In Gogebic County the building permit always comes from the city or township where the land sits. The state’s Statewide Jurisdiction List marks the county as having no county program, shows Bessemer, Ironwood, Wakefield and the six townships each enforcing the building code locally, and puts electrical, mechanical and plumbing permits with the state Bureau of Construction Codes everywhere. The county’s own pages say it does no building inspections and handles no zoning; at county level you deal with the Gogebic Conservation District for soil erosion, the Road Commission for county roads and the Western Upper Peninsula Health Department for septic and well permits.
What requires a building permit in Gogebic County?
The state construction code applies in every Gogebic community, but the list of local permits, fees and forms belongs to whichever unit enforces it. Ironwood, the largest city, is a good guide to scope: its building department permits all new buildings and garages, alterations, swimming pools, demolitions and what it calls sundry repairs, naming replacement siding, roofing, windows and decks. A job begun without a permit pays a higher fee under city ordinance, and no new building may be occupied without a certificate of occupancy.
From the city or township
- Building permit and plan review for new homes, garages, additions and alterations
- Re-roofing, siding, windows and decks where the unit permits them (Ironwood does)
- Zoning or land-use approval, fence and driveway permits where the unit has them
- Rental registration and inspection in Ironwood
From other agencies
- Electrical, mechanical and plumbing permits: state Bureau of Construction Codes
- Earth changes within 500 feet of a lake or stream, or of an acre or more: Gogebic Conservation District
- Septic systems and wells: Western Upper Peninsula Health Department
- Work in a county road right-of-way: Gogebic County Road Commission
What local units decide and what the state holds
No unit can rewrite the state code; each one chooses whether to enforce building itself (all nine do), sets its own fee schedule and zoning ordinance, and handles appeals through its own board, such as Ironwood’s seven-member Construction Board of Appeals. The trades stay with the state in every unit, so trade fees, inspections and contractor checks follow the state’s process rather than a local one. Ironwood also publishes its design criteria for local conditions: a 60-pound ground snow load, a 42-inch frost depth and required ice-shield underlayment on roofs.
Gogebic County building department: who handles permitting
The Bureau of Construction Codes’ jurisdiction list (revised November 6, 2026) gives one answer for every Gogebic unit: building enforced locally, electrical, mechanical and plumbing by the state. The county’s Building Inspectors page agrees that the county does not conduct building inspections and lists a building inspector contact for each city and township; that page was last updated on February 15, 2022, so confirm the contact with the unit’s office.
Short on time to read all of this?
Get a free quote →| Local unit | Building | Electrical, mechanical, plumbing |
|---|---|---|
| City of Ironwood (pop. 4,950, 2025 Census estimate) | City building department, Memorial Building | State BCC |
| City of Bessemer (pop. 1,787) and City of Wakefield (pop. 1,689) | Each city’s own inspector | State BCC |
| Ironwood Charter Township | Township building inspector | State BCC |
| Bessemer, Erwin, Marenisco, Wakefield and Watersmeet townships | Each township’s own inspector | State BCC |
Zoning, assessing and land use are local too: the county Equalization Department says each of the nine units employs its own assessor and that the city or township, not the county, deals with zoning. The county also lists the Lac Vieux Desert Band of Lake Superior Chippewa Indians alongside its local governments.
| Office | Contact |
|---|---|
| Gogebic County Courthouse (county offices) | 200 N. Moore St., Bessemer, MI 49911; 906-667-0411 |
| Equalization (county GIS) | 200 N. Moore St., Bessemer; 906-663-4414 |
| Gogebic Conservation District (soil erosion agency) | 500 N. Moore St., Bessemer; 906-663-4512 |
| Gogebic County Road Commission | Courthouse Annex, 200 N. Moore St., Bessemer; 906-667-0233 |
| Western UP Health Department, Gogebic office | 210 N. Moore St., Bessemer; 906-482-7382; 8:00 a.m. to 4:00 p.m. Central Time |
| Drain Commissioner | 906-667-1139 (the county has no drainage districts) |
Permit types in Gogebic County
Because each unit runs its own building program, application forms differ. Ironwood posts a fillable building permit application and a fee sheet from its building page; Ironwood Charter Township posts a building permit application plus land zoning, fence, driveway and land division applications on one forms page. The City of Bessemer uses one general building permit application (fill in only what applies) and a separate, shorter application for roof-only jobs; its building inspector works by appointment.
Residential permits
- New homes, garages and additions need the local building permit and plan review, with separate state permits for wiring, heating and plumbing.
- Repairs and replacements such as roofing, siding, windows and decks are on Ironwood’s permit list; other units set their own lists, so ask before you start.
- Demolition needs a building permit in Ironwood, which also runs a Structure Demolition Incentive Program offering city property owners financial reimbursement for taking down deteriorated structures.
- Rental homes in Ironwood must be registered and inspected for a Certificate of Compliance before they are rented.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings get plan review from the local building office for the structure, while the electrical, mechanical and plumbing plans and permits go to the state. Ironwood’s code list covers multi-family, commercial, retail and industrial construction, and its building department supports the Construction Board of Appeals, which hears questions about the building, electrical, plumbing, mechanical and fire codes.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Each city or township runs its own zoning. Ironwood Charter Township routes zoning applications through the township supervisor. Bessemer rewrote its zoning code in 2021, publishes a Guide to Development, asks applicants to book a meeting with the City Manager before filling in zoning forms, and wants a Zoning Action Request Form with every zoning application; fees can be mailed to City of Bessemer, 411 S. Sophie, Bessemer, MI 49911. Watersmeet Township’s Board of Trustees approved amendments to sections 3.02C(3), 6.01B(3)(4) and 6.02B(6) of its zoning ordinance on August 19, 2026, and the township says the changes are now final.
- Soil erosion. The Gogebic Conservation District is the county’s soil erosion and sedimentation control agency. Under Part 91 a permit is needed for earth changes within 500 feet of a lake or stream and for any earth change of one acre (43,560 square feet) or more; its fillable application and plan development guide are online.
- Septic and well. The Western Upper Peninsula Health Department evaluates the site first; once a parcel is found suitable you apply for the septic permit, and construction may begin after the application is approved and paid.
- Roads. All Gogebic County Road Commission permits go through the Oxcart Permits system.
- Drains. The county elects a drain commissioner, but there are currently no drainage districts in Gogebic County.
Gogebic County permit costs and fees
There is no county building fee schedule, because there is no county program. Each city and township sets its own building fees, the state sets the electrical, mechanical and plumbing fees, and the conservation district, health department and road commission each charge for their own permits.
Rather talk it over?
Call 1-855-478-4290 →| Fee | Set by | Where to find it |
|---|---|---|
| Building permit and plan review | The city or township | Ironwood’s fee sheet on its building page; Ironwood Township says its fees follow the Michigan standard fee list and what is being built |
| Starting work without a permit | The city or township | Ironwood raises the permit fee by ordinance |
| Zoning permits | The city or township | Bessemer links its zoning fee list from its zoning page and takes check, card or cash |
| Electrical, mechanical, plumbing | State Bureau of Construction Codes | The state’s trade permit fee schedule |
| Soil erosion permit | Gogebic Conservation District | Ask the district at 906-663-4512 |
| Septic and well permits | Western UP Health Department | Its Onsite Sewage Program Fee Schedule |
| Road right-of-way permit | Gogebic County Road Commission | Its permit fee schedule, paid through Oxcart |
For an estimate on a township job, Ironwood Charter Township invites questions to its building inspector before you apply. In Ironwood, ask the building department at 906-932-5050, extension 115, for the current fee sheet.
Trade permits and who may pull them
Every electrical, mechanical (heating, cooling and gas piping) and plumbing permit in Gogebic County is a state permit; Ironwood’s own building page tells residents that electrical, plumbing and heating permits are obtained through the State of Michigan. The state Bureau of Construction Codes issues the permit, collects the fee and sends its own inspector. County pages elsewhere in Michigan give the bureau’s permit contact as bccpermits@michigan.gov or 517-241-9313.
- Contractors. Electrical, mechanical and plumbing contractors work under state licenses, and residential builders and maintenance and alteration contractors are licensed by the state as well; Ironwood’s building page points owners to the state to check a builder’s license.
- Homeowners. The state decides whether an owner may take out a trade permit for work on their own home, so ask the bureau about owner permits before doing your own wiring, plumbing or furnace work.
- Two inspectors. On a new home you deal with the local building inspector for the structure and with state inspectors for each trade, so plan the order of inspections with both.
Rather not deal with the Gogebic County building department?
Get a free quote →How to get a building permit in Gogebic County
Check whether the parcel is in Bessemer, Ironwood or Wakefield city or one of the six townships; parcel lines and owners are on the county GIS mapping system kept by Equalization.
Get the city’s or township’s zoning or land-use approval; Ironwood Township also issues fence and driveway permits.
Apply to the Gogebic Conservation District if you are within 500 feet of water or disturbing an acre, to the health department for septic or well work, and through Oxcart for a county road permit.
File the unit’s building application with plans; in Ironwood that is the building department in the Memorial Building, 213 S. Marquette St.
Take out electrical, mechanical and plumbing permits with the Bureau of Construction Codes, or have your licensed contractors do so.
Book building inspections with the local inspector and trade inspections with the state, and get the certificate of occupancy before moving in.
Review, corrections and what causes delay
The most common delay here is filing in the wrong place: the county has no permit counter, so building papers go to the city or township and trade papers to the state. Waterfront lots add the conservation district’s soil erosion review, rural lots wait for the health department’s site evaluation before a septic permit, and contact details on the county’s 2022 inspector list may have changed.
Inspections and occupancy in Gogebic County
Each city or township schedules its own building inspections, and Ironwood’s building department warns that a building must pass final inspection and receive a Certificate of Occupancy before anyone uses it. State inspectors handle the electrical, mechanical and plumbing inspections on their own schedule. On a septic job, the installer calls the health department for the final inspection, and the sanitarian leaves an approved tag before the system may be covered.
- Bessemer inspections are arranged with the city’s building inspector, who keeps appointment-only office hours; call City Hall at 906-663-4311.
- Ironwood rental units need an inspection and Certificate of Compliance after registration.
Michigan building code
Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Gogebic County building permit FAQs
Want this handled start to finish?
Get a free quote →Does Gogebic County issue building permits?
No. The state lists Gogebic as having no county program, and the county says it does not conduct building inspections. Each city and township issues its own.
Where do I get an electrical or plumbing permit in Ironwood?
From the State of Michigan. Ironwood’s building department issues only the building permit; electrical, plumbing and heating permits go through the state, as they do in every Gogebic unit.
Does the county handle zoning?
No. The county Equalization page says your local city or township deals with zoning.
When do I need a soil erosion permit?
For earth changes within 500 feet of a lake or stream, or of one acre or more anywhere, from the Gogebic Conservation District in Bessemer (906-663-4512).
Who issues septic and well permits?
The Western Upper Peninsula Health Department, whose Gogebic County office is at 210 N. Moore Street in Bessemer (906-482-7382).
Who handles zoning in Bessemer?
The City of Bessemer. It recommends an appointment with the City Manager before you fill in a zoning permit, and every zoning application needs its Zoning Action Request Form.
Do I need a permit to re-roof in Ironwood?
Yes. Ironwood lists roofing, siding, window and deck replacement among the repairs that need a building permit, and its design criteria require ice-shield underlayment.
Gogebic County permit search and official resources
Building permit records are held by the city or township that issued the permit, and trade permit records by the state. For county records, the county posts a Request for Public Record form on its FOIA page, and parcel maps are on the county GIS system kept by Equalization.
Inspections are where schedules slip.
Get a free quote →- Gogebic County building inspector contacts by local unit
- Gogebic County townships and cities
- Gogebic County Equalization (zoning and assessing note)
- Gogebic County GIS mapping system
- Gogebic Conservation District contact (county page)
- Gogebic Conservation District soil erosion program
- Soil erosion permit application
- Gogebic County Road Commission permits
- Western UP Health Department offices
- Sewage system permitting
- Well construction permitting
- City of Ironwood building department
- Ironwood Charter Township building and zoning forms
- City of Bessemer building permits
- City of Bessemer zoning ordinance and permits
- Watersmeet Township zoning ordinance update (August 2026)
- Gogebic County Drain Commissioner
- Gogebic County FOIA request
- Bureau of Construction Codes Statewide Jurisdiction List
Simplify Gogebic County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Gogebic County sooner?
Let Alliance prepare, file, and track your Gogebic County permits while your crew stays on the job.
More Michigan permitting guides
Iron County
Read guide →Gladwin County
Read guide →Genesee County
Read guide →Grand Blanc Charter Township Building Permit Guide
Read guide →Grand Haven Building Permit Guide
Read guide →Grand Haven Charter Township Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Gogebic County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.