Egelston Township enforces the state building, electrical, mechanical and plumbing codes itself, so permits for any address in the township come from the Township Office at 5428 E. Apple Avenue (231-788-2308). Jeff Ream is the Building Official, Zoning Administrator and code enforcement officer, and he keeps office hours Tuesday to Thursday, 8 a.m. to 3 p.m. Electrical, mechanical and plumbing permits are $75 for each inspection, or $225 for a new home, and every contractor registers with the township for $10 before a permit is issued.
What requires a building permit in Egelston Township?
The township’s building permit application is used for houses, garages, additions, porches and decks, basements and commercial projects, and it asks for floor-by-floor square footage, the building’s dimensions and a project value that includes labor but not the lot. Separate electrical, mechanical and plumbing applications cover wiring, heating and fireplaces, and plumbing fixtures; the electrical and plumbing forms say that work may not begin until the application is filed with the township.
Building permit
- New homes and additions
- Garages, porches and decks
- Basements (the form asks for basement square footage)
- Commercial and industrial buildings (engineered plans required for any business)
Questions on every application
- Is any part of the project in the 100-year flood plain or a regulated wetland?
- Is the excavation larger than one acre, or within 500 feet of a lake, river, stream or county drain?
- Is the driveway 150 feet or longer (fire department approval)?
- Are there other houses or mobile homes on the property, and what happens to them?
The building page also posts handouts on egress window openings and on pool, spa and hot tub safety, and links the state’s Right to Farm Act FAQ for farm operations.
What Egelston decides and what the state holds
The state Bureau of Construction Codes’ Statewide Jurisdiction List (revised November 6, 2026) shows Egelston Township enforcing all four codes — building, electrical, mechanical and plumbing — locally, and Muskegon County running no program. The township sets its permit fees, registers contractors, holds zoning and land divisions, and appoints its building official, but the technical code is the single state code. Land use is changing in 2026: on September 17, 2026 the Township Board adopted the moratorium resolution it had asked counsel to draft for data centers, while it writes a data center ordinance.
Egelston Township building department: who handles permitting
Building permits, zoning and code enforcement are handled by one person, the Building Official/Zoning Administrator. Electrical and plumbing/mechanical work is checked by separate trade inspectors whose phone numbers are printed on each trade application. Appeals of a building official’s decision use the township’s Construction Board of Appeals application on the Documents page.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Egelston Township Office, 5428 E. Apple Avenue, Muskegon, MI 49442 |
| Phone | 231-788-2308 (Building Department, ext. 17 on the electrical form) |
| Fax | 231-747-8180 or 231-747-8174 |
| Township office hours | Monday to Friday, 8 a.m. to 5 p.m., closed noon to 1 p.m. |
| Building official hours | Tuesday to Thursday, 8 a.m. to 3 p.m.; not in the office Monday or Friday |
| Building Official / Zoning Administrator | Jeff Ream |
| Code status | Township enforces building, electrical, mechanical and plumbing |
Egelston Township permit types
All four permit applications are posted on the township’s Documents page. The electrical and plumbing forms say the application becomes the permit once it is approved, and the building form is signed either by the homeowner or by the contractor, with the contractor’s state license number and expiry date, liability carrier, federal ID, workers’ compensation and unemployment employer numbers or the reason for each exemption.
Residential permits
- Houses and additions need a site plan showing the lot’s dimensions on all sides, every existing and proposed structure with distances to the lot lines and to each other, roads, power and gas lines, water, flood plain or wetland areas nearby, and easements, with north marked.
- Setbacks are measured from the road right-of-way for the front yard and recorded on the application for all four sides.
- New-home trade permits are $225 each for electrical, mechanical and plumbing, with $75 more for a fireplace and $75 for each bathroom beyond two and a half.
- Egress windows, pools and hot tubs are covered by township handouts on the building page.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
For any business, engineered plans must be submitted before an electrical, mechanical or plumbing permit can be issued, and commercial and industrial trade fees are set by the inspector from the plans rather than by the flat $75 rate. The building application has a commercial box and the same contractor and site plan requirements. Medical marihuana businesses use the township’s separate permit applications and checklist.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. The building application’s department-use block checks zoning first, and the township posts its zoning map online. The Planning Commission meets at the Township Complex, normally on the first Tuesday of the month at 7 p.m., and the Zoning Board of Appeals meets when needed.
- Ordinances in progress. On October 15, 2026 the Township Board voted 7–0 to have the Clerk draft a request for proposals for specialized legal counsel on the data center ordinance, and the Planning Commission added meetings on October 27 and December 15, 2026 at 7 p.m. on data centers. The commission has also passed what the minutes call an ordinance on shipping containers for accessory dwelling and sent it to the board; posted minutes do not yet show the board’s vote. The Township Board meets on the first and third Thursdays at 7 p.m.
- Land division. Splits by deed, land contract or lease of more than a year need approval first; the fee has been $50 since March 3, 2008.
- Soil erosion and county drains. Earth changes of one acre or more, or within 500 feet of a lake or stream, need a Part 91 permit from the Muskegon County Department of Public Works (231-724-6411; $160 for a single-family home); the township’s application also asks whether the excavation is within 500 feet of a county drain. The county’s Black Creek Consolidated Drain project includes an Egelston quadrant.
- Water and septic. Where township sewer is not available, Muskegon County Public Health issues septic and well permits (231-724-6208).
- Driveways. A Muskegon County Road Commission permit ($55 for a residential driveway) is needed for any work in a county road right-of-way, and a driveway 150 feet or longer needs fire department approval.
Egelston Township permit costs and fees
The township posts its trade permit fees on the building page and on each trade form, effective July 1, 2023. It does not post a building permit fee schedule; the building application has a blank fee line filled in by the office, so ask at 231-788-2308 for the fee before you apply. Checks are payable to Egelston Township.
| Permit | Fee |
|---|---|
| Electrical, mechanical or plumbing permit | $75 per inspection (1 = $75, 2 = $150, 3 = $225) |
| New home, electrical | $225 |
| New home, mechanical | $225, plus $75 for a fireplace |
| New home, plumbing (up to 2½ baths) | $225, plus $75 per extra bath |
| Commercial and industrial trade permits | Set by the inspector from the engineered plans |
| Contractor registration | $10, with license copies |
| Land division application | $50 |
| Building permit | Not posted; set by the township office |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the posted fees: a mechanical job that needs one inspection is $75, and a wiring job that needs a rough and a final inspection is $150. A new house built by a contractor pays $225 each for electrical, mechanical and plumbing, so $675 in trade permits before the building permit, plus $75 for each bath beyond two and a half and $75 for a fireplace. County permits (soil erosion, septic, well and driveway) are paid to the county agencies.
Trade permits and who may pull them
Egelston issues its own electrical, mechanical and plumbing permits on paper applications filed with the township. The forms state that all contractors must register with the township; registration costs $10 and needs copies of the master and contractor licenses, and it must be updated whenever a license expires. Under Public Act 135 of 1989 the township will not issue a permit without the contractor’s license, employer and insurance details.
- Electrical: the form asks whether a building permit has been obtained and for the Consumers Energy request number, and itemizes services, subpanels, circuits, fixtures, appliances, furnaces, pools and air conditioning.
- Mechanical: heating and other mechanical work; a new home is $225, with fireplaces $75 extra.
- Plumbing: fixtures and piping; installations must follow the state codes and nothing may be concealed before inspection.
- Homeowners: the building and electrical forms carry a homeowner affidavit for work the owner installs in their own single-family home that they live in or are about to occupy, and the owner then arranges the inspections.
Rather not deal with the building department?
Get a free quote →How to apply for an Egelston Township building permit
Call 231-788-2308 or visit the building official Tuesday to Thursday to confirm setbacks, zoning and whether a land division is needed.
Licensed contractors file the township registration with the $10 fee and license copies.
Line up county soil erosion, septic or well and driveway permits, and fire department approval for a driveway 150 feet or longer.
Fill in the project value, floor areas and site plan, and answer the flood plain, wetland and excavation questions.
Add electrical, mechanical and plumbing forms; businesses must include engineered plans.
Pay by check to Egelston Township; the approved application becomes the permit.
Review, corrections and what causes delay
The building official is in the office only three days a week, so allow for that when you need a review or a question answered. Missing contractor registration stops a permit outright, and a business without engineered plans cannot get trade permits. Projects near water or a county drain, in the flood plain or in a regulated wetland need the county and state approvals listed on the application before the township signs off. Under the electrical form, a permit lapses if work does not start within six months or stops for six months, and a cancelled permit cannot be refunded or reinstated.
Inspections and certificates in Egelston Township
When work is ready, call the inspector whose number is printed on the permit, with as much notice as possible, the job address and the permit number. Trade permits are priced by the number of inspections, so a job that needs a rough and a final pays for two. An electrical permit stays valid while work and inspections continue; it is cancelled if no inspection is requested and done within six months of issue or of the last inspection.
A certificate of occupancy must be obtained before a new building is used. The township warns that many homes, additions and garages were never given a final inspection, and asks owners of those open permits to contact the building department, because a final approval can avoid problems with an insurance claim. Neighbors who see unpermitted or unsafe work can use the code and ordinance violation process and complaint form posted on the Documents page.
Michigan building code in Egelston Township
Egelston enforces the single state construction code for all four trades. FEMA’s Community Status Book lists Egelston Township (community 260680) as a participating National Flood Insurance Program community since August 1, 1986, with maps effective July 6, 2015 that show flood areas without base flood elevations.
Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Want this handled start to finish?
Get a free quote →Egelston Township permit search and official resources
To check permits, open permits or inspection history at an address, call the township office, or file a Freedom of Information Act request on the township’s FOIA request form from the Documents page; the same page posts the FOIA guidelines, an appeal form for denials and an indigent fee waiver affidavit. Township ordinances are published online through eCode360.
- Building department page and trade fees
- Documents: permit applications, FOIA forms, zoning map
- Building permit application
- Electrical permit application
- Mechanical permit application
- Plumbing permit application
- Contractor registration form ($10)
- Planning and zoning, land divisions, open permits
- Planning Commission meetings and minutes
- Township Board minutes, September 17, 2026 (moratorium)
- Muskegon County soil erosion permits
- Muskegon County septic permits
- Muskegon County Road Commission permits
- Statewide Jurisdiction List, Bureau of Construction Codes
- FEMA Community Status Book, Michigan
Inspections are where schedules slip.
Get a free quote →Egelston Township building permit FAQs
How much is an electrical, plumbing or mechanical permit in Egelston Township?
$75 for each inspection, so $150 for two; a new home is $225 per trade, with extras for fireplaces and bathrooms beyond two and a half.
How much is a building permit?
The township does not post a building fee schedule; the office sets the fee on the application, so call 231-788-2308 before you file.
When can I reach the building official?
Tuesday to Thursday, 8 a.m. to 3 p.m., at the Township Office; he is not in on Mondays or Fridays.
Can a homeowner do their own work?
Yes, in their own single-family home that they live in or are about to occupy, by signing the homeowner affidavit on the building and electrical forms and arranging the inspections.
Do contractors register?
Yes. Registration is $10 with copies of the master and contractor licenses, and it must be updated when a license expires.
How long does a permit last?
The electrical form says work must start within six months and inspections must keep coming; a permit with no inspection for six months is cancelled and cannot be refunded or reinstated.
Is there a moratorium on data centers?
The Township Board adopted a moratorium resolution on September 17, 2026, running into 2027, while it drafts a data center ordinance with the Planning Commission.
Simplify Egelston Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Egelston Township sooner?
Let Alliance prepare, file, and track your Egelston Township permits while your crew stays on the job.
More Michigan permitting guides
Muskegon County
Read guide →Fruitport Charter Township
Read guide →Muskegon
Read guide →Emmet County Building Permit Guide
Read guide →Emmett Charter Township Building Permit Guide
Read guide →Farmington Hills Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Egelston Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.