Inside the City of Monroe, permits come from the Building Division of the Economic & Community Development department at City Hall, 120 E. First Street (734-384-9186), where Loren Benes is the Building Official. The state’s jurisdiction list shows the city enforcing all four parts of the construction code itself, so building, electrical, mechanical and plumbing permits and inspections all run through this one office. Under the posted fee schedule a job valued at $250,000 carries a building permit fee of $3,115, with a plan review percentage added on top.
What requires a building permit in Monroe?
Any construction, alteration, demolition or change of occupancy that the state code regulates needs a permit from the Building Division before work starts, and the same goes for new or altered electrical, plumbing and mechanical systems. The city adds its own zoning-level permits for small site work, and its fee schedule and handouts show which everyday projects the division expects to see.
Building permit
- New houses, additions, garages and alterations
- Decks, porches and stairs (a sample deck sheet shows 42-inch footings and 36-inch guards)
- Fences taller than 6.5 feet
- Pools, which also carry a $250 construction bond
- Demolition and commercial build-outs
Other city permits
- Fences: $100 fence permit
- Concrete flatwork, sidewalks and driveway slabs
- Placing a shed
- Zoning compliance before a certificate of occupancy
- Temporary uses and seasonal sales
- Signs, under the sign ordinance amended in 2025, plus sidewalk cafés
The Building Division asks owners who are unsure which permits apply to call 734-384-9186 before filing. Its handouts page has sample site plans for a deck, corner-lot and interior-lot fences, flatwork, a front porch, a garage, a patio, a pool and a shed, which show the level of detail the counter accepts.
What Monroe decides and what the state holds
The technical rules come from the state construction code, which the city cannot amend. Monroe decides who reviews and inspects (its own staff for every trade), sets its fees, runs its Zoning 2020 ordinance (the posted copy was updated in July 2025) and handles appeals through its own Construction Board of Appeals, Zoning Board of Appeals and dangerous-building hearings. The general municipal code is published on eCode360; for small projects, the fee schedule and handouts above are the city’s plainest statement of what needs which permit.
Monroe building department: who handles permitting
The Building Division is part of the Economic & Community Development department. Besides permits and inspections it registers contractors, inspects commercial occupancies, enforces the zoning ordinance and the blight and rental housing codes, and keeps the city’s construction data. Planning and zoning approvals (rezoning, special land use, site plans) are handled with the Planning & Zoning staff, reached at 734-384-9129.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building Division, Monroe City Hall (first floor), 120 E. First St., Monroe, MI 48161 |
| Building Official | Loren Benes |
| Phones | Building 734-384-9186; rental 734-384-9185; fax 734-384-9108 |
| Hours | Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| Trades enforced | Building, electrical, mechanical and plumbing, all by the city (state jurisdiction list) |
| Applications | Online forms at forms.monroemi.gov, linked from the Permits and Forms page |
The city’s permits stop at the city line. The neighboring Monroe Charter Township and Frenchtown Charter Township run their own building departments, and Monroe County has no county building program, so a Monroe mailing address alone does not tell you which office to use.
Monroe permit types
The Building Division’s application list covers building and zoning permits, sign permits, contractor registration, plumbing, mechanical and electrical permits, zoning compliance, certificates of occupancy, temporary uses and structures, rental housing registration and administrative site plan review. Most of these are now online forms.
Residential permits
- New houses and additions use the building permit application, with separate electrical, mechanical and plumbing permits. A new house also posts a $1,000 construction bond.
- Decks, porches and garages follow the city’s sample site plans; the deck sheet shows 4-by-6 posts on 42-inch-deep footings, guards at least 36 inches high and stair risers no taller than 8¼ inches.
- Pools need a building permit and a $250 bond; pool wiring is a separate $50 electrical item.
- Rental homes are registered and certified by the division’s rental staff ($150 certification, $100 re-inspection).
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial work runs through the same building application plus plan review, which the schedule charges on every building permit. A change of tenant or use starts with a zoning compliance application, which must be completed before the certificate of occupancy application. Larger site changes go to administrative site plan review ($500 with 10 sets of documents) or to the Citizens Planning Commission ($1,200 with 17 sets), and each revised site plan adds $200. Minor site plan review ($100) covers façade changes such as windows, awnings and signs. Subdivision plats cost $2,000 plus $25 a lot, and a planned unit development pays $2,000 plus $25 a lot at the preliminary stage and $1,000 at final.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. The division checks zoning on every building permit. Variances go to the Zoning Board of Appeals ($500, with four full-size and six smaller sets of documents plus an electronic copy).
- Planning approvals. Rezoning needs a Citizens Planning Commission hearing and a City Council decision; special land use, land division and similar-use determinations are separate $300–$1,000 applications.
- Historic district. The city has a Historic District Commission staffed by Planning & Zoning; ask early if the property is in a district.
- Public art. Murals, sculptures and other installed art in public spaces, on public property or rights-of-way, or on private property licensed to the city for display fall under the Installed Public Art Ordinance #23-004 that City Council passed in November 2023, with its own application.
- Soil erosion. Part 91 permits in Monroe County come from the Drain Commissioner’s office at 1005 South Raisinville Road (734-240-3105) for earth changes that reach its thresholds.
- Floodplain. FEMA lists the City of Monroe as a participating community with maps dated June 19, 2020, so mapped flood areas along the River Raisin and Lake Erie carry flood rules.
Monroe permit costs and fees
Fees come from the Building and Community Development fee schedule on the division’s Fees page (the file is labelled August 26, 2025; it does not cite a council resolution). The building permit is priced on construction value in bands that chain into each other, with a $75 non-refundable application fee that is counted inside the permit fee, and a plan review charge added as a percentage of the permit fee.
| Item | Fee |
|---|---|
| Minimum building permit | $100 |
| Value $1,000–$10,000 | $100 plus $15 per $1,000 |
| Value $10,001–$500,000 | $235 plus $12 per $1,000 |
| Value $500,001–$1,000,000 | $6,115 plus $5 per $1,000 |
| Value over $1,000,000 | $8,615 plus $5 per $1,000 |
| Plan review (all building permits) | Percentage of the permit fee: 65% in the $0–$10,000 band, falling to 35% for $100,001–$1,000,000 and 25% above $1,000,000 |
| Revised plans after approval | 25% of the original plan review fee, minimum $50 |
| Re-inspection / after-hours inspection | $75 / $100 |
| Starting work without a permit | 50% of the permit fee, minimum $100 |
| Fence permit (fence over 6.5 feet needs a building permit) | $100 |
| Zoning compliance / certificate of occupancy | $50 / $125 |
| Contractor registration, each trade | $25 per year |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the schedule: a project valued at $250,000 sits in the $10,001–$500,000 band, so the permit fee is $235 plus 240 × $12, or $3,115 (the bands chain, since the next band starts at $6,115, exactly the top of this one). The schedule lists plan review as a percentage by band without saying whether the band is read from the value or the fee, so ask the division to confirm the plan review amount before you budget it. Trade permits are separate: the electrical, mechanical and plumbing schedules each start with a $90 application fee, and the electrical schedule prices a new house of up to 2,500 square feet at $250, plus $125 for each further 1,000 square feet.
Trade permits and who may pull them
Because the city enforces every trade, there is no state Bureau of Construction Codes permit to obtain inside Monroe. Each trade has its own online application and its own fee page, and each contractor registers with the city for $25 a year. The registration form asks for the state license number and its expiration date, workers’ compensation carrier, MESC and federal employer numbers, and the names of people allowed to pick up permits under that license.
- Electrical: $90 application including one inspection; services up to 200 amps $20; generator and transfer switch $20; PV or solar modules $10; a new house $250 up to 2,500 square feet.
- Plumbing: $90 application including one inspection; a new single-family house with up to 2½ baths $180; water heater $40; fixtures and floor drains $9 each.
- Mechanical: $90 application; furnaces, boilers, air conditioners and heat pumps $40 each; gas piping $6 per opening; bath and kitchen exhaust $13.
- Licenses: residential builders and maintenance and alteration contractors hold LARA licenses, and electrical, plumbing and mechanical contractors hold state trade licenses; the city’s registration ties those licenses to Monroe permits.
The city’s pages do not publish a homeowner permit form or affidavit for trade work, so an owner planning to do their own wiring, plumbing or heating should raise it with the Building Division before applying.
Rather not deal with the building department?
Get a free quote →How to apply for a Monroe building permit
Make sure the parcel is inside the City of Monroe, not Monroe Charter Township or Frenchtown; the city’s parcel tools and the Building Division can confirm it.
Licensed contractors file the city registration form ($25 a year per trade) before pulling permits.
Variances, site plan review or a zoning compliance application come before the building permit where they apply.
Use the city’s sample site plans as a model for decks, fences, garages, porches, pools and sheds.
Submit the building application and each trade application through the city’s online forms, or bring them to the first-floor counter.
The $75 application fee is non-refundable and counts toward the permit fee; bonds apply to new houses, pools and other listed work.
Review, corrections and what causes delay
Plan review is charged on every building permit, and substantial changes after approval cost a further 25% of the original review fee (minimum $50). Where the city sends plans to a private consultant, the applicant pays 115% of that cost. The forms also set the order of paperwork: a zoning compliance application must be completed before a certificate of occupancy application, and a contractor’s registration names the people who may pick up permits under that license.
Inspections and certificates in Monroe
City inspectors handle building, plumbing and mechanical, and electrical inspections throughout the job. The city’s “request a building inspection” link leads to the Building Division, whose main line is 734-384-9186. The schedule charges $75 for a re-inspection or extra inspection (at the Building Official’s discretion) and $100 for an inspection outside normal business hours, so be ready when the inspector arrives.
Typical stages follow the approved scope: footings (42 inches deep on the city’s deck sheet), framing, trade rough-ins and finals, then the building final. For decks and stairs the same sheet shows what the inspector looks for: a graspable handrail 34 to 38 inches above the stair nosings, guard openings that a 4-inch sphere cannot pass through, and treads at least 9 inches deep. Commercial spaces get an occupancy inspection, and a new use needs zoning compliance ($50) before the certificate of occupancy ($125). A temporary occupancy permit costs $100, and an expired permit can be reinstated for $75.
Rental homes are registered with the division’s rental staff (734-384-9185) and certified after inspection; a 24-hour cancellation policy carries a $100 charge.
Michigan building code in Monroe
The city enforces the state construction code for all four trades, with appeals going to its Construction Board of Appeals ($400 per appeal). FEMA’s Community Status Book lists the City of Monroe (community 260153B) as participating in the National Flood Insurance Program since June 15, 1977, with current maps dated June 19, 2020.
Want this handled start to finish?
Get a free quote →Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Monroe building permit FAQs
Who issues building permits in the City of Monroe?
The city’s Building Division at City Hall, 120 E. First Street (734-384-9186). It also issues the electrical, mechanical and plumbing permits.
How much is a building permit for a $250,000 project?
$3,115 under the posted schedule ($235 plus $12 for each $1,000 above $10,000), plus the plan review percentage and any trade permits.
Do I need a permit for a fence?
Yes. The fee schedule lists a $100 fence permit and says fences over 6.5 feet in height require a building permit.
What happens if work starts without a permit?
The schedule adds 50% of the permit fee, with a $100 minimum.
How do I get a certificate of occupancy for a new business?
File the zoning compliance application ($50) first, then the certificate of occupancy application ($125), and pass the occupancy inspection.
Do contractors have to register with the city?
Yes, for $25 a year per trade, giving the state license number and expiry date.
Is the City of Monroe the same as Monroe Charter Township?
No. The township has its own building department on East Dunbar Road; check which unit the parcel is in before applying.
Monroe permit search and official resources
To get copies of permit, plan or inspection records, file a Freedom of Information Act request through the city’s online FOIA form; for an open permit, the Building Division can tell you its status by phone.
Inspections are where schedules slip.
Get a free quote →- City of Monroe Building Division
- Building permits and forms
- Building and Community Development fee schedule (08.26.25)
- Online building permit application
- Sample site plans and handouts
- Residential deck and stair details
- Contractor registration form
- Zoning Board of Appeals application
- Zoning 2020 ordinance (updated July 2025)
- Planning and Zoning Department
- FOIA public records request form
- Monroe County Drain Commissioner soil erosion permits
- Michigan Statewide Jurisdiction List (Bureau of Construction Codes)
Simplify Monroe permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Monroe sooner?
Let Alliance prepare, file, and track your Monroe permits while your crew stays on the job.
More Michigan permitting guides
Monroe County
Read guide →Monroe Charter Township
Read guide →Bedford Township
Read guide →Montcalm County Building Permit Guide
Read guide →Mount Clemens Building Permit Guide
Read guide →Mount Morris Charter Township Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Monroe permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.