In Marquette County one office covers the whole county: the Resource Management/Development Department’s Building Codes office at the County Courthouse, 234 W. Baraga Avenue, Marquette ((906) 225-8180), issues building and electrical permits in Marquette, Ishpeming, Negaunee and all 19 townships, with Paul Knox as Building Official and Codes Manager. Since March 9, 2026 the county no longer handles plumbing and mechanical permits; those come from the State of Michigan. Zoning stays with each city and township, and fees follow the county schedule effective January 1, 2026, starting with a $165 application fee.
What requires a building permit in Marquette County?
The county’s “What You Need Before You Build” page lists the work that needs a permit, and it reminds applicants in capitals that a building permit does not include plumbing, mechanical or electrical work, which need their own permits.
Permit required
- All new buildings, additions, alterations and remodeling
- New or replacement plumbing, mechanical or electrical systems
- Demolishing or removing a building
- Changing the use of a building, such as a house to an office or apartments
- Moving any building, including a mobile home
Soil erosion permit
- Earth changes within 500 feet of a lake or stream
- Earth changes of one acre or more anywhere
- Under 225 square feet near water: a signed exemption letter and $24 fee instead
Private subdivision covenants can limit a building’s size, placement or features, and the county notes that no government agency enforces them; the Register of Deeds can say whether a covenant applies. Airport zoning may also apply, depending on where the property is, and the county links a map showing where.
What the county decides and what the state holds
The state’s Statewide Jurisdiction List gives the county the building and electrical codes in every local unit and gives plumbing and mechanical to the state, matching the county’s own notice. The county sets its own fees and inspection rules and appoints a Building Code Board of Appeals for two-year terms. It does not zone: each city and township enforces its own zoning ordinance, and written zoning approval from that unit must come before a county building permit. Ewing and Turin townships are listed as requiring no zoning.
Marquette County building department: who handles permitting
The same county office serves the three cities and every township, so the address question here is about zoning, not about the building office. Plumbing and mechanical work goes to the state Bureau of Construction Codes: apply through the state’s online permit system and use the state’s main line, (517) 241-9313 (press 2), which the county page lists.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Resource Management/Development Department, Building Codes, Marquette County Courthouse, 234 W. Baraga Avenue, Marquette, MI 49855 |
| Phone / fax | (906) 225-8180 / (906) 225-8203 |
| Front office and inspections | (906) 225-8181; buildingcodes@mqtco.org |
| Hours | Monday to Friday, 8 a.m. to 5 p.m.; inspectors take calls 8 to 9 a.m. and 4 to 5 p.m. |
| Building Official / Codes Manager | Paul Knox |
| Covers | Building and electrical in all 22 local units; plumbing and mechanical are state permits |
| Community | Zoning contact |
|---|---|
| City of Marquette (pop. 21,944) | 906-225-8383 |
| City of Ishpeming (pop. 6,205) | 906-485-1091 ext. 206 |
| City of Negaunee (pop. 4,663) | 906-475-7700 ext. 12 |
| Marquette Township | 906-228-6220 |
| Chocolay Township | 906-249-1448 |
The county’s zoning administrators page lists the zoning contacts for the other townships.
Marquette County permit types
Applications can be emailed to buildingcodes@mqtco.org, brought to the courthouse or mailed. The residential packet (revised May 18, 2026) lists the items most often missed: the parcel number, signatures, the cost of construction, square footage, a site plan (a rough drawing is fine) and the plans and spec sheets.
Residential permits
- Plans: a plot plan with distances to lot lines and roads, a floor plan, a specification sheet, a footing and foundation plan and a cross-section; owners may draw these, though blueprints are preferred, and engineered truss drawings are required.
- Owners: the application has a box for an owner who will do the work personally in the single-family home the owner lives in or is about to occupy; a contractor certifies a residential builder license instead.
- Accessory buildings, decks, pole buildings and garages: spec sheets for each are on the forms page; detached buildings use their own square-foot rate.
- Manufactured and HUD homes: moving or setting a home needs a permit; HUD homes have a flat $205 fee.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects need a Plan Review Application with a $100 deposit and one electronic copy of stamped, signed plans (add a paper copy if you want a stamped set back). Plan review is charged at $0.00272 times the value up to $200,000 plus $0.00175 times the value above that, with a $100 minimum, and fire suppression reviews are priced by sprinkler head count.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: written approval from the city or township.
- Well and septic: Marquette County Health Department, Division of Environmental Health, 184 US 41 East, Negaunee (906-475-4195); public water and sewer approvals come from the local unit.
- Soil erosion: the county’s own soil erosion program in the same department. Its packet (revised February 13, 2026) defines an earth change broadly, from excavating and filling to stockpiling, clearing and stumping, and counts ditches and ravines that carry water as streams. Some work needs no permit but must still follow the rules: minor earth changes stabilized within 24 hours, normal road and driveway maintenance that does not widen or lengthen the road, plowing for crops, mining and logging. Those exemptions end when the work prepares a site for another use that needs a permit, mining and logging access roads and staging areas are not exempt, and digging topsoil, sand, gravel, peat, clay or marl does not count as exempt mining.
- Driveway: Marquette County Road Commission, (906) 486-4491, for work in the county road right-of-way.
- Wetlands: a state wetland permit where the site has wetlands; the county page still lists the former DEQ Marquette office, (906) 228-4853.
Marquette County permit costs and fees
Fees follow the county’s Building Permit Fee Schedule effective January 1, 2026 (revised January 16, 2026). Plan review fees and the first $100 of any application fee are non-refundable, and an administrative fee is added when work starts before a permit.
| Item | Fee |
|---|---|
| New one- and two-family homes, townhouses, additions | $165 application + $0.158 per sq ft for the first 1,000 sq ft + $0.078 per sq ft after, plus plan review of 20% of the calculated permit fee |
| Detached residential accessory buildings | $165 + $0.113 per sq ft for the first 400 sq ft + $0.086 per sq ft after, plus 20% plan review |
| HUD homes / demolition of a one- or two-family dwelling | $205 / $165 |
| Commercial structures | $165 + $0.012 per sq ft of floor area |
| Other work, $0 to $1,000 of cost | $165 |
| Other work, $10,001 to $100,000 | $271 + $2.49 per $1,000 over $10,000 |
| Other work, $100,001 to $500,000 | $496 + $1.99 per $1,000 over $100,000 |
| Single-family electrical, 100 amp / over 100 to 200 amp | $296 / $335 (application included) |
| Signs | $165 + $3.40 per $1,000 of cost |
| Fire suppression plan review | $114 for 1 to 100 heads, up to $296 for 401 to 500 heads, plus $0.173 per head over 500 |
| Building code variance request | $400 |
Rather talk it over?
Call 1-855-478-4290 →Square footage for houses counts basements, attached garages, porches and decks. For a 2,000-square-foot house, the square-foot charge is 1,000 × $0.158 plus 1,000 × $0.078, or $236, on top of the $165 application fee, with plan review added at 20% of the calculated permit fee. Work that needs sealed prints, and all alterations, are priced on the cost table instead, which already includes plan review and the application fee: a $50,000 remodel is $271 plus 40 × $2.49, or $370.60.
Trade permits and who may pull them
Electrical permits stay with the county. A single-family house pays one flat fee that includes the $165 application fee: $296 for a 100-amp service or $335 for over 100 up to 200 amps, while larger services and other buildings are itemized (services from $14, circuits $10 each, EV charging stations $5). The electrical form has a homeowner box as well as a contractor section with the state license number.
- Plumbing and mechanical: since March 9, 2026 these are State of Michigan permits, applied for in the state’s online system and inspected by state inspectors.
- Certificate of occupancy: before the county issues one on a job with plumbing or mechanical work, you must show the state permits with an approved final inspection, carrying the county permit number, state permit number, a matching address and description, and the status “inspections finaled”.
- Plan review without a building permit: electrical, plumbing, mechanical or commercial kitchen projects may still owe a county plan review fee set by the Building Official, with a $100 minimum.
Rather not deal with the Marquette County building department?
Get a free quote →How to apply for a Marquette County building permit
Ask the city or township zoning administrator for written approval; Ewing and Turin require none.
Environmental Health in Negaunee for wells and septic; the county soil erosion permit if you are within 500 feet of a lake or stream or disturbing an acre.
The application with parcel number, cost and square footage, a site plan, plans and spec sheets; commercial jobs add the plan review application and deposit.
Email the packet to buildingcodes@mqtco.org, or bring or mail it to 234 W. Baraga Avenue.
The fee is paid before the permit is issued; the county takes online payments.
File those permits with the state and keep the final approvals for the certificate of occupancy.
Review, corrections and what causes delay
The county says a complete application moves through much quicker, and names the gaps that slow it down: a missing parcel number, signature, cost or floor area, or plans left out of the package. A permit is not issued without the zoning, well and septic and soil erosion approvals. Office staff cannot answer technical questions, so plan to reach an inspector during the morning or late-afternoon call hours.
Inspections in Marquette County
Schedule county inspections with the front office at (906) 225-8181, in advance and with the permit number ready. Dates are given first call, first served; if you need a time window, call the inspector between 8 and 9 a.m. on the day.
- Footing and forms: after excavation and forms, with any reinforcing in place, before concrete; plumbing that the pour will hide needs inspecting too.
- Foundation: walls, tie-downs and damp-proofing in place, before backfill or framing.
- Framing and rough electrical: framing, fire-stopping, rough wiring and plumbing, roofing and flooring done, before insulation or wallboard.
- Final: when all work is complete and before anyone moves in.
The department can reject concealed work and make you remove insulation or wallboard so it can be inspected. Soil erosion permits are valid for two years, and earth work near water without one can bring a fine of up to $2,500; jobs moving more than 1,000 cubic yards may need a $1,000-per-acre performance bond.
Michigan building code in Marquette County
The county posts the code editions it enforces on a “Codes Currently Enforced” page. Building code appeals and variance requests ($400) go to the Building Code Board of Appeals, which meets on the second Thursday of each month at 4 p.m. in Room 41 of the Henry A. Skewis Annex, 234 W. Baraga Avenue, unless another place is posted. No Michigan county takes part in the National Flood Insurance Program itself; each city and township joins on its own.
Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Want this handled start to finish?
Get a free quote →Marquette County permit search and official resources
County building permits and inspection results can be looked up on BS&A Online by address, name, parcel number or permit number. For copies of files, use the county’s Freedom of Information Act request form; the FOIA Coordinator is the county’s Civil Counsel.
- Marquette County Building Codes
- What you need before you build
- Building codes permit fees
- Building permit fee schedule, effective January 1, 2026
- Building codes applications and forms
- Residential building permit packet
- Electrical permit application
- Soil erosion permit application and fees
- 225-square-foot soil erosion exemption letter
- Policies regarding inspections
- Township and city zoning administrators
- Building permit and inspection lookup
- Building Code Board of Appeals
- Marquette County FOIA
Inspections are where schedules slip.
Get a free quote →Marquette County building permit FAQs
Does the City of Marquette issue its own building permits?
No. The county Building Codes office issues building and electrical permits in the city and in every other unit; the city handles zoning.
Who issues plumbing and mechanical permits?
The State of Michigan, since March 9, 2026, when the county stopped administering them.
How much is a permit for a new house?
$165 plus $0.158 per square foot for the first 1,000 square feet and $0.078 after that, plus plan review at 20% of the calculated fee; a 2,000-square-foot house has $236 in square-foot charges.
Can I do the work on my own house?
The building application has an owner box for work you install yourself in the single-family home you live in or are about to occupy.
Can I apply by email?
Yes. The county accepts applications at buildingcodes@mqtco.org, in person or by mail.
Do I need a soil erosion permit for a lakefront project?
Yes, for earth changes within 500 feet of a lake or stream; a change under 225 square feet that will not send sediment into the water can use the $24 exemption letter instead.
How do I schedule an inspection?
Call (906) 225-8181 with your permit number; for a time window, call the inspector between 8 and 9 a.m. on the inspection day.
Simplify Marquette County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Marquette County sooner?
Let Alliance prepare, file, and track your Marquette County permits while your crew stays on the job.
More Michigan permitting guides
Dickinson County
Read guide →Delta County
Read guide →Menominee County
Read guide →Mason County Building Permit Guide
Read guide →Mecosta County Building Permit Guide
Read guide →Melvindale Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Marquette County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.