Gogebic County, Michigan Building Permit Guide

To get a building permit in Gogebic County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Gogebic County runs no building department: each of its three cities and six townships issues its own building permits, and the state Bureau of Construction Codes issues every electrical, mechanical and plumbing permit in the county.

Authority: City and township building officesCounty program: NoneTrades: State Bureau of Construction Codes
Building permits
Each city or townshipNine local units, no county office
Electrical, mechanical, plumbing
State BCCEvery unit in the county
Soil erosion
Gogebic Conservation District906-663-4512, Bessemer
Septic and wells
Western UP Health Dept.210 N. Moore St., Bessemer

In Gogebic County the building permit always comes from the city or township where the land sits. The state’s Statewide Jurisdiction List marks the county as having no county program, shows Bessemer, Ironwood, Wakefield and the six townships each enforcing the building code locally, and puts electrical, mechanical and plumbing permits with the state Bureau of Construction Codes everywhere. The county’s own pages say it does no building inspections and handles no zoning; at county level you deal with the Gogebic Conservation District for soil erosion, the Road Commission for county roads and the Western Upper Peninsula Health Department for septic and well permits.

What requires a building permit in Gogebic County?

The state construction code applies in every Gogebic community, but the list of local permits, fees and forms belongs to whichever unit enforces it. Ironwood, the largest city, is a good guide to scope: its building department permits all new buildings and garages, alterations, swimming pools, demolitions and what it calls sundry repairs, naming replacement siding, roofing, windows and decks. A job begun without a permit pays a higher fee under city ordinance, and no new building may be occupied without a certificate of occupancy.

From the city or township

  • Building permit and plan review for new homes, garages, additions and alterations
  • Re-roofing, siding, windows and decks where the unit permits them (Ironwood does)
  • Zoning or land-use approval, fence and driveway permits where the unit has them
  • Rental registration and inspection in Ironwood

From other agencies

  • Electrical, mechanical and plumbing permits: state Bureau of Construction Codes
  • Earth changes within 500 feet of a lake or stream, or of an acre or more: Gogebic Conservation District
  • Septic systems and wells: Western Upper Peninsula Health Department
  • Work in a county road right-of-way: Gogebic County Road Commission

What local units decide and what the state holds

No unit can rewrite the state code; each one chooses whether to enforce building itself (all nine do), sets its own fee schedule and zoning ordinance, and handles appeals through its own board, such as Ironwood’s seven-member Construction Board of Appeals. The trades stay with the state in every unit, so trade fees, inspections and contractor checks follow the state’s process rather than a local one. Ironwood also publishes its design criteria for local conditions: a 60-pound ground snow load, a 42-inch frost depth and required ice-shield underlayment on roofs.

Gogebic County building department: who handles permitting

The Bureau of Construction Codes’ jurisdiction list (revised November 6, 2026) gives one answer for every Gogebic unit: building enforced locally, electrical, mechanical and plumbing by the state. The county’s Building Inspectors page agrees that the county does not conduct building inspections and lists a building inspector contact for each city and township; that page was last updated on February 15, 2022, so confirm the contact with the unit’s office.

Short on time to read all of this?

Get a free quote →
Construction code enforcement in Gogebic County
Local unitBuildingElectrical, mechanical, plumbing
City of Ironwood (pop. 4,950, 2025 Census estimate)City building department, Memorial BuildingState BCC
City of Bessemer (pop. 1,787) and City of Wakefield (pop. 1,689)Each city’s own inspectorState BCC
Ironwood Charter TownshipTownship building inspectorState BCC
Bessemer, Erwin, Marenisco, Wakefield and Watersmeet townshipsEach township’s own inspectorState BCC

Zoning, assessing and land use are local too: the county Equalization Department says each of the nine units employs its own assessor and that the city or township, not the county, deals with zoning. The county also lists the Lac Vieux Desert Band of Lake Superior Chippewa Indians alongside its local governments.

County-level offices that touch a building project
OfficeContact
Gogebic County Courthouse (county offices)200 N. Moore St., Bessemer, MI 49911; 906-667-0411
Equalization (county GIS)200 N. Moore St., Bessemer; 906-663-4414
Gogebic Conservation District (soil erosion agency)500 N. Moore St., Bessemer; 906-663-4512
Gogebic County Road CommissionCourthouse Annex, 200 N. Moore St., Bessemer; 906-667-0233
Western UP Health Department, Gogebic office210 N. Moore St., Bessemer; 906-482-7382; 8:00 a.m. to 4:00 p.m. Central Time
Drain Commissioner906-667-1139 (the county has no drainage districts)

Permit types in Gogebic County

Because each unit runs its own building program, application forms differ. Ironwood posts a fillable building permit application and a fee sheet from its building page; Ironwood Charter Township posts a building permit application plus land zoning, fence, driveway and land division applications on one forms page. The City of Bessemer uses one general building permit application (fill in only what applies) and a separate, shorter application for roof-only jobs; its building inspector works by appointment.

Residential permits

  • New homes, garages and additions need the local building permit and plan review, with separate state permits for wiring, heating and plumbing.
  • Repairs and replacements such as roofing, siding, windows and decks are on Ironwood’s permit list; other units set their own lists, so ask before you start.
  • Demolition needs a building permit in Ironwood, which also runs a Structure Demolition Incentive Program offering city property owners financial reimbursement for taking down deteriorated structures.
  • Rental homes in Ironwood must be registered and inspected for a Certificate of Compliance before they are rented.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial buildings get plan review from the local building office for the structure, while the electrical, mechanical and plumbing plans and permits go to the state. Ironwood’s code list covers multi-family, commercial, retail and industrial construction, and its building department supports the Construction Board of Appeals, which hears questions about the building, electrical, plumbing, mechanical and fire codes.

What comes before the building permit

  • Zoning. Each city or township runs its own zoning. Ironwood Charter Township routes zoning applications through the township supervisor. Bessemer rewrote its zoning code in 2021, publishes a Guide to Development, asks applicants to book a meeting with the City Manager before filling in zoning forms, and wants a Zoning Action Request Form with every zoning application; fees can be mailed to City of Bessemer, 411 S. Sophie, Bessemer, MI 49911. Watersmeet Township’s Board of Trustees approved amendments to sections 3.02C(3), 6.01B(3)(4) and 6.02B(6) of its zoning ordinance on August 19, 2026, and the township says the changes are now final.
  • Soil erosion. The Gogebic Conservation District is the county’s soil erosion and sedimentation control agency. Under Part 91 a permit is needed for earth changes within 500 feet of a lake or stream and for any earth change of one acre (43,560 square feet) or more; its fillable application and plan development guide are online.
  • Septic and well. The Western Upper Peninsula Health Department evaluates the site first; once a parcel is found suitable you apply for the septic permit, and construction may begin after the application is approved and paid.
  • Roads. All Gogebic County Road Commission permits go through the Oxcart Permits system.
  • Drains. The county elects a drain commissioner, but there are currently no drainage districts in Gogebic County.

Gogebic County permit costs and fees

There is no county building fee schedule, because there is no county program. Each city and township sets its own building fees, the state sets the electrical, mechanical and plumbing fees, and the conservation district, health department and road commission each charge for their own permits.

Rather talk it over?

Call 1-855-478-4290 →
Who sets which fee in Gogebic County
FeeSet byWhere to find it
Building permit and plan reviewThe city or townshipIronwood’s fee sheet on its building page; Ironwood Township says its fees follow the Michigan standard fee list and what is being built
Starting work without a permitThe city or townshipIronwood raises the permit fee by ordinance
Zoning permitsThe city or townshipBessemer links its zoning fee list from its zoning page and takes check, card or cash
Electrical, mechanical, plumbingState Bureau of Construction CodesThe state’s trade permit fee schedule
Soil erosion permitGogebic Conservation DistrictAsk the district at 906-663-4512
Septic and well permitsWestern UP Health DepartmentIts Onsite Sewage Program Fee Schedule
Road right-of-way permitGogebic County Road CommissionIts permit fee schedule, paid through Oxcart

For an estimate on a township job, Ironwood Charter Township invites questions to its building inspector before you apply. In Ironwood, ask the building department at 906-932-5050, extension 115, for the current fee sheet.

Trade permits and who may pull them

Every electrical, mechanical (heating, cooling and gas piping) and plumbing permit in Gogebic County is a state permit; Ironwood’s own building page tells residents that electrical, plumbing and heating permits are obtained through the State of Michigan. The state Bureau of Construction Codes issues the permit, collects the fee and sends its own inspector. County pages elsewhere in Michigan give the bureau’s permit contact as bccpermits@michigan.gov or 517-241-9313.

  • Contractors. Electrical, mechanical and plumbing contractors work under state licenses, and residential builders and maintenance and alteration contractors are licensed by the state as well; Ironwood’s building page points owners to the state to check a builder’s license.
  • Homeowners. The state decides whether an owner may take out a trade permit for work on their own home, so ask the bureau about owner permits before doing your own wiring, plumbing or furnace work.
  • Two inspectors. On a new home you deal with the local building inspector for the structure and with state inspectors for each trade, so plan the order of inspections with both.

Rather not deal with the Gogebic County building department?

Get a free quote →

How to get a building permit in Gogebic County

1. Find the local unit

Check whether the parcel is in Bessemer, Ironwood or Wakefield city or one of the six townships; parcel lines and owners are on the county GIS mapping system kept by Equalization.

2. Clear zoning

Get the city’s or township’s zoning or land-use approval; Ironwood Township also issues fence and driveway permits.

3. Soil, septic and road permits

Apply to the Gogebic Conservation District if you are within 500 feet of water or disturbing an acre, to the health department for septic or well work, and through Oxcart for a county road permit.

4. Apply for the building permit

File the unit’s building application with plans; in Ironwood that is the building department in the Memorial Building, 213 S. Marquette St.

5. Apply to the state for the trades

Take out electrical, mechanical and plumbing permits with the Bureau of Construction Codes, or have your licensed contractors do so.

6. Schedule inspections

Book building inspections with the local inspector and trade inspections with the state, and get the certificate of occupancy before moving in.

Review, corrections and what causes delay

The most common delay here is filing in the wrong place: the county has no permit counter, so building papers go to the city or township and trade papers to the state. Waterfront lots add the conservation district’s soil erosion review, rural lots wait for the health department’s site evaluation before a septic permit, and contact details on the county’s 2022 inspector list may have changed.

Inspections and occupancy in Gogebic County

Each city or township schedules its own building inspections, and Ironwood’s building department warns that a building must pass final inspection and receive a Certificate of Occupancy before anyone uses it. State inspectors handle the electrical, mechanical and plumbing inspections on their own schedule. On a septic job, the installer calls the health department for the final inspection, and the sanitarian leaves an approved tag before the system may be covered.

  • Bessemer inspections are arranged with the city’s building inspector, who keeps appointment-only office hours; call City Hall at 906-663-4311.
  • Ironwood rental units need an inspection and Certificate of Compliance after registration.

Michigan building code

Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules

Gogebic County building permit FAQs

Want this handled start to finish?

Get a free quote →

Does Gogebic County issue building permits?

No. The state lists Gogebic as having no county program, and the county says it does not conduct building inspections. Each city and township issues its own.

Where do I get an electrical or plumbing permit in Ironwood?

From the State of Michigan. Ironwood’s building department issues only the building permit; electrical, plumbing and heating permits go through the state, as they do in every Gogebic unit.

Does the county handle zoning?

No. The county Equalization page says your local city or township deals with zoning.

When do I need a soil erosion permit?

For earth changes within 500 feet of a lake or stream, or of one acre or more anywhere, from the Gogebic Conservation District in Bessemer (906-663-4512).

Who issues septic and well permits?

The Western Upper Peninsula Health Department, whose Gogebic County office is at 210 N. Moore Street in Bessemer (906-482-7382).

Who handles zoning in Bessemer?

The City of Bessemer. It recommends an appointment with the City Manager before you fill in a zoning permit, and every zoning application needs its Zoning Action Request Form.

Do I need a permit to re-roof in Ironwood?

Yes. Ironwood lists roofing, siding, window and deck replacement among the repairs that need a building permit, and its design criteria require ice-shield underlayment.

Gogebic County permit search and official resources

Building permit records are held by the city or township that issued the permit, and trade permit records by the state. For county records, the county posts a Request for Public Record form on its FOIA page, and parcel maps are on the county GIS system kept by Equalization.

Inspections are where schedules slip.

Get a free quote →

Simplify Gogebic County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Gogebic County sooner?

Let Alliance prepare, file, and track your Gogebic County permits while your crew stays on the job.