Cadillac, Michigan Building Permit Guide

To get a building permit in Cadillac, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The City of Cadillac takes building and trade permit applications at City Hall, 200 North Lake Street, and its contracted inspection firm, Associated Government Services, reviews plans, issues permits and inspects the work.

Authority: City of Cadillac Community DevelopmentInspections: AGS, 269-629-0600Phone: 231-775-0181
Applications
Community Development200 North Lake Street
Plan review
Up to 7–10 business daysTrade permits up to 3
Trade permits
From $53$205 for a new house
Soil erosion
City Utilities Department$20 per inspection

Inside the City of Cadillac, building, electrical, mechanical and plumbing permits are city permits, not Wexford County permits. You file with the Community Development Department at City Hall, 200 North Lake Street (231-775-0181, permits@cadillac-mi.net), and the city’s contractor, Associated Government Services (AGS), reviews the plans, sets the fee, issues the permit and inspects (269-629-0600). Residential building permits take up to 7 to 10 business days and trade permits up to 3; the city’s own fee guide prices a new 2,000-square-foot house at about $563.

What requires a building permit in Cadillac?

Cadillac’s building application covers residential and commercial new buildings, additions, alterations, attached garages, accessory buildings, decks, re-roofing, foundations, demolition, manufactured homes and fences over 7 feet tall, and its checklists add signs and solar panels. The city’s 2026 guide for homeowners and builders says a residential building permit is needed for a new home, an addition or major changes such as moving walls or replacing major systems.

Building permit

  • New houses, additions and structural remodeling
  • Accessory buildings of 200 square feet or more
  • Decks, re-roofing and foundation-only work
  • Fences taller than 7 feet
  • Solar panels (with an electrical permit and the utility interconnection agreement)
  • Demolition and manufactured home placement

Other city permits

  • Zoning approval with a site plan for accessory buildings under 200 square feet
  • Fence permit ($15) for ordinary fences
  • Right-of-way permit for curb cuts, driveways and sidewalks ($20)
  • Soil erosion permit near water or over an acre
  • Historic District Commission approval for exterior work in the district
  • Electrical, mechanical and plumbing permits

What Cadillac decides and what the state holds

The Bureau of Construction Codes’ Statewide Jurisdiction List (revised November 6, 2026) marks the City of Cadillac as enforcing all four codes itself, while most of the rest of Wexford County is served by the county’s program; Wexford County’s own page agrees that Cadillac issues its own building, trade and soil erosion permits. The state code sets construction standards; the city chooses its inspection contractor, sets fees, enforces its zoning ordinance, runs the historic district and registers rental housing.

Cadillac building department: who handles permitting

The city has retained Associated Government Services to provide all building permit and inspection services. Its Community Development Department is the liaison: it accepts applications, payments and documents, checks each application for completeness, carries out the zoning review and forwards the file to AGS. The department also oversees planning and zoning applications and enforces the zoning ordinance.

Short on time to read all of this?

Get a free quote →
Cadillac permit contacts
DetailInformation
Where to fileCommunity Development Department, City Hall, 200 North Lake Street, Cadillac, MI 49601
City Hall phone231-775-0181
Permit emailpermits@cadillac-mi.net
Community Development DirectorTheresa Waldo, 231-779-7325
Plan review, permits and inspectionsAssociated Government Services, 269-629-0600 (trade forms also list 800-627-2801)
OnlineBS&A Online for trade permit applications and payments
Enforcing agencyCity of Cadillac, all four codes (state list)

Only land inside the city limits goes to City Hall. Parcels in Haring, Clam Lake, Cherry Grove and Selma townships, for example, are served by the Wexford County Building Department under the state list, and Cedar Creek Township issues its own building permits.

Cadillac permit types

The construction forms page lists the building permit application, residential and commercial electrical, mechanical and plumbing permits, fence, sign, mobile home and single-use moving permits, the sidewalk, driveway and right-of-way permit, the soil erosion permit, a historic district work application, roof data and energy code compliance sheets, wall-section details for accessory buildings and new homes, and the two fee calculation guides.

Residential permits

  • Plans and seals. Submit two full plan sets and one digital set. One- and two-family homes under 3,500 square feet do not need an architect’s or engineer’s seal, but roof trusses and other manufactured members need the manufacturer’s sealed drawings.
  • Checklist. A house application needs the energy code worksheet, a site plan or lot diagram, the driveway permit, the water and sewer (or well and septic) permit, a soil erosion permit if the site is within 500 feet of water, proof of ownership and zoning approval, and answers on whether the lot is in the historic district or in a wetland, floodplain or critical dune area. No building permit is issued in a floodplain without EGLE or DNR approval.
  • Lot diagram. Show lot lines, existing and proposed buildings with distances to every side, easements and any lakes, streams or wetlands within 500 feet; the owner or contractor stakes two adjacent lot lines.
  • Re-roofing. Describe the covering, layers, decking, venting and flashing, and attach historic district approval where it applies.
  • Manufactured homes and demolition. A HUD home needs its approved installation instructions, a moving permit, the mobile home checklist and trade permits; a state-approved premanufactured unit needs its building system approval papers. Demolition needs proof that every utility is disconnected and a disposal report if asbestos, tanks or other regulated materials are on site.

Commercial permits

Commercial plans must be sealed by a design professional and come with the same site, utility, soil erosion and zoning items as a house. The site plan review checklist bound into the application asks for AutoCAD files referenced to Michigan State Plane Central coordinates and the city’s vertical datum, and the Zoning Administrator may waive items depending on the project’s scope. Signs need stamped drawings, foundation details for free-standing signs, an approved sign permit and an electrical permit if lit.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Zoning approval comes from Community Development; variances go to the Zoning Board of Appeals (third Thursday, 5:30 p.m.) and plans and special uses to the Planning Commission (fourth Monday, 6:00 p.m., City Council Chambers). Zoning application fees can be paid online by e-check without a fee or by card with one. New addresses come through the city’s address assignment application, and the city also sits on the Cadillac–Clam Lake Joint Planning Commission, listed among the boards its Community Development Department works with.
  • Historic district. Any exterior change in design, materials or appearance in the Cadillac Historic District, created in April 2005, needs a Certificate of Appropriateness; file the work application at least 7 days before the Historic Districts Commission meets on the second Monday. Routine maintenance and painting do not need approval.
  • Right-of-way. Curb cuts must be 12 to 60 feet wide and sidewalk driveway crossings no wider than 35 feet; after payment the city engineer, Prein & Newhof, reviews the application and handles inspections. The form calls for liability insurance of at least $100,000 for bodily injury and $50,000 for property damage.
  • Septic and wells. On sites without city water and sewer, District Health Department #10 at 521 Cobb Street issues the sanitation permit.

Cadillac permit costs and fees

The city’s posted Permit Fee Calculation Guide applies its fee schedule to a “determinant” value: the Bureau of Construction Codes’ square-foot construction cost for the building’s use group and construction type (the 2013 table) multiplied by the floor area, with unfinished basements at 20 percent of the table cost. AGS sets the final fee after plan review and the city emails an invoice.

Rather talk it over?

Call 1-855-478-4290 →
Cadillac permit fee schedule (city fee calculation guide)
ItemFee
Residential 1–2 family, determinant to $1,000$53 plus the number of inspections required
Residential, $1,000 to $10,000$53 + $9.40 per $1,000 over $1,000
Residential, $10,001 to $100,000$137 + $2.70 per $1,000 over $10,000
Residential, over $100,000$373 + $2.10 per $1,000 over $100,000
Commercial, over $10,000$137 + $2.60 per $1,000 over $10,000
Commercial plan review$1.30 per $1,000 to $500,000; $630 + $0.21 per $1,000 above
Residential trade permit, single or safety inspection$53
Residential trade permit, addition or remodel (two inspections)$152
Residential trade permit, new house (three inspections)$205
Fence permit / right-of-way permit$15 / $20
Soil erosion permit$20 per inspection

Worked example from the city’s guide: a new 2,000-square-foot house (use group R-3, construction type VB) has a table cost of $95.34 a square foot, so the determinant is $190,680. The fee is $373 plus $2.10 for each $1,000 over $100,000 (90.68 × $2.10 = $190.43), or about $563.43. Each trade permit for that house adds $205. The commercial guide works through a 20,000-square-foot factory building (use group F-1, type III-A, $71.35 a square foot): a $1,427,000 determinant gives a permit fee of $137 plus 1,417 × $2.60, which adds up to $3,821.20 (the guide’s own sum prints $3,817.20), and a plan review fee of $630 plus 927 × $0.21, or $824.67.

Trade permits and who may pull them

Electrical, mechanical and plumbing permits are issued by AGS for the city. Contractors can register and apply online through BS&A, or email the form to permits@cadillac-mi.net or bring it to City Hall; the Community Development Department forwards it to AGS and emails the approval, and the city’s chart puts the whole process at up to 3 business days.

  • Flat residential pricing. Each residential trade form offers a single inspection ($53), a special or safety inspection ($53), an addition or remodel with two inspections ($152), and a new residence with three inspections ($205); the electrical form also prices an addition or remodel with a service upgrade at $205.
  • Electrical plans. A dwelling of 3,500 square feet or more needs plans with an application for plan examination; plans are not needed when the service is 400 amps or less and the building is 3,500 square feet or less, unless the code official asks for them.
  • Applicant details. The building application asks for the contractor’s license number and expiry, federal ID, state unemployment employer number and workers’ compensation carrier, or the reason for an exemption.

Rather not deal with the building department?

Get a free quote →

How to apply for a Cadillac building permit

1. Check zoning and the historic district

Get zoning approval, and HDC approval for exterior work in the district.

2. Line up site permits

Driveway or right-of-way, utilities or DHD #10 sanitation, and soil erosion near water.

3. Prepare plans

Two full sets plus a digital set, the lot diagram and the energy worksheet.

4. File with Community Development

Email permits@cadillac-mi.net or drop off at 200 North Lake Street.

5. Wait for AGS review

Up to 7 to 10 business days; AGS sets the fee and issues the permit.

6. Pay the emailed invoice

Collect the permit electronically or at City Hall, then call AGS for inspections.

Review, corrections and what causes delay

Community Development screens each file for completeness and zoning before AGS sees it, so a missing checklist item (energy worksheet, proof of ownership, utility or septic permit) stops the clock at the first step. Floodplain sites wait for EGLE or DNR approval, historic district projects for the monthly commission meeting, and right-of-way work for the city engineer’s review.

Inspections in Cadillac

Contractors schedule every building and trade inspection by calling AGS at 269-629-0600; the city’s process chart says construction can begin once the permit is issued. The signer’s certification on the trade forms includes a promise to arrange necessary and timely inspections, and a permit stays valid only while work progresses and inspections are requested. Soil erosion work is inspected by the city’s Utilities Department at $20 per inspection, and starting earth work without a permit can double the fee, with at least $100 added.

Rental housing is inspected under a separate city program: any unit rented for more than three months of a calendar year must be registered, whether a single-family house, an apartment, a mobile home inside or outside a park, a rooming house or a boarding house; certificates are renewed online through the city’s BS&A rental search, and rental inspections are booked through the city’s BS&A scheduling tool.

Michigan building code in Cadillac

FEMA’s Community Status Book lists the City of Cadillac (community 260247) as a participating National Flood Insurance Program community, with its current map dated August 3, 1998, and the city’s building checklist says no permit is issued for a floodplain site without EGLE or DNR approval. The Planning Commission is also updating the master plan in 2026: a first community survey ran from June 23 to July 21, 2026 and drew 249 responses, and a draft plan is posted.

Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules

Want this handled start to finish?

Get a free quote →

Cadillac permit search and official resources

Trade permits and payments run through BS&A Online. For copies of building records, send a Freedom of Information Act request to the city’s FOIA Coordinator (the Payroll Clerk, under the city’s 2024 FOIA policy) at FOIA@cadillac-mi.net or by mail to City Hall.

Inspections are where schedules slip.

Get a free quote →

Cadillac building permit FAQs

Does Wexford County issue building permits in Cadillac?

No. The city issues its own building, trade and soil erosion permits, with Associated Government Services doing plan review and inspections.

How much is a building permit for a new house in Cadillac?

The city’s guide works a 2,000-square-foot house out at about $563, plus $205 for each trade permit.

Can I apply online?

Trade permits can be filed through BS&A; building permits are emailed to permits@cadillac-mi.net or filed at City Hall.

Do I need a permit for a shed?

A building of 200 square feet or more needs a building permit; a smaller one needs zoning approval with a site plan.

How long does review take?

Up to 7 to 10 business days for residential building permits and up to 3 for trade permits.

Who schedules inspections?

The contractor or permit holder, by calling AGS at 269-629-0600.

Do I need approval for exterior work in the historic district?

Yes, any exterior change in design, materials or appearance needs a Certificate of Appropriateness from the Historic Districts Commission; routine maintenance and painting do not.

Simplify Cadillac permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Cadillac sooner?

Let Alliance prepare, file, and track your Cadillac permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Cadillac permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.