Wasco County, Oregon Building Permit Guide

To get a building permit in Wasco County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Wasco County Building Codes Services, on East 2nd Street in The Dalles, issues all building permits in the county, including The Dalles, Mosier, Dufur and Maupin; licensed contractors can apply through Oregon ePermitting.

Authority: Wasco County Building Codes ServicesCode: 2026 ORSC, 2025 OSSCPhone: 541-506-2650
Authority
Building Codes Services2705 East 2nd St., The Dalles
Hours
Mon–Thu, 7 a.m.–4 p.m.No Friday hours posted; closed for lunch
Plan sets
One, electronic preferredZoning sign-off on the plans
Fees
State permit fee table12% surcharge not included

Wasco County Building Codes Services issues all building permits in Wasco County, for the six cities as well as rural land, and inspects the work. Licensed contractors can file on Oregon ePermitting; others use the county’s forms. Zoning comes first, from the county Planning Division outside the cities, and the county charges the state’s permit fee table, so $150,000 of work carries a $1,605.23 permit fee before plan review and the 12 percent surcharge.

What requires a building permit in Wasco County?

Building Codes Services issues structural, mechanical, plumbing, electrical, renewable electrical energy, manufactured dwelling placement and RV or manufactured park development permits. Its structural application asks, among other things, whether an accessory structure will have a bathroom, whether a geotechnical report is required and whether the site is in a floodplain, which shows what the reviewers look at.

Permit required

  • New dwellings, additions, alterations and repairs beyond the state exemptions
  • Foundation-only permits, which have their own box on the structural application
  • Detached shops and garages over 200 sq ft (over 400 sq ft on 2 acres or more), or any taller than 15 ft
  • Residential fire sprinkler systems and commercial fire alarm or sprinkler systems
  • Solar photovoltaic systems, prescriptive or engineered
  • Manufactured dwelling placement and park development
  • Electrical, plumbing and mechanical work on their own applications

No permit under the state code

  • One-story, nonhabitable detached accessory buildings up to 200 sq ft and 15 ft (400 sq ft on a parcel of 2 acres or more)
  • Decks and porches with the walking surface 30 inches or less above grade
  • Nonhabitable membrane-covered frame structures up to 500 sq ft, one story and 3 ft or more from a lot line
  • Reroofing adding 4 psf or less of dead load, except townhouses, solar roof coverings and roofs that had to meet locally adopted wildfire standards
  • Siding not required to be fire rated; door and window swaps that change no structural member and need no fire rating
  • Fences of wood, wire mesh or chain link no taller than 7 ft, unless part of a pool barrier

Those are the 2026 Oregon Residential Specialty Code exemptions, mandatory from October 1, 2026. Qualifying farm buildings go on the county’s farm building exemption form instead of a structural permit. Exempt work can still need county or city zoning approval, and its wiring or plumbing still needs a trade permit.

What the county decides and what the state holds

The county runs its program under Ordinance 19-002 and its Building Codes Services and Electrical Program operating plans, which it posts with its contact details. The codes, and the fee table itself, are the state’s: the county charges the state permit fees adopted for Oregon jurisdictions. The county sets its own planning fees, its intake checklists and local design values, and it applies two sets of land use rules: the general land use and development ordinance, and a separate one for the Columbia River Gorge National Scenic Area.

Short on time to read all of this?

Get a free quote →

Wasco County building department: who handles permitting

The Building Codes Division’s directory lists Wasco County as the building department for every place in the county: Antelope, Dufur, Maupin, Mosier, Shaniko, The Dalles, the communities of Friend, Tygh Valley and Wamic, and the unincorporated county, each marked “all building permits.” The directory lists no separate city building department anywhere in the county.

Wasco County permit contacts
OfficeDetails
Building, electrical, plumbing and mechanical permitsWasco County Building Codes Services, 2705 East 2nd St., The Dalles, OR 97058; 541-506-2650; fax 541-506-2651; buildingcodes@wascocountyor.gov; Building Official Chad Lindley
Building counter hoursMonday to Thursday, 7 a.m. to 4 p.m., closed for lunch
Land use, unincorporated countyWasco County Planning Division, 2705 E. 2nd St., The Dalles; 541-506-2560; wcplanning@wascocountyor.gov; Monday to Thursday 10 a.m. to 4 p.m. (closed noon to 1), Fridays by appointment
Septic systemsNorth Central Public Health District, 419 7th St., Suite 100, The Dalles; 541-506-2603 for application help
Every city, one building department
CityBuilding permitsZoning
The DallesWasco County Building Codes ServicesCity of The Dalles
MosierWasco County Building Codes ServicesCity of Mosier
DufurWasco County Building Codes ServicesCity of Dufur
MaupinWasco County Building Codes ServicesCity of Maupin
AntelopeWasco County Building Codes ServicesCity of Antelope
ShanikoWasco County Building Codes ServicesCity of Shaniko
Unincorporated land, including Friend, Tygh Valley and WamicWasco County Building Codes ServicesWasco County Planning Division (National Scenic Area rules where they apply)

The structural application asks whether the property is inside city limits and has spaces for the zoning and sanitation sign-offs, so the right planning office has to approve the project before Building Codes Services takes it in.

Permit types and approvals before filing

Residential permits

The Residential Plan Submittal Intake Checklist (December 2025) starts with planning and zoning, water district, erosion control and DEQ, septic or sewer approvals, and requires the site plan, floor plans and elevations to be signed or stamped by the approving jurisdiction. One complete set of construction documents is enough, electronic preferred. The county’s General Building Requirements sheet (February 2026) gives the design values to draw to: 24-inch frost depth, severe weathering, seismic design category C, a 1,500 psf default soil bearing value, 99 mph wind, a 36 psf minimum prescriptive ground snow load (25 psf roof), engineering where the ground snow load exceeds 70 psf, and a three-story limit for houses. New houses record their additional energy measure on the county’s selection form.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial work uses the commercial plan review checklist and follows the 2025 Oregon Structural Specialty Code. The fee form adds a fire and life safety review at 40 percent of the permit fee, and the alternate materials form covers a request to use a material or method the code does not list. Phased projects pay at least $275 plus 10 percent of the building permit fee per phase, up to $1,500 a phase, and deferred submittals pay 65 percent of the fee on the deferred portion, with a $100 minimum.

What comes before the building permit

  • County land use: outside the cities, the Planning Division applies the land use and development ordinance, or the National Scenic Area ordinance inside the Columbia River Gorge National Scenic Area. On the 2026 fee schedule (June 16, 2026) a structural sign-off without a land use application is $386.75, a rural residential dwelling review $735.90, a guest house or ADU $546.10 and a new address $94.90.
  • Septic: North Central Public Health District runs the onsite program for DEQ. Since July 1, 2026 every septic application and permit goes through Oregon ePermitting; site evaluations, permits and authorization notices are applied for there, and an issued installation permit or authorization notice is valid for one year.
  • Wildfire rebuilding: the Planning Division offers help to owners redeveloping after a wildfire.

Building permit fees

The fee table printed on the structural application is headed “State Permit Fees Adopted for State of Oregon Jurisdictions.” Valuation is set from the ICC Building Valuation Data table current on April 1 each year, under OAR 918-050-0100.

Rather talk it over?

Call 1-855-478-4290 →
Wasco County structural permit fees (application updated May 26, 2026)
Total valuationFee
$1 to $2,000$87.26
$2,001 to $25,000$87.26 for the first $2,000, plus $17.64 per additional $1,000 or fraction
$25,001 to $50,000$492.98 for the first $25,000, plus $12.73 per additional $1,000 or fraction
$50,001 to $100,000$811.23 for the first $50,000, plus $8.82 per additional $1,000 or fraction
$100,001 to $500,000$1,252.23 for the first $100,000, plus $7.06 per additional $1,000 or fraction
$500,001 to $1,000,000$4,076.23 for the first $500,000, plus $5.99 per additional $1,000 or fraction
$1,000,001 and up$7,071.23 for the first $1,000,000, plus $5.99 per additional $1,000 or fraction
Plan review65% of the permit fee
Fire and life safety review40% of the permit fee
Seismic review1% of the permit fee
Residential fire sprinkler (includes plan review)$200 up to 2,000 sq ft; $250, $325 or $410 for larger areas
Prescriptive solar PV (includes plan review)$239.40
Re-inspection$104.74 each

State surcharge, in the county’s words: “The 12% surcharge is not included in any of the fees below.” The application then lists the surcharge, plan review, fire and life safety, construction excise tax, seismic review and a 3% technology fee as separate lines.

Worked example: $150,000 of work is in the $100,001 to $500,000 band: $1,252.23 plus 50 × $7.06 = $1,605.23. Add $192.63 surcharge, $1,043.40 plan review and $16.05 seismic review for $2,857.31, before the technology fee and any construction excise tax. Card payments are made through a link the county emails from the ePermitting payment portal or by phone; checks go to Wasco County, and the office does not take cash by mail.

Trade permits and who may pull them

The county keeps all the trades in one office: electrical, plumbing and mechanical permits are on its forms page, with a separate renewable electrical energy permit and prescriptive solar checklists for residential and commercial systems. Its electrical work runs under a posted Electrical Program Operating Plan. The Building Codes Services page links both the Construction Contractors Board search and the Building Codes Division license search so owners can check a contractor and a trade license before hiring.

Rather not deal with the Wasco County building department?

Get a free quote →
  • Paid work: the contractor needs a CCB license, and the structural application asks for the CCB number and any BCD license number.
  • Owner wiring: ORS 479.540 lets owners install electrical work without a license on residential or farm property belonging to them or an immediate family member, if it is not intended for sale, exchange, lease or rent; the permit and inspection still apply.
  • Owner plumbing: plumbing licensing does not cover work not done for hire (ORS 447.060), but the plumbing permit does.
  • Owner-builders: state law (ORS chapter 701) requires every applicant to sign a statement giving a license number or the basis for an exemption, and the county posts a Property Owner Statement form for owners.

How to apply

1. Confirm city or county

The structural application asks whether the site is inside city limits: city sites go to the city for zoning, county sites to the Planning Division.

2. Get land use and septic sign-offs

The planning office stamps the site plan, floor plans and elevations; NCPHD handles septic on ePermitting.

3. Prepare one plan set

Follow the intake checklist and the General Building Requirements design values.

4. File

Licensed contractors apply on ePermitting; others submit the county’s structural application and trade forms.

5. Pay

Use the emailed card link, call the office, or pay by check to Wasco County.

6. Build to the permit

Work must start within 180 days of issue and not stop for 180 days, or the permit expires.

Review, corrections and what causes delay

Plans without the approving jurisdiction’s stamp on the site plan, floor plans and elevations do not meet the intake checklist. Extra review caused by changes to approved plans is charged at $104.74 an hour, and the posted hours run Monday to Thursday only; the office is also closed on holidays such as Veterans Day, Wednesday, November 11, 2026.

Inspections

The county’s Structural Inspection Checklist (December 2025) sets the ground rules: the approved plans stay on site, the permit and address are posted, the inspector has safe access and OSHA-standard ladders, and the work is complete before the visit. At the footing and setback inspection the property corner pins must be exposed and string lines run on at least two sides. Underground or underfloor plumbing, mechanical and electrical work must be approved before the foundation is poured or the floor sheathed.

Inspections outside normal hours, when available, cost $104.74 an hour with a two-hour minimum, and renewing a temporary certificate of occupancy a second time or later is $100. Manufactured dwelling installations follow the county’s own inspection process sheet.

Code editions and flood maps

The state codes in force are the 2025 Oregon Structural Specialty Code and the 2026 Oregon Residential Specialty Code, whose chapters 2 to 44 can still be met under the 2023 edition until April 1, 2027; the county’s inspection checklist is written to the 2023 residential code. The 2026 electrical and plumbing codes apply from October 1, 2026. Wasco County, The Dalles, Mosier, Dufur and Maupin are enrolled in the National Flood Insurance Program; FEMA’s Community Status Book gives the Warm Springs Reservation of the Confederated Tribes its own entry and has none for Antelope or Shaniko.

Want this handled start to finish?

Get a free quote →

Oregon’s building code and its exemptions are the same in Wasco County as everywhere in the state, and an exemption from the building permit is not an exemption from zoning, land use or a trade permit. Site snow, wind and seismic values come from the state’s Oregon Design Criteria Hub. How Oregon’s statewide code works

Wasco County building permit FAQ

Does The Dalles issue its own building permits?

No. Wasco County Building Codes Services issues all building permits in The Dalles and the county’s other cities; the city handles its own zoning.

What does a building permit cost?

On the state fee table the county uses, $100,000 of work is $1,252.23 and $150,000 is $1,605.23, plus 65 percent plan review and the 12 percent surcharge.

Is the office open on Fridays?

The posted hours are Monday to Thursday only, 7 a.m. to 4 p.m., with the office closed for lunch.

How many sets of plans do I need?

One, preferably electronic, with the site plan, floor plans and elevations stamped by the planning office that approved the zoning.

Who issues septic permits?

North Central Public Health District, through Oregon ePermitting since July 1, 2026; call 541-506-2603 if you need a paper application.

What snow load do I design for?

Look the site up on the state’s Design Criteria Hub; the county’s minimum prescriptive ground snow load is 36 psf, and sites above 70 psf need an engineered design.

Does a shed need a permit?

Not a one-story, nonhabitable shed up to 200 sq ft and 15 ft high (400 sq ft on 2 acres or more), though zoning rules still apply.

Permit search and official resources

Building permit records for every city and the rural county are kept by Wasco County Building Codes Services, so one call to 541-506-2650 covers a records question anywhere in the county. Permits bought on Oregon ePermitting can also be looked up with that site’s Building search; the county also emails its card-payment links from that portal. Land use files are with the county Planning Division or the city that decided them.

Inspections are where schedules slip.

Get a free quote →

Simplify Wasco County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Oregon. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Wasco County sooner?

Let Alliance prepare, file, and track your Wasco County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Wasco County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.