In the City of Wyoming, the Building Inspections department of Community and Economic Development issues building, electrical, mechanical and plumbing permits from City Hall, 1155 28th Street SW (616-530-7285, Monday to Thursday 7 a.m. to 5 p.m.). Most residential permits take one to two weeks, while anything other than a single-family house needs site plan approval from the Planning Department first. The residential building form prices permits at $60 for the first $1,000 of value plus $7 for each additional $1,000.
What requires a building permit in Wyoming?
Wyoming’s permit page says city ordinances require a permit before construction, alteration and equipment installation work starts, and that whoever actually does the work, owner or contractor, must get it and post it on site. The city’s own examples show where each form applies.
Building permit
- New homes, additions and remodeling
- Decks, hot tubs and swimming pools (pools have their own application)
- Garages and other accessory buildings
- Commercial new buildings, renovations, tenant spaces, apartments and condominiums
Trade and other permits
- Electrical: new installations, service upgrades, added circuits, equipment wiring
- Mechanical: furnaces, central air, fire sprinklers, mechanical exhaust
- Plumbing: drains, vents, water supply pipes, water heaters
- Permanent and temporary signs, tents over 400 square feet (for up to 180 days) and backyard chickens
Two city documents treat fences differently. The fence handout says no permit is required as long as the fence follows the code: up to 6 feet in the rear yard behind the front face of the house, up to 3 feet in the front yard and 1 foot back from the sidewalk, finished side facing out, and any replacement of more than half the fence must meet the current rules. Section 90-312 of the zoning code, quoted on the permit page, says the erection or alteration of any fence is approved by the building inspector, so call before you build.
The accessory structure handout requires a building permit for any accessory building over 200 square feet. A lot may have two accessory buildings, and an attached garage counts as one. The largest single building is 768 square feet on lots up to half an acre, 900 up to an acre, 1,200 up to two acres and 1,600 above that, with total accessory area of 1,000, 1,200 and 1,600 square feet and 200 more per acre on lots over two acres. Height is 14 feet at the roof midline, or 17 feet for buildings of 1,200 square feet or more, and detached buildings sit at least 10 feet from the house. Rental homes must be registered and certified, and short-term rentals of 27 days or less register for free.
Short on time to read all of this?
Get a free quote →What Wyoming decides and what the state holds
The state writes the construction code and the city cannot amend it. Under the state’s Statewide Jurisdiction List, Wyoming enforces all four parts itself, so building, electrical, mechanical and plumbing permits and inspections are city services. The city sets its fees, its zoning code and Form Based Code, its rental inspection program and its contractor registration; soil erosion permits come from the Kent County Road Commission.
Wyoming building department: who handles permitting
Building Inspections reviews plans, issues permits and inspects work by licensed contractors and homeowners, and it also enforces the property maintenance code, the rental program, signs and the zoning code. The Planning Department runs site plan review for every development except single-family housing.
| Detail | Information |
|---|---|
| Office | Building Inspections, City Hall east wing (enter by the south lobby doors), 1155 28th Street SW, Wyoming, MI 49509 |
| Phone / email | 616-530-7285; bldg_info@wyomingmi.gov |
| Hours | Monday to Thursday, 7 a.m. to 5 p.m.; closed Friday to Sunday |
| Portal | BS&A Online (trade permits, payments, permit lookup) |
| Planning | Planning Department, same address, 616-530-7285 |
| Right-of-way | Public Works Engineering, 2660 Burlingame Ave SW, 616-530-7254 |
Wyoming permit types
Wyoming has separate forms for residential building, commercial building, pools, electrical, mechanical, plumbing, signs, temporary signs and tents. Contractors must register their state license with Building Inspections before they can apply, either in BS&A or with the paper registration form; homeowners do not register, and contractors may not apply as homeowners.
Residential permits
- Documents: one set of detailed, dimensioned construction plans and one site plan showing lot lines and existing and proposed buildings, plus a foundation drawing and HVAC and energy documents where they apply.
- New homes and additions: page two of the form asks for setbacks, floor areas, bedrooms, baths, fireplaces, basement finish and total lot coverage.
- Garages and sheds: the same form, with size and whether the building is attached or detached.
- Garage and shed foundations: up to 600 square feet, a monolithic slab with 12-inch by 12-inch perimeter footings and a 4-inch slab; 601 square feet and up, a full frost-protected foundation with 42-inch footings.
- Pools: a separate pool application with size, depth and capacity. The whole pool area needs a fence at least 4 feet high with a self-closing, self-latching gate, unless an above-ground pool has sides at least 48 inches high, an approved wall barrier and a removable ladder. Most pools also need an electrical permit pulled by a licensed electrical contractor or the owner-occupant.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
The commercial form is filed electronically through the Planning, Zoning and Engineering application in BS&A Online, with a full description of the work, site plan approval and construction drawings (electronic preferred). It asks for the use group, construction type, occupant load and whether fire suppression or alarm systems are included, and special inspections may be required for review. Plan review is charged at 25% of the building fee, and the form says no permit fees are refunded.
Permanent signs, mostly in commercial and industrial districts, follow Article 7 of the zoning code; signs on Division Avenue, Burton Street, or 28th Street between Clyde Park Avenue and Burlingame Avenue follow Division 10 of the Form Based Code instead. A chicken permit costs nothing and allows up to four chickens, with no roosters and no free-ranging.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Pre-application meeting and site plan: required for developments; the Planning Commission meets on the third Tuesday at 7 p.m., and plans are due at least 30 days ahead (the city’s table sets December 17, 2026 as the deadline for the January 19, 2027 meeting). Staff review can take up to three weeks.
- Variances: the Zoning Board of Appeals meets on the first and third Mondays at 1:30 p.m. at City Hall.
- Soil erosion: the Kent County Road Commission is the enforcing agency for Wyoming; its permit covers activity within 500 feet of a lake or stream (1900 4 Mile Road NW, Walker, 616-242-6920).
- Right-of-way: sidewalks, drive approaches, curb and gutter and water and sewer lines in a city street need an Engineering permit; dumpsters and oversized loads go through the Traffic Department (616-530-7263).
Wyoming permit costs and fees
Wyoming prints its permit fees on each application form rather than in a separate published schedule, and the forms do not cite the resolution that set them. Fees are invoiced after approval and must be paid before the permit issues, in person, by phone through the Treasurer (616-530-7278, with a 3% card fee), at the drop box or drive-up window, or by mail.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Residential building permit | $60 for the first $1,000 of value (non-refundable base fee) plus $7 for each additional $1,000 |
| Commercial plan review | 25% of the building permit fee |
| Electrical, mechanical or plumbing application | $50 each, non-refundable, includes one inspection |
| Each additional trade inspection | $40 |
| Trade work started without a permit | $80 administrative fee |
| New single-family home, electrical | $200, includes three inspections |
| Residential heating system / air conditioner | $50 / $30 (replacement furnace or air conditioner $20) |
| Plumbing fixtures / water or sewer service | $5 each / $60 |
| Contractor registration | Building $0; plumbing and mechanical $15; electrical, fire alarm and sign specialty $60 |
Worked example from the residential form, which itself shows a $2,000 job at $67: a house valued at $250,000 costs $60 for the first $1,000 plus 249 × $7, or $1,743, for a building permit of $1,803. Electrical, mechanical and plumbing permits are added on top. The form also says permits are not refunded and that any deposit is forfeited if the permit runs past a year or the inspections exceed the number the code allows.
Trade permits and who may pull them
Only two kinds of applicant may take out an electrical, mechanical or plumbing permit in Wyoming: a contractor licensed by the state for that type of work, or the owner who lives in the dwelling. Each trade form carries a homeowner affidavit for work done personally in the owner’s own house, and subcontractors must have their permits before they start.
- Online: electrical, mechanical and plumbing permits can be filed in BS&A Online at any hour. Homeowners use the homeowner application without an account; contractors log in to a registered account.
- Electrical: a service up to 200 amps is $17, solar starts at $40 for the first 10 kW plus $4 per added kilowatt, a vehicle charger is $20 and a pool or hot tub $60 with two inspections.
- Mechanical: covers furnaces, air conditioning, fire sprinklers and exhaust systems; gas piping and duct work on commercial and residential jobs are priced from the bid amount, starting at $30 under $3,000.
- Plumbing: the form asks for the master plumber license; medical gas work requires a license and is priced per outlet.
Rather not deal with the building department?
Get a free quote →How to apply for a Wyoming building permit
Confirm setbacks, fence and accessory rules; for anything but a single-family house, book the required pre-application meeting and get site plan approval.
Send the registration form, fee and a copy of the state license to Building Inspections.
A site plan and construction drawings are required with every complete building application.
Commercial jobs go through BS&A; house permits go by mail, in person in the east wing or through the drop box, and trade permits can be filed online.
Pay once the application is approved; the permit is then emailed to you.
Both must be posted on the site, building or unit before inspections.
Review, corrections and what causes delay
The city’s page is not consistent about online building permits: one passage says building permits can be filed in BS&A at any hour, while the application list says detailed-plan permits such as building permits cannot be filed online yet. Call 616-530-7285 before relying on the portal for a house. Most residential permits take one to two weeks; large and commercial projects take longer and wait on site plan approval. The residential form says a permit expires one year after it is issued.
Inspections and certificates in Wyoming
Call Building Inspections at 616-530-7285 for every inspection, with at least 24 hours’ notice; the permit holder is responsible for scheduling, and the city inspects within a reasonable time after the request. For a house the residential form lists three calls:
- Foundation: when the wall is in and tarred but not backfilled, with footing drains done where required.
- Rough-in: before drywall or insulation.
- Final: when the work is complete and before occupancy.
A certificate of occupancy is required before any use or operation of the building. Trade inspections beyond the one included with each electrical, mechanical or plumbing permit are $40 each, and the forms say concealed work must be inspected before it is covered.
Michigan building code in Wyoming
Wyoming enforces the state code for all four trades and adds its own zoning code, Form Based Code and property maintenance rules. FEMA’s Community Status Book lists the City of Wyoming (community 260111A) as a participating National Flood Insurance Program community, with flood maps effective February 23, 2023.
Want this handled start to finish?
Get a free quote →Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Wyoming permit search and official resources
Existing permits, enforcement cases and rental certificates can be checked in BS&A Online by entering the address and opening the building department tab. For copies of plans or other records, file a Freedom of Information Act request with the City Clerk, the city’s FOIA coordinator, in person or by mail at 1155 28th Street SW, by email or by fax to 616-530-7200.
- Wyoming Building Inspections page
- BS&A Online, City of Wyoming
- Residential building permit application
- Commercial building permit application
- Electrical permit application
- Mechanical permit application
- Plumbing permit application
- Contractor registration form
- Planning and zoning, site plan schedule
- Public Works right-of-way permits
- Freedom of Information Act requests
- Kent County Road Commission permits and soil erosion
- Michigan Statewide Jurisdiction List
Inspections are where schedules slip.
Get a free quote →Wyoming building permit FAQs
How much is a building permit in Wyoming?
The residential form charges $60 for the first $1,000 of value and $7 for each further $1,000, so a $250,000 house is $1,803 before trade permits.
How long does a residential permit take?
Most residential permits are ready in one to two weeks; commercial and large projects take longer.
Can a homeowner pull a permit in Wyoming?
Yes, if you own and live in the dwelling and do the work yourself; homeowners do not need to register, but contractors may not apply as homeowners.
Do I need a permit for a fence?
The city’s fence handout says no permit is needed if the fence follows the code (6 feet in the rear yard, 3 feet in the front yard), but the zoning code says the building inspector approves fences, so check first.
How big can a garage or shed be?
It depends on lot size: one building up to 768 square feet on lots of half an acre or less, rising to 1,600 square feet on lots over two acres; anything over 200 square feet needs a building permit.
Who issues soil erosion permits in Wyoming?
The Kent County Road Commission, which is the enforcing agency for the city.
Do contractors need to register?
Yes. Building contractors register for free; plumbing and mechanical registrations are $15 and electrical $60.
Simplify Wyoming permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Wyoming sooner?
Let Alliance prepare, file, and track your Wyoming permits while your crew stays on the job.
More Michigan permitting guides
Kent County
Read guide →Ada Township
Read guide →Algoma Township
Read guide →Ypsilanti Building Permit Guide
Read guide →Ypsilanti Charter Township Building Permit Guide
Read guide →Zeeland Charter Township Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Wyoming permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.