer do not.
Is there a system development charge on a new house?
Yes, one: a parks and recreation SDC of $525 per new dwelling unit, paid before zoning approval and the building permit.
Do I need a permit for a shed?
Not for a one-story nonhabitable shed up to 200 sq ft and 15 feet high, or 400 sq ft on a parcel of 2 acres or more, but zoning setbacks still apply.
Can I get a refund if I cancel?
Ask in writing within 180 days of issue. Up to 75% of the permit fee comes back, less $50, and permits under $70 are not refunded.
Simplify La Grande permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in La Grande sooner?
Let Alliance prepare, file, and track your La Grande permits while your crew stays on the job.
More Oregon permitting guides
Union County
Read guide →Baker City
Read guide →Umatilla County
Read guide →Lake Oswego Building Permit Guide
Read guide →Lane County Building Permit Guide
Read guide →Lebanon Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about La Grande permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.