Clinton Charter Township is the largest township in Michigan and larger than most of the state’s cities. Charter townships have no analogue in some other states, and the practical point for permitting is simple: this is a full building department with its own ordinances, not a county arrangement or a state-default jurisdiction.
The Building Department handles permits, inspections, code compliance and ordinance enforcement from the Civic Center on Romeo Plank Road. Inspectors keep defined office hours at either end of the day, which is when they can be reached directly rather than through the counter.
This guide covers the Charter Township of Clinton. Macomb County and the neighbouring Macomb communities each run their own permitting, and a township address is not a county filing.
On a new home, the deed comes before the shed. Clinton Township will not issue a permit for a shed, deck, pool or fence until a final certificate of occupancy has been issued for the house and the buyer’s name is on the property deed. Buyers who plan a fence or a deck for the month they move in routinely hit this and lose a season.
What requires a building permit in Clinton Charter Township?
Permit required
- New commercial, multi-family and residential construction, additions and change of occupancy
- Structural alterations, load-bearing changes, foundations, decks and retaining walls
- Electrical work — services, panels, circuits, solar and EV charging — under the electrical part of the state code and the referenced National Electrical Code
- Plumbing work under the plumbing part of the state code, pulled by a state-licensed plumbing contractor; gas piping under the mechanical code
- Mechanical and HVAC change-outs, and work affecting the energy code envelope
- Re-roofing (ordinary repairs excepted), pools, signs, and demolition
Often exempt
- Minor repairs and maintenance replacing materials in kind
- Small accessory structures below the code threshold, where zoning allows
- Painting, flooring, cabinetry and other finish work
- Like-for-like fixture or appliance swaps with no alteration to wiring or piping
The code is the same statewide, but fee schedules, procedures and the choice of third-party agency differ from one municipality to the next, so an exempt list from a neighbouring township is not reliable. An exemption from a building permit is never an exemption from zoning, the energy code, or an electrical or plumbing permit. Confirm scope with the Clinton Township Building Department before work starts.
Local rules worth knowing
The township also reviews tree removal at a low threshold: taking down more than four trees over 4 inches in diameter requires an application to the Planning Commission through the Planning Department, and where a tree sits on or overhangs a lot line only the portion infringing on your property may be cut.
Short on time to read all of this?
Get a free quote →Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Who handles permitting in Clinton Charter Township?
The Building Department covers commercial and residential development in the township, issuing permits, carrying out inspections, enforcing township ordinances alongside the state code, and handling property maintenance complaints.
| Detail | Information |
|---|---|
| Department | Charter Township of Clinton Building Department |
| Address | 40700 Romeo Plank Road, Clinton Township, MI 48038 |
| Phone | (586) 286-9323 |
| Fax | (586) 286-9484 |
| buildingpermits@clintontownship-mi.gov | |
| Office hours | Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| Inspector office hours | 8:30 a.m. to 9:30 a.m. and 3:30 p.m. to 4:30 p.m. |
| Inspection requests | Online inspection request form for active permits |
Inspection requests are made through an online form rather than by phone for routine work, and the form needs the permit number, the address and contact details. The inspectors’ posted office hours at the start and end of the working day are the window for reaching them directly.
Minor residential permit requests have a defined document set, including two copies of a plot plan or mortgage survey showing all structures on the property as well as the proposed project location. The separate plan examination application that older guidance referenced is no longer required with the permit application.
In 2025, building permits issued in Clinton Charter Township authorized 189 new privately owned housing units, 33 of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.
Permit types
Residential permits
Residential permits follow the state residential code with township zoning applied. The permit application carries a grading commitment: by signing, the applicant agrees that no change in grade is anticipated other than by the approved grading plan, and where a change in grade does occur the owner or agent may be required to undertake drainage improvements as directed by the Department of Public Services.
How Michigan contractor credentials work
The licence number goes on the permit application. Michigan requires the application to set out the licence number and expiry date of the residential builder, maintenance and alteration contractor, architect or engineer acting for the owner, together with a written instrument — a contract, power of attorney or letter of authorisation — showing that person is authorised to act. Doing residential work that requires a licence without one is a civil violation, which the county prosecuting attorney or the Attorney General may pursue. Confirm what the Clinton Township Building Department requires for the parcel, along with insurance coverage.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial work runs through plan review with sealed drawings and township zoning review. The permit application records the code edition applied at validation, which is worth confirming with the department for the specific part of the code your work falls under rather than assuming one edition covers the whole job.
Licenses, trade classifications and design professionals
Practically, three credential layers appear on Michigan projects: the state residential builder or maintenance and alteration licence on residential work; separately licensed electrical, plumbing and mechanical trades, also licensed by the state; and, on commercial and larger residential work, drawings sealed by a Michigan-licensed architect or professional engineer, with plans reviewed by a state-registered plan reviewer; detached one- and two-family houses of 3,500 square feet or less need no architect or engineer seal. Confirm what the Clinton Township Building Department requires for the specific building before filing.
Michigan licenses residential builders and maintenance and alteration contractors at state level, and the permit application must carry the licence number. Michigan rules
Clinton Charter Township permit costs and fees
Township fees follow the published schedule by permit type and valuation, with trade permits charged separately and a $100 non-refundable plan examination fee due at submission for new homes and commercial or industrial projects. The department takes cash, cheque or money order, and credit card where accepted through a one-time authorisation form.
Michigan fees are set by whoever holds enforcement for the parcel — the local unit, the county, or the state where neither has taken it on — so the schedule follows the authority rather than the state. A figure from a neighbouring municipality is not reliable, and a figure from a neighbouring township can be wrong even where the county enforces both. Ask the Clinton Township Building Department for the schedule in force on your filing date.
Need a real number for a specific Clinton Charter Township project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.
Fees are set by the enforcing agency — the local unit, a county program or the state — and may only fund that agency's work. Michigan rules
Rather talk it over?
Call 1-855-478-4290 →Trade permits and who may pull them
Permit required
- Service installations, panel upgrades, new circuits, solar PV and EV chargers
- New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
- HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
- Sprinkler, standpipe and fire alarm work on commercial and multi-family structures
Typically exempt
- Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
- Clearing a stoppage without replacing or rearranging concealed piping
- Filter, thermostat and routine component service
- Like-for-like appliance repair that does not alter the connection
Electrical, plumbing and mechanical contractors hold state licences valid anywhere in Michigan, and each trade follows its part of the state construction code. Michigan rules
How to apply for a Clinton Charter Township building permit
A final certificate of occupancy must be issued and the buyer name must be on the deed before a shed, deck, pool or fence permit can be applied for.
Removing more than four trees over 4 inches in diameter requires a Planning Commission application, and the permit application carries a grading commitment.
Minor residential requests need the defined documents, including two copies of a plot plan or mortgage survey showing all structures and the proposed project location.
Applications are available at the department or downloadable. Trade applications must be accompanied by payment; the department takes cash, cheque, money order or, where accepted, a credit card authorisation form.
Confirm which code edition governs each part of the work before drawing to it, since the parts sit on different editions.
Use the online inspection request form for active permits, with permit number, address and contact details ready.
Rather not deal with the building department?
Get a free quote →Review, corrections and what actually causes delay
In Michigan, the first cause of delay is uncertainty over who enforces the code — filing with the local unit when the county holds enforcement for it, or with the county when the state does. After that comes the edition question, because the trade parts and the building parts moved on different dates, and houses still follow the 2015 residential code, so a submission drawn to the wrong one is a correction cycle. Then a missing or expired state licence number on the application, energy-code and plan documentation, and floodplain requirements along the shorelines and rivers. Build the plan-review time into the schedule and confirm the checklist with the Clinton Township Building Department before filing.
A Michigan permit lapses if work does not start within 180 days or stops for 180 days; confirm the expiry with Clinton Charter Township on phased or delayed work. Michigan rules
Inspections in Clinton Charter Township
Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and energy-code compliance, fire systems on commercial work, and final, with a use-and-occupancy certificate before the building is used. Moving into a home before final approval requires approval from the building official or assistant, who can be reached at the department during posted hours.
Ask the enforcing agency which edition applies to your application, especially around a code change date — because editions are adopted part by part, the answer can differ between the building inspection and the trade inspections on the same job. They are carried out by an inspector registered with the state, employed or contracted by whichever authority holds enforcement for the parcel. Keep the approved plans and the energy-code documentation on site for the inspector to check against, and confirm the notice the Clinton Township Building Department needs and its inspection windows.
Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, energy-code documentation and your correction responses available on site.
Clinton Charter Township permit search and official resources
Permit records in Michigan sit with the authority that issued them — the local unit, the county, or the state bureau where neither took enforcement on. Where the Clinton Township Building Department is the authority for the Charter Township of Clinton, it holds the building permit, the inspection history and the use-and-occupancy certificate. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — open permits and missing certificates are a common closing problem.
Want this handled start to finish?
Get a free quote →Confirm the authority having jurisdiction first, then confirm the edition. Michigan enforces one statewide construction code, but enforcement may sit with the local unit, the county or the state, and the code is adopted part by part on separate effective dates. Both questions have to be answered for the parcel and the filing date before the requirements are knowable.
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Clinton Township Building Department
- Clinton Township building permit information
- Clinton Township building and ordinance FAQs
- Clinton Township building permit application
- Michigan Bureau of Construction Codes - current code books and effective dates
Frequently asked questions
Can I get a fence or deck permit before my new house closes out?
No. Clinton Township requires that a final certificate of occupancy has been issued and that the buyer’s name is on the property deed before applying for a permit for a shed, deck, pool or fence.
Do I need approval to remove trees?
If you take down more than four trees over 4 inches in diameter, an application to the Planning Commission is required through the Planning Department. Where a tree sits on or overhangs a lot line, only the portion infringing on your property may be cut.
Which code edition applies to my project?
It depends on the part of the code the work falls under. One Michigan point catches almost everyone: the commercial and residential codes are not on the same edition. The bureau moved the plumbing, mechanical and electrical parts to new editions on the twelfth of March, 2024, and the building and rehabilitation parts to their 2021 editions on the ninth of April, 2025; houses still follow the 2015 Michigan Residential Code. The residential code did not move with them. Replacement residential rules were filed for an August 2025 effective date, but the Court of Claims entered a stipulated order stopping the department from implementing them while a builders’ association challenge is litigated, so the bureau still lists the 2015 Michigan Residential Code as the code in force. That case was still live when this guide was written. Confirm the edition governing each part of your work on your filing date rather than assuming the newest one applies.
Inspections are where schedules slip.
Get a free quote →Does Macomb County issue permits here?
No. Clinton Charter Township administers and enforces the code itself. Michigan’s county tier applies where a local unit does not take enforcement on, which is not the case here.
Can I move in before final approval?
Only with approval from the building official or assistant. These situations usually involve extenuating circumstances and are decided case by case rather than as a matter of course.
Do I need a licensed contractor?
For work requiring a licence, yes, and the licence is issued by the state rather than the township. Residential builders and maintenance and alteration contractors are licensed by the state under Article 24 of Public Act 299 of 1980, administered by the Bureau of Construction Codes, and the plumbing, electrical and mechanical trades are state-licensed as well. The licence is valid statewide. The permit application must set out the licence number and its expiry date, and performing residential work that requires a licence without holding one is a civil violation the county prosecuting attorney or the Attorney General may pursue.
Simplify Clinton Charter Township permitting with Alliance Permitting
The sequencing rules here catch people at exactly the wrong moment — move-in week. We map them onto your programme before the closing date is set.
Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Clinton Charter Township because the work is done by people who have stood at the counter:
- 21+ years of filing, so the authority question gets answered before the application goes in
- We confirm the edition in force for each code part on your filing date, not the newest one published
- Licence numbers, expiry dates and the written authorisation instrument checked before submission
- Correction cycles handled directly with the reviewer so your crew is not waiting on a resubmission
- Inspection sequencing tracked through to the certificate, including trade sign-offs
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Clinton Charter Township sooner?
Let Alliance prepare, file, and track your Clinton Charter Township permits while your crew stays on the job.
More Michigan permitting guides
This guide is provided by Alliance Permitting for general information about Clinton Charter Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.