Michigan Building Permit Guides

35 building permit guides for Michigan jurisdictions.

How building permits work in Michigan

Municipal GuideMichigan

Ann Arbor Building Permit Guide

Ann Arbor filings are online only, and in the city’s historic districts the design approval has to be in hand before the building permit can issue.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Canton Charter Township Building Permit Guide

Canton permits at city scale from a charter township office — and is explicit that it will not refund a permit you cancel because your homeowners’ association said no.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Clinton Charter Township Building Permit Guide

Michigan’s largest township permits like a city — and applies a sequencing rule on new homes that stops shed, deck, pool and fence permits before the deed catches up.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Dearborn Building Permit Guide

Dearborn requires a certificate of occupancy before a home changes hands, which puts the building department on the critical path of every residential closing in the city.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Dearborn Heights Building Permit Guide

Replacing a shared fence in Dearborn Heights needs your neighbour’s notarised consent — and city hall is closed on Fridays.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Detroit Building Permit Guide

Detroit enforces the state construction code through its own department, with a second, city-issued contractor licence that the state licence does not replace.

12 min readAugust 2026
Read Guide
Municipal GuideMichigan

Farmington Hills Building Permit Guide

Farmington Hills protects its tree canopy at a 6-inch threshold, requires homeowner affidavits to be notarised, and takes every permit application and inspection request online only.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Flint Building Permit Guide

A Flint postal address does not settle the question. The City of Flint and the Charter Township of Flint are separate authorities with separate departments, separate phone numbers and separate rules.

13 min readAugust 2026
Read Guide
County GuideMichigan

Genesee County Building Permit Guide

Genesee County has no county building department, and many towns leave trades to the State. Offices for Flint, Grand Blanc Township, Flint Township and Burton.

5 min readOctober 2026
Read Guide
Municipal GuideMichigan

Grand Rapids Building Permit Guide

Michigan’s second-largest city permits through a single Development Center, with a city contractor registration layered on the state licence and a soil erosion trigger that catches projects nowhere near the river.

13 min readAugust 2026
Read Guide
County GuideMichigan

Ingham County Building Permit Guide

Ingham County has no county building department. Offices for Lansing, East Lansing, Meridian and Delhi, the State-run areas, and county well and septic fees.

4 min readOctober 2026
Read Guide
Municipal GuideMichigan

Kalamazoo Building Permit Guide

In Kalamazoo a historic district decision is binding on the building official by ordinance — no permit may be issued and no work done contrary to it.

13 min readAugust 2026
Read Guide
County GuideMichigan

Kalamazoo County Building Permit Guide

Kalamazoo County has no county building department. Offices for Kalamazoo, Portage, Oshtemo and KABA, plus county septic and soil erosion permits.

5 min readOctober 2026
Read Guide
County GuideMichigan

Kent County Building Permit Guide

Kent County has no county building department. Building offices for Grand Rapids, Wyoming, Kentwood and Plainfield, plus county road, erosion and septic permits.

5 min readOctober 2026
Read Guide
Municipal GuideMichigan

Kentwood Building Permit Guide

Kentwood publishes its enforced codes part by part — and the table shows plainly that commercial and residential work in the same city sit on editions six years apart.

12 min readAugust 2026
Read Guide
Municipal GuideMichigan

Lansing Building Permit Guide

The state capital hosts the Bureau of Construction Codes, but permits inside the city are issued by Lansing’s own Building Safety Office — with its own submittal and refund rules.

12 min readAugust 2026
Read Guide
County GuideMichigan

Livingston County Building Permit Guide

The Livingston County Building Department permits most of the county. Fees, inspection cut-offs and the road, township, erosion and health permits that come first.

4 min readOctober 2026
Read Guide
Municipal GuideMichigan

Livonia Building Permit Guide

Livonia cancels a permit when no inspection has been requested or conducted for six months, and a cancelled permit cannot be refunded or reinstated.

13 min readAugust 2026
Read Guide
County GuideMichigan

Macomb County Building Permit Guide

Macomb County has no county building department. Offices and rules for Warren, Sterling Heights, Clinton and Macomb Townships, plus county road, erosion and septic permits.

5 min readOctober 2026
Read Guide
Municipal GuideMichigan

Macomb Township Building Permit Guide

Macomb Township requires a certificate of zoning compliance before any structure or premises is occupied, reoccupied, created, erected, changed or converted — six separate triggers, not one.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Novi Building Permit Guide

Novi asks for a wetland and woodland affidavit on any residential work — new homes, additions, decks, pools — not just on projects near visible water.

13 min readAugust 2026
Read Guide
County GuideMichigan

Oakland County Building Permit Guide

Oakland County has no county building department. Offices and inspection rules for Troy, Farmington Hills, Rochester Hills and Southfield, plus county permits.

4 min readOctober 2026
Read Guide
County GuideMichigan

Ottawa County Building Permit Guide

Ottawa County has no county building department. Offices for Georgetown, Holland Township, Allendale and the City of Holland, plus county erosion, septic and road permits.

5 min readOctober 2026
Read Guide
Municipal GuideMichigan

Rochester Hills Building Permit Guide

Rochester Hills books inspections exclusively online, through the same login used to apply for the permit — there is no phone route, and the wrong account cannot see the permit.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Royal Oak Building Permit Guide

Major work in Royal Oak needs a second permit from Engineering covering the public right of way — and the City of Royal Oak is not the same jurisdiction as Royal Oak Township.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Shelby Charter Township Building Permit Guide

Shelby will not schedule an inspection on gas work until its own gas pipe and meter sizing worksheet is completed and on file — and since September, permits run 180 days.

12 min readAugust 2026
Read Guide
Municipal GuideMichigan

Southfield Building Permit Guide

No site work happens in Southfield until four separate departments have given initial approval — and an incomplete submission to any one of them stops the whole review.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Sterling Heights Building Permit Guide

Sterling Heights will not review or process a permit until the non-refundable application fee is paid — and a homeowner who pulls a permit for a contractor takes on that contractor’s work.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Taylor Building Permit Guide

Taylor will not start a plan review without three paper sets, a digital copy on a flash drive and the fee — and says so with the words no exceptions.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Troy Building Permit Guide

Troy is paperless, closes its inspection window at two in the afternoon, and cancels inspections outright where the permit board has not been printed and posted.

13 min readAugust 2026
Read Guide
Municipal GuideMichigan

Warren Building Permit Guide

Warren, Michigan's third-largest city, publishes a long list of small jobs that need a permit - roofs, windows, doors, siding, decks, sheds and patios among them - and warns that work done without one can be fined up to $1,000.

13 min readAugust 2026
Read Guide
County GuideMichigan

Washtenaw County Building Permit Guide

Washtenaw County permits Dexter and six townships; Ann Arbor, Ypsilanti and the rest run their own. Unit list, appeals board, drain, soil erosion and Road Commission permits and fees.

4 min readOctober 2026
Read Guide
Municipal GuideMichigan

Waterford Charter Township Building Permit Guide

Waterford takes electrical, plumbing and mechanical permits and inspection requests online - but building permits themselves must be submitted in person or by mail, not by email and not online.

13 min readAugust 2026
Read Guide
County GuideMichigan

Wayne County Building Permit Guide

Wayne County has no county building department; every community runs its own. County road, drain and sewer permits, soil erosion, well and septic rules, and the Westland conflict.

4 min readOctober 2026
Read Guide
Municipal GuideMichigan

Westland Building Permit Guide

Westland runs a point-of-sale housing inspection: a certificate of approval is handed to the purchaser at transfer, or the buyer pays for a letter that allows the closing to happen.

13 min readAugust 2026
Read Guide

How building permits work in Michigan

These rules apply across Michigan. Each local guide above covers what is specific to that city, town, township or county: its building department and contacts, local rules, fees and inspections.

The state construction code and who enforces it

Michigan builds on a single statewide construction code adopted under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230) and administered by the Bureau of Construction Codes within the Department of Licensing and Regulatory Affairs (LARA). The code is made of International Code Council model codes and the National Electrical Code, with Michigan changes, adopted as separate parts: the plumbing (2021), mechanical (2021) and electrical (2023 NEC) parts took effect on 12 March 2024, the building and rehabilitation parts (2021) on 9 April 2025 and the commercial energy code on 22 April 2025. Houses and townhouses still follow the 2015 Michigan Residential Code, including its trade chapters, because the 2021 residential rules are on hold under a court order. The state code applies everywhere: cities, townships and counties cannot amend it. What differs locally is who enforces it, the fee schedule and the procedures. So the first question on any Michigan project is which authority enforces the code for the parcel, trade by trade.

The statewide layers that apply everywhere

Two Michigan features catch projects owners assume are simple. First, who enforces the code: a city, village or township may take on enforcement itself; where it does not, the county may do so if it runs a program; and otherwise the state Bureau of Construction Codes enforces. The answer can differ by trade — a unit may enforce building itself while the state handles electrical, mechanical and plumbing — and the bureau publishes a Statewide Jurisdiction List showing every unit. Only a few counties run a program at all. Second, licensing is mainly statewide: residential builders and maintenance and alteration contractors are licensed by the state, as are the plumbing, electrical and mechanical trades, and the permit application must carry the licence number and its expiry date. A city may run its own electrical licensing, and a local unit may ask plumbing and mechanical contractors to register their state licence for a small fee. Great Lakes and inland floodplain administration applies along the state’s shorelines and rivers, and snow loading is a live structural constraint.

⚠️ Confirm who enforces the code, then permit before you build. Building without a required permit exposes the job to stop-work orders, penalties, correction orders, delayed occupancy and problems at resale, refinancing or insurance. The safe first step is to confirm the authority having jurisdiction — municipality or third-party agency — and the code edition in force for the parcel.
🔍

Confirm the authority having jurisdiction first, then confirm the edition. Michigan enforces one statewide construction code, but enforcement may sit with the local unit, the county or the state, the code is adopted part by part, and houses still follow the 2015 residential code. Both questions have to be answered for the parcel and the filing date before the requirements are knowable.

Plans are reviewed by plan reviewers registered with the state, and an application must be granted or refused within 10 business days (15 for complex buildings) of a complete filing. Drawings must be sealed by a Michigan architect or engineer, except for detached one- and two-family houses of 3,500 square feet or less.

State contractor and trade licences

Michigan does license at state level, and the licence is the substantive credential rather than a registration. Residential builders and maintenance and alteration contractors are licensed under Article 24 of Public Act 299 of 1980, administered by the Bureau of Construction Codes, and the plumbing, electrical and mechanical trades are licensed by the state as well. A state licence is valid across the whole of Michigan, though a city may run its own electrical licensing and a local unit may ask contractors to register their state licence; what does not travel is the local permit, fee schedule and inspection route. Licensed residential work starts at jobs of $600 or more.

Trade permits are separate from the building permit; the code allows a permit for one system to be issued before the others are approved, so ask the enforcing agency how it sequences them. Each trade follows its own part of the state construction code, and is tied to a contractor holding the relevant state licence. Plumbing permits go only to a licensed plumbing contractor with a master plumber in charge, and gas piping falls under the mechanical code and needs a mechanical permit.

🛠️

Michigan licenses the trades at state level. Electrical, plumbing and mechanical contractors hold licences issued by the state, valid anywhere in Michigan, and residential builders and maintenance and alteration contractors are licensed the same way. What varies by parcel is not the licence but the permit, the fee and the inspection route. Performing residential work that requires a licence without holding one is a civil violation the county prosecutor or the Attorney General may act on.

  • Electrical work follows the electrical part of the state code and the referenced National Electrical Code, under a state-licensed electrical contractor.
  • Plumbing work follows the plumbing part of the state code, under a state-licensed plumbing contractor with a licensed master plumber in charge.
  • Mechanical work follows the mechanical and energy parts of the state code, under a state-licensed mechanical contractor.

How permit fees are structured

How Michigan permit fees are structured
Fee componentHow it works
Building permitBased on project valuation or square footage; set by the local unit, the county, or the state where it is the authority
Plan reviewA percentage of the permit fee or a flat charge; commercial work above defined thresholds needs a licensed plan reviewer
Trade permitsSeparate electrical, plumbing and mechanical fees under the local schedule
Zoning and useZoning, use-and-occupancy and, in some places, contractor-licence fees
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

Permit validity

📅

Approvals do not stay live indefinitely. A Michigan building permit lapses if work does not start within 180 days or stops for 180 days. On phased or financed work, keep the permit active with periodic progress inspections and confirm the expiry window before it passes.

Sources