Lake County is one of the Michigan counties that runs its own construction code program, and the state’s list shows the Lake County Building Department enforcing all four codes in every township and in the villages of Baldwin and Luther. The office at 800 Tenth Street, Suite 110, Baldwin (231-745-2722) takes applications only by mail or in person, not by email, fax or online. A new house costs a $100 base fee plus $0.22 per square foot, and the department also issues the county’s soil erosion permits.
What requires a building permit in Lake County?
The county’s fee schedule is the clearest list of what it permits: new homes, additions and all alterations to houses; mobile and modular homes; garages, pole barns, storage sheds, decks and open porches; ramps; roofing; roofs built over mobile homes or travel trailers and pavilions; chimneys; demolition; multi-family and commercial buildings; and wireless towers.
County permits
- Building permits for the structure
- Electrical, mechanical and plumbing permits, each separate
- Soil erosion permits for building within 500 feet of a body of water
- Fences more than 7 feet high and retaining walls more than 4 feet high
- 911 address signs (county application)
From other offices
- Township or village land use permit where the unit has its own zoning
- Well and septic permits from the health department
- Driveway permits from the Lake County Road Commission or MDOT
- The property address from the Equalization Department
The county checklist names Lake, Peacock, Pleasant Plains, Sauble, Sweetwater, Webber and Yates townships and the Village of Baldwin as locally zoned, so a land use permit from that unit comes before the county building permit there. Electrical, mechanical, plumbing and soil erosion permits are separate and are not included in the building fee.
What the county decides and what the state holds
The construction code is the state’s and cannot be changed locally. Lake County chose to enforce it, and the state’s Statewide Jurisdiction List marks the county as the enforcing agency for building, electrical, mechanical and plumbing work in every local unit. The county sets the permit fees, the filing rules and the inspection schedule, and runs the soil erosion program; zoning stays with the townships and the village that adopted it.
Lake County building department: who handles permitting
Every permit for construction in Lake County comes from one office, which some county forms call the Lake County Department of Building Safety and Permits. The state list shows the county covering all four trades in the townships of Chase, Cherry Valley, Dover, Eden, Elk, Ellsworth, Lake, Newkirk, Peacock, Pinora, Pleasant Plains, Sauble, Sweetwater, Webber and Yates, and in the villages of Baldwin and Luther; no township or village in the county runs its own building program.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | 800 Tenth Street, Suite 110, Baldwin, MI 49304 |
| Phone / fax | 231-745-2722 / 231-745-7214 |
| Hours | Monday to Friday, 8:30 a.m. to 5 p.m.; phones are not answered after 4 p.m.; closed major holidays |
| Code Official | David Wright |
| Filing | U.S. mail or in person only; no email, fax or online applications |
| Payment | Cash, check, money order or credit/debit card |
To find the township for a parcel, or to get an address or proof of ownership, call Equalization at 800 Tenth Street, Suite 230 (231-745-2723, Monday to Friday 8:30 a.m. to 5 p.m.). Baldwin village has 1,025 residents and Luther 328 by the Census Bureau’s 2025 estimates; both are served by the county office.
Lake County permit types
The county posts separate building, electrical, plumbing and mechanical applications, spec-sheet cross sections for houses, pole buildings and garages, a roof loading data sheet, a residential energy efficiency sheet and the soil erosion application. Try to apply about two weeks before the planned start.
Residential permits
- New homes and additions: two copies of a sketch or prints with the spec sheet and cross section, a detailed site map of all buildings with dimensions, truss certification or a roof loading data sheet (snow loads are 50 and 60 pounds per square foot in most areas), and proof of compliance with the residential energy chapter.
- Owners applying themselves: a real estate summary sheet from Equalization proving ownership.
- Mobile homes: a copy of the title with the serial number (or the bank package for a new home), foundation and floor plans, a site plan and a cross section of any deck or landing.
- New houses: a blower door test is required.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects and projects under the Michigan Building Code need construction documents prepared by or under a registered design professional, and the plan review fee is paid when the application is filed. Commercial buildings are priced from a separate commercial fee chart, include up to four scheduled inspections, and multi-family buildings pay $100 per unit plus $0.22 per square foot.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Land use permit: from the zoned township or the Village of Baldwin, as listed above.
- Address: from Equalization; the county also issues 911 address signs on its own application.
- Well and septic: from the health department (231-745-4663, per the county checklist).
- Driveway: for new construction, a copy of the Lake County Road Commission permit (231-745-4666), or an MDOT permit for a drive onto a state highway (1-800-943-6368).
- Soil erosion: building within 500 feet of a body of water needs the county permit before any excavation starts.
Lake County permit costs and fees
Building fees come from the county’s Building Permit Fee Schedule, revised June 23, 2020; soil erosion fees from the county schedule effective October 1, 2023. All building permit fees are subject to plan review fees, and trade and soil erosion permits are charged separately.
| Item | Fee |
|---|---|
| New home, addition or alteration (R-1 to R-4) | $100 base plus $0.22 per sq ft; up to six inspections |
| Energy plan review, new conventional homes | At least $35 more (since February 8, 2016) |
| Residential plan review | $30 flat for 2,000–3,500 sq ft; one-third of the permit fee over 3,500 sq ft |
| Mobile or modular home | $100 plus $0.15 per sq ft; three inspections |
| Unfinished basement (any of the above) | $40 extra |
| Garage, pole barn, shed, deck, open porch | $90 plus $0.15 per sq ft; two to three inspections |
| Roofing (residential and commercial) | $100 plus $0.10 per sq ft of roof replacement; the separate commercial roofing line lists $110 plus $0.10, or $50 plus $0.05 for a shingle re-roof |
| Fence or retaining wall, residential | $75 under 1,000 lineal ft; $150 over |
| Demolition / chimney | $25 plus $0.05 per sq ft / $80 |
| Additional or failed inspection | $65 each |
| Permit extension (180 days) | $75 |
| Soil erosion: new home, accessory building or residential site | $145 (four inspections) |
| Soil erosion: deck up to 300 sq ft / septic replacement | $68 / $75 |
| Soil erosion: commercial under 1 acre / 1 acre | $225 / $340, plus $45 per added acre |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the residential line: a 2,400-square-foot new house is $100 plus 2,400 × $0.22 ($528), or $628, for up to six inspections. Plan review adds the $30 flat rate for that size and an energy review of at least $35, so the building permit comes to at least $693 before the trade permits and the $145 soil erosion permit where one applies. Building without a permit adds after-the-fact charges such as a $105 unscheduled site inspection and an $87.50 notification fee, and an after-the-fact soil erosion permit costs double.
Other charges on the 2020 schedule: wheelchair ramps are $25 under 300 square feet (one inspection) and $50 above (two inspections); a roof built over an existing mobile home, travel trailer or pavilion is $100 plus $0.15 per square foot for residential work and $0.20 for commercial; a wireless communication tower is $385 plus $117 plan review; a certificate of occupancy request on an expired permit is $50; a real estate letter with a certificate of occupancy is $100 plus time spent; and a Construction Board of Appeals hearing is $400. Commercial and multi-family plan review is one-third of the building permit fee, and over 3,500 square feet the same one-third rule applies to houses. Laminated all-weather permit cards are $2 extra.
Trade permits and who may pull them
The county issues the electrical, mechanical and plumbing permits in every Lake County township and village, on separate applications that ask for the state license and the local license where one exists. The building and trade applications each carry a homeowner affidavit: the owner certifies that the work will be done personally in the single-family home the owner occupies or is about to occupy, and takes responsibility for arranging inspections. Under the electrical affidavit, the owner’s wiring may not be enclosed, covered up or put into operation until the county electrical inspector has inspected and approved it.
- Inspection days: electrical on Monday, Tuesday and Wednesday; plumbing and mechanical on Tuesday and Thursday; building Monday to Friday.
- Electrical plans: not required when the service is 400 amps or less and the building 3,500 square feet or less; otherwise sealed plans are needed.
- Final approval: the building final is made only after the electrical, plumbing, mechanical, well and septic approvals.
Rather not deal with the Lake County building department?
Get a free quote →How to get a building permit in Lake County
Call Equalization for the parcel’s unit, its address and, for owners, the real estate summary sheet.
Get it from the township or village if it is one of the locally zoned units.
Well and septic from the health department, a driveway permit for new construction, and the county soil erosion permit near water.
Application, two sets of prints, site map, truss data and energy compliance.
Take it to 800 Tenth Street, Suite 110, Baldwin, or mail it; email and fax are not accepted.
File the electrical, mechanical and plumbing applications and call for inspections.
Review, corrections and what causes delay
Permits cannot be completed online, so the mailed or delivered package has to match the county’s required documentation list, including copies of the outside permits. The county’s documents give two validity rules: the 2025 handout and checklist say permits are valid for one year and can be extended in 180-day steps for $75 each, while the 2020 fee schedule and the 2006 permit holder notice describe 180-day permits extended the same way. The handout adds that a permit is cancelled when no inspection is requested or made within six months of issue or of the last inspection, and cancelled permits are not refunded or reopened. Refunds must be requested before construction starts, and the county keeps up to 25% (at least $60).
Inspections in Lake County
Call 231-745-2722 to schedule every inspection, with at least 24 hours’ notice; the person who signed the application is responsible for calling when the work is ready. Inspectors arrive between 10 a.m. and 4 p.m., so give access instructions when booking. If an inspector is locked out, the county charges $60 plus a $10 fuel recovery fee and inspects only after payment.
A residential permit includes up to six building inspections, and extra or failed inspections are $65 each. Before anyone moves in, all finals, including electrical, plumbing, mechanical and health department approvals, must be passed and a certificate of occupancy issued. Soil erosion permits expire one year after issue, and the county’s renewal schedule says the full original permit fee is paid again at expiry.
Michigan building code in Lake County
Lake County enforces the state code as the county enforcing agency named on the state list for every unit. No Michigan county is a National Flood Insurance Program community: each township and village joins on its own, so ask the township or village office whether a parcel near a river or lake is in a mapped flood area and which flood rules apply.
Want this handled start to finish?
Get a free quote →Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Lake County permit search and official resources
For copies of permits, plans or inspection records, file a Freedom of Information Act request with the county FOIA Coordinator, 800 Tenth Street, Suite 100, Baldwin (231-745-6231, fax 231-745-8632), using the county’s form; the building department’s fee schedule also lists a record search fee of a $15 deposit plus at least $25 an hour, billed in 15-minute steps, and 50 cents a page.
- Lake County Building Department
- Building permit fee schedule (revised 2020)
- Required documentation checklist
- Building department handout
- Building permit application
- Electrical permit application
- Soil erosion application and fees
- Permit renewal fees
- Notice to permit holders
- Building department information sheet
- Equalization (addresses and ownership)
- FOIA requests
- Michigan Statewide Jurisdiction List
Inspections are where schedules slip.
Get a free quote →Lake County building permit FAQs
Does Lake County issue building permits everywhere in the county?
Yes. The state list shows the county enforcing all four codes in all 15 townships and the villages of Baldwin and Luther.
Can I apply online or by email?
No. Applications are accepted only by U.S. mail or in person at 800 Tenth Street, Suite 110, Baldwin.
How much is a permit for a new house?
$100 plus $0.22 per square foot, plus plan review; a 2,400-square-foot house is $628 before plan review.
Do I need a permit for a fence?
Only for a fence more than 7 feet high or a retaining wall more than 4 feet high; residential ones under 1,000 lineal feet are $75.
When are electrical inspections?
Monday, Tuesday and Wednesday; plumbing and mechanical are Tuesday and Thursday, with 24 hours’ notice.
Who issues soil erosion permits?
The county building department; building within 500 feet of water needs one before any excavation, $145 for a new home.
How long is a Lake County permit good for?
The 2025 handout says one year, extendable in 180-day steps for $75 each; a permit with no inspection for six months is cancelled without a refund.
Can a homeowner pull the permit?
Yes, for work done personally in the single-family home the owner occupies or is about to occupy, by signing the homeowner affidavit.
Simplify Lake County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lake County sooner?
Let Alliance prepare, file, and track your Lake County permits while your crew stays on the job.
More Michigan permitting guides
Mason County
Read guide →Osceola County
Read guide →Newaygo County
Read guide →Lansing Building Permit Guide
Read guide →Lapeer County Building Permit Guide
Read guide →Leelanau County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lake County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.