To get a building permit in Walker, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Walker’s Community Development Department at City Hall, 4243 Remembrance Road NW, issues building, electrical, mechanical and plumbing permits for the whole city, through BS&A Online or on paper.

Authority: Walker Community DevelopmentFees: Resolution 24-731Phone: 616-791-6858
Authority
City of WalkerAll four trades, per the state list
House fee
$60 + $10 / $5 per $1,000Plus 15% plan review on new homes
Filing
BS&A OnlineOr email, mail, in person
Hours
Mon–Thu 7:30–5Fri 7:30–11:30

In the City of Walker, building, electrical, mechanical and plumbing permits all come from the Community Development Department at City Hall, 4243 Remembrance Road NW (616-791-6858, cdd@walker.city). Apply through BS&A Online or send the city’s paper form by email, mail or in person. Under Resolution 24-731, adopted September 23, 2024, a house permit starts at $60 for the first $1,000 of project value, and new single-family homes add a plan review fee of 15% of the building permit fee.

What requires a building permit in Walker?

Walker publishes its permit rules as a set of project guides rather than a single list. Read together with the building application, they show which jobs the department expects to see and what each one needs.

Building permit

  • New homes, two-family homes and multi-family buildings
  • Additions, remodels, basement finishes and new egress windows
  • Accessory buildings over 200 square feet, including pole barns and garages
  • Decks, swimming pools or spas holding more than 24 inches of water
  • Mobile home set-ups, building relocations, demolitions, wireless facilities and alternative energy
  • Every non-residential new building, addition or alteration

Separate permits

  • Electrical, mechanical and plumbing work, each on its own application
  • Zoning permits for uses such as mobile food vending, backyard chickens, roadside stands, outdoor sales and events
  • Sign permits, which also carry a $50 zoning inspection fee
  • Soil erosion and stormwater permits from the Engineering Department
  • Right-of-way permits for driveways, sidewalks and utility cuts

Accessory structures of 200 square feet or less do not need a building permit under the accessory guide, but they still must meet the zoning size and setback limits. Walker caps the first detached accessory building on a permanent foundation at 900 square feet or 5% of the lot (whichever is less) on lots under half an acre, 1,200 square feet on lots of 0.5 to 1.5 acres, 1,500 square feet up to 3 acres and 2,400 square feet above that.

What Walker decides and what the state holds

The construction code is the state’s, and the city cannot change it. Walker chose to enforce all four parts itself: the state’s Statewide Jurisdiction List shows the city as the enforcing agency for building, electrical, mechanical and plumbing work. The city sets its own fees by resolution, writes its zoning ordinance, runs its own soil erosion and stormwater programs under city ordinances, and licenses right-of-way contractors.

Walker building department: who handles permitting

The Community Development Department handles plan review, permits, inspections and certificates of occupancy, along with zoning and planning. Its staff directory lists Chuck Dyk as Building Official. The Building page’s own summary says the city contracts building inspections, trade inspections and plan reviews with Professional Code Inspections (PCI); the city still takes the applications, fees and scheduling requests.

Short on time to read all of this?

Get a free quote →
Walker permit contacts
DetailInformation
OfficeCommunity Development Department, City Hall, 4243 Remembrance Road NW, Walker, MI 49534
Phone / email616-791-6858; cdd@walker.city
HoursMonday to Thursday 7:30 a.m. to 5 p.m.; Friday 7:30 to 11:30 a.m.
Building OfficialChuck Dyk
PortalBS&A Online (applications, payments, inspection requests)
Soil erosion and stormwaterWalker Engineering Department, 616-791-6327
Right-of-wayWalker Department of Public Works, 616-791-6854

A Walker mailing address does not always mean a Walker parcel; the city’s forms themselves carry a Grand Rapids postal address. Check the property in the city’s zoning map or with the department before you file.

Walker permit types

Each permit has its own form: building, electrical, mechanical, plumbing, zoning and sign. The building application asks for the owner, the contractor’s builder license number and expiry date, federal employer and workers’ compensation details, the subcontractors, the building dimensions, flood and wetland questions, and the project value including labor but excluding the lot.

Residential permits

  • New homes and additions: digital plans with all floors labeled, a footing and foundation plan (footings at least 42 inches deep), smoke and carbon monoxide alarm locations, a survey and grading plan, truss drawings and an energy compliance form or REScheck report.
  • Remodels and basement finishes: plans and a site plan; egress windows also need safety glazing locations and a wall section showing bracing and sheathing.
  • Accessory buildings: building and site plans, truss drawings over 200 square feet, and a post-frame or foundation data sheet.
  • Decks: a plan with size and materials and a site plan; guards of at least 36 inches are required where the deck is more than 30 inches above grade.
  • Pools and spas: a barrier and inspection agreement signed by the contractor and owner, an electrical permit for in-ground and permanently placed pools and a mechanical permit for heaters.

Commercial permits

Non-residential work starts with any conditions set by the Planning Commission. Submit one full-size paper set and one electronic set of signed and sealed construction documents, plus energy code documentation from the design professional. Grand Rapids Utility Engineering also needs a sealed set for new buildings, additions, remodels, build-outs, fire suppression and site irrigation, because water and sewer come from Grand Rapids.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning review: the zoning administrator checks setbacks and may ask for a survey; a $50 zoning permit fee is added to the building permit where it applies.
  • Planning Commission and ZBA: site plans, special land uses and rezonings go to the Planning Commission (first and third Wednesdays, 6:30 p.m.); variances go to the Zoning Board of Appeals (second and fourth Wednesdays, 6:30 p.m.).
  • Soil erosion: a city permit under Ordinance No. 34 for earth changes of one acre or more or within 500 feet of a river, lake or stream; sites of five acres or more also file a Notice of Coverage with EGLE.
  • Stormwater: a city permit for any project that adds impervious surface, built to Chapter 67 and the city’s design standards.
  • Right-of-way: Walker DPW for city streets, the Kent County Road Commission for county roads and MDOT for state highways.
  • Well, septic and utilities: a Kent County Health Department environmental review for wells or septic; a Walker water and sewer affidavit from the Treasurer and Grand Rapids connection and frontage fees for public utilities.

Walker permit costs and fees

All Community Development fees come from Resolution 24-731, adopted by the City Commission on September 23, 2024 under Chapter 94, Article 18 of the city code; it repealed Resolution 21-610. The fee is based on project value including materials and labor, it is collected when the permit is approved, and no permit is issued until it is paid.

Walker building and zoning fees (Resolution 24-731)
ItemFee
One- and two-family building permit$60 for the first $1,000 of value; $10 per added $1,000 up to $10,000; $5 per added $1,000 above $10,000
Commercial, multi-family and industrial building permit$60 for the first $1,000; $10 per added $1,000 up to $10,000; $6 per added $1,000 above $10,000
Inspections includedUp to 5 under $500,000; up to 8 from $500,000 to $1,000,000; set by the Building Official above that
Plan review15% of the building fee for new single-family homes, condominiums and duplexes; 25% for multi-family and non-residential
Additional inspection / reinstate expired permit$50 each / $75
Mobile home set-up / demolition (per building)$150 / $150
Construction Board of Appeals$250
Zoning permit / zoning inspection$50 / $50
Zoning Board of Appeals$400 plus $500 escrow
Site plan review / special land use$1,000 each
Stormwater permit (Engineering)$400 for 3 acres or less, up to $1,000 for 10 acres or more; $30 recording; $5,000 escrow returned after as-built approval

Rather talk it over?

Call 1-855-478-4290 →

Worked example from the residential scale: a $250,000 house costs $60 for the first $1,000, plus $90 for the next $9,000, plus $1,200 for the remaining $240,000 at $5 per $1,000, or $1,350. Plan review adds 15% ($202.50), so the building permit totals $1,552.50 before the zoning fee and the separate trade permits. Trade permits each start with a $50 application fee (marked non-refundable on the electrical and plumbing scales) and $50 per inspection, and the Planning Director may raise or lower planning fees and escrows to fit the project.

Trade permits and who may pull them

Walker issues its own electrical, mechanical and plumbing permits and inspects the work. Each trade form asks for the state contractor license and the master license where one applies, and each carries the homeowner affidavit wording below.

  • Electrical: service, rough-in and final inspections are $50 each; services up to 200 amps add $15, a vehicle charging station $20 and a solar system up to 10 kW $40 plus $4 per added kilowatt. Non-residential and multi-family work and single-family homes over 3,500 square feet add a 15% plan review fee, as they do on the plumbing scale.
  • Mechanical: a replacement furnace is $30, a new residential heating system with piping and ductwork $50, a residential air conditioner $30 and each gas outlet $7.
  • Plumbing: fixtures are $7 each, a water heater $10 and a storm sewer connection with one inspection $65.
  • Homeowners: a homeowner may sign the affidavit on the building form for work done personally in the single-family home they live in or are about to occupy; the electrical form uses the same test for the owner’s own house.

Contractors working in the street need more than a state license: Walker requires right-of-way contractors to be registered, licensed and bonded with the city, with a performance bond and a certificate of insurance naming the city.

Rather not deal with the building department?

Get a free quote →

How to apply for a Walker building permit

1. Check zoning and the parcel

Confirm the address is in Walker, check setbacks and size limits, and ask whether a survey is needed.

2. Line up site permits

Get Engineering’s word on soil erosion and stormwater, a right-of-way permit for any driveway or curb work, and a health department review for a well or septic system.

3. Pick the right guide

Use the new home, remodel, accessory, deck, pool or non-residential guide to build the document list.

4. Apply online or on paper

In BS&A Online choose the property, the permit type and work description, estimate the fees and attach plans; or email the PDF form and plans to cdd@walker.city.

5. File the trade permits

Electrical, mechanical and plumbing contractors each file their own applications.

6. Pay and post the permit

Pay the invoice in BS&A or at City Hall once the permit is approved.

Review, corrections and what causes delay

A house package without the truss drawings, energy form or scaled site plan that the guides call for is incomplete, and a project inside the 100-year floodplain, a regulated wetland or the 500-foot soil erosion zone needs those answers settled first. Commercial projects wait for Planning Commission conditions and the Grand Rapids utility review. A permit lapses if work does not start within 180 days or stops for 180 days, closed permits are not refunded, and reopening one costs $75.

Inspections and certificates in Walker

Request inspections through BS&A Online (enter the permit number, pick the inspection type and a day on the calendar) or by email or phone to Community Development, with 48 hours’ notice. A typical new house is inspected at:

  • Foundation: before backfill, once drain tile, stone and damp-proofing are in.
  • Rough-in and exterior envelope: after the electrical, mechanical and plumbing rough inspections pass, with floor and roof truss data on site.
  • Final: when work is complete and the trade finals are approved.

Decks get a footing inspection after the holes are dug and before concrete is poured, and a final once grading is done; non-residential footings need a third-party inspection with an engineer’s report emailed to the department. A certificate of occupancy follows the finals and any open zoning items, and a pool may not be used until its certificate is issued.

Michigan building code in Walker

Walker enforces the state code itself for all four trades and adds its own fees and local ordinances. FEMA’s Community Status Book lists the City of Walker (community 260110A) as a participating National Flood Insurance Program community with flood maps effective February 23, 2023, and the building application asks whether any part of the project lies in the 100-year floodplain.

Want this handled start to finish?

Get a free quote →

Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules

Walker permit search and official resources

Permit records, invoices and inspection results can be searched in BS&A Online by name, address, parcel, permit or invoice number. For copies of plans or files, send the city’s FOIA request form to the City Clerk by email, by fax to 616-791-6881 or by mail to City Hall; the city says it responds within five business days and charges for search time and copies.

Inspections are where schedules slip.

Get a free quote →

Walker building permit FAQs

How much is a building permit for a new house in Walker?

$60 for the first $1,000 of value, $10 per $1,000 up to $10,000 and $5 per $1,000 above that, plus 15% plan review; a $250,000 house comes to $1,552.50.

Do I need a permit for a shed in Walker?

Accessory structures over 200 square feet need a building permit; smaller ones do not, but they must still meet zoning size and setback limits.

Does a pool need a permit?

Yes, any pool that holds more than 24 inches of water, plus an electrical permit for in-ground or permanent pools and a mechanical permit for a heater.

Can I pull my own permit as a homeowner?

Yes, for work you do yourself in the single-family home you live in or are about to occupy; you sign the homeowner affidavit on the form.

How much notice does an inspection need?

48 hours. Book it in BS&A Online or contact Community Development at 616-791-6858 or cdd@walker.city.

Who issues soil erosion permits in Walker?

The city’s Engineering Department, for earth changes of one acre or more or within 500 feet of a lake, river or stream.

Where do water and sewer connections come from?

You need a Walker water and sewer affidavit from the Treasurer, and connection and frontage fees are paid to the City of Grand Rapids water department.

Simplify Walker permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Walker sooner?

Let Alliance prepare, file, and track your Walker permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Walker permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.