In the Charter Township of Northville, the Building Department at 44405 Six Mile Road (248-348-5830) administers the state construction code: it reviews construction plans, issues building, electrical, mechanical and plumbing permits and inspects the work; Joe Leeson is Chief Building Official. Fees are set in the township’s FY 2026 fee schedule. Zoning, site plans and development applications run through the Planning Department, and soil erosion permits come from Wayne County.
What requires a building permit in Northville Township?
Construction plans for buildings in the township go to the Building Department for review, and work under the state construction code needs a permit and inspections from it. The township’s own ordinances and reminders add rules that reach small jobs too:
Township permits and approvals
- New homes, additions and alterations (plan review, permit and inspections)
- Electrical, mechanical and plumbing work
- Removing a regulated tree: inspection and approval first
- Water and sewer taps and connections
- Site plans, subdivisions, condominiums and land divisions
- Business registration and special events
Township lot rules
- Concrete must stay 4 feet from every lot line
- Sump discharge goes to the subdivision’s storm sewer lead where one exists
- Otherwise sump water stays on the lot, at least 20 feet from the right-of-way line
- No drainage onto the street or a neighbor’s lot
- The township warns that landscaping along lot lines causes drainage problems
The township’s Land Use and Planning Resource puts the Zoning Ordinance, the Sign Ordinance (Chapter 145) and the Master Plan in one place, with the rest of the Code of Ordinances linked from it.
What Northville Township decides and what the state holds
The Bureau of Construction Codes’ Statewide Jurisdiction List (revised November 6, 2026) shows Northville Township enforcing all four codes itself, and Wayne County has no construction-code program. The construction code is the state’s; the township adopts its own fee schedule, zoning and sign ordinances, tree protection, grading and drainage rules, engineering standards and a fire code adopted by its own ordinance, which its Fire Department applies to site plans.
Northville Township building department: who handles permitting
The Building Department is part of the township’s Public Services. It reviews plans, issues permits and carries out building, electrical, mechanical and plumbing inspections with its own inspectors. The township’s land-use site sends questions to four offices:
Short on time to read all of this?
Get a free quote →| Item | Detail |
|---|---|
| Building (codes, permits, inspections) | 44405 Six Mile Road, Northville, MI 48168; 248-348-5830; fax 248-348-5823 |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m. |
| Chief Building Official | Joe Leeson |
| Planning (zoning, land use, development) | 248-348-5830; Planning also directs questions when you are unsure which office to ask |
| Engineering (drainage, utilities, infrastructure) | 248-662-0497 |
| Fire (code compliance, life safety) | 248-662-0450 |
| Township Hall | 248-348-5800 |
The City of Northville is a different government with its own building program on the state list. A Northville mailing address can be in either, so confirm on the tax bill that the parcel is in the township before filing at Six Mile Road.
Northville Township permit types
The township posts its forms, permits and publications in one library, and development applications, development procedures and the fee schedule on its Land Use and Planning Resource.
Residential permits
- Building permits for new homes, additions and alterations after plan review.
- Trade permits for electrical, mechanical and plumbing work, inspected by the township’s own trade inspectors.
- Driveways, patios and flatwork: keep all concrete 4 feet from every lot line under township ordinance.
- Basements and sump pumps: most subdivisions have a sump lead on each lot tied to the storm sewer; the township engineer can say whether a lot has one and roughly where. Without one, the discharge, typically a 3-inch PVC line buried at least 2 feet deep and sloped away from the house, must end on the lot, at least 20 feet from the right-of-way line (about 1 foot behind the sidewalk, or roughly 17 feet from the back of the curb).
- Trees: regulated trees may not be cut down without the township’s inspection and approval.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial projects go through site plan review with the Planning Department, the Fire Department and Engineering before building permits. The Fire Department’s site plan requirements, based on the fire code as adopted by township ordinance, ask every site plan to state the type of construction, square footage, number of stories above and below ground, height, use group, whether the building is sprinklered and a hydrant flow test from the last 12 months, confirmed by the Fire Department or Public Services. Fire apparatus access roads must be at least 20 feet wide (26 feet where there is a hydrant), with a 50-foot outside and 30-foot inside turning radius; cul-de-sac streets may not exceed 1,000 feet; and hydrants are spaced no more than 300 feet apart in non-residential developments and 500 feet in residential ones, with no part of a building more than 300 feet from a hydrant. Engineering applies the township’s standard details and its utility specifications, such as its sanitary sewer pipe standards.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning and site plan. The Planning Department handles zoning, land use and development applications under the Zoning Ordinance, with the Planning Commission for site plans and the Zoning Board of Appeals for variances.
- Soil erosion. Wayne County’s Environmental Services Division is the soil erosion agency in the township: an earth disturbance over 1 acre, or within 500 feet of a lake, river, stream, county drain or regulated wetland, needs a county permit before any earthwork. A single-family house permit is $435 for two years.
- Water and sewer. Taps and connections are priced in the township fee schedule; parcels without public sewer need a Wayne County sewage permit, because building departments in the county require proof of a sewer connection or a sewage permit before issuing a building permit.
- County roads. Driveway approaches and other work in a Wayne County road right-of-way need a county construction permit; the county’s DPS Permit Office issues residential driveway permits and inspects permit work in county roads and township subdivisions (33809 Michigan Avenue, Wayne, 734-858-2774).
Northville Township permit costs and fees
All township fees sit in the FY 2026 Fee Schedule posted on the Financial Services fee page. It covers construction, safety and special inspections, code compliance, the Zoning Board of Appeals, subdivisions, condominiums, land divisions and combinations, engineering, addresses, special events and water and sewer service. The building permit charges are in that document; the department at 248-348-5830 will price a specific job.
Rather talk it over?
Call 1-855-478-4290 →| Item | Detail |
|---|---|
| 1-inch water tap with up to 60 feet of lead | $1,600 (revised May 2024) |
| WTUA direct connection (tap) fee | $500 |
| Water main use charge | $10 per lineal foot |
| Sewer main use charge | $15 per lineal foot |
| Residential maximum for main use charges | 240 feet |
| Business registration | $100; $100 late fee on a renewal |
| Special event application | $50 |
| Wayne County soil erosion permit, single-family house | $435 for 2 years (county fee) |
Water and sewer main use charges are billed per lineal foot, with the 240-foot residential maximum shown in the schedule; they are separate from the tap fee, so ask the township to work out the footage for your lot.
Trade permits and who may pull them
Electrical, mechanical and plumbing permits are local in Northville Township: the Building Department issues them and its own inspectors check the work. The plumbing inspector works Tuesdays, Wednesdays and Thursdays, the mechanical inspector Mondays, Wednesdays and Fridays, and the department also has an electrical inspector.
- Electrical: permit and inspection from the township’s electrical inspector.
- Mechanical: furnaces, air conditioning, gas piping and venting, inspected on Mondays, Wednesdays or Fridays.
- Plumbing: water, drain and vent work, inspected Tuesday through Thursday; water and sewer taps are priced separately in the fee schedule.
- Contractors: the Building Department links the state’s builder license search so owners can confirm a contractor’s license before hiring.
Rather not deal with the building department?
Get a free quote →How to apply for a Northville Township building permit
The City of Northville has its own office.
Zoning, site plan and development applications; 248-348-5830.
Wayne County soil erosion and, where needed, road and sewage permits.
Show grading, sump discharge, concrete setbacks and regulated trees.
File the building and trade applications and pay the fees.
Ask the department at 248-348-5830 how to book; trade inspectors work set days.
Review, corrections and what causes delay
Every set of construction plans is reviewed before a permit is issued. Commercial jobs add Fire Department and Engineering review of the site plan, and the fire checklist lists what every plan must show, such as a hydrant flow test from the last 12 months and the use group. On houses, the township’s own reminders are about drainage: a sump line run to the street or onto a neighbor’s lot is an ordinance violation that has to be corrected, and concrete must stay 4 feet from every lot line. Wayne County reviews soil erosion applications within 30 days of a complete package, which can set the start date.
Inspections in Northville Township
The Building Department performs building, electrical, mechanical and plumbing inspections to confirm work meets the code. The building page gives no booking method, so ask the department at 248-348-5830 during office hours, Monday to Friday 8 a.m. to 4:30 p.m.; it lists its plumbing inspector as working Tuesday to Thursday and its mechanical inspector Monday, Wednesday and Friday.
- Grading and drainage: sump discharge locations and lot drainage that affect the street or neighbors are treated as ordinance violations and must be corrected.
- Trees: cutting a regulated tree requires a township inspection and approval beforehand.
- Soil erosion: Wayne County inspects its permits without set appointments; call 734-326-3936 to request a visit. County permits stay active for two years and must be renewed if the work is not finished.
- Safety and special inspections: billed under the township’s fee schedule.
Michigan building code in Northville Township
FEMA’s Community Status Book lists Northville Township (community 260669) as participating in the National Flood Insurance Program since September 16, 1981, with flood maps effective February 2, 2012; the City of Northville is listed separately.
Want this handled start to finish?
Get a free quote →Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules
Northville Township permit search and official resources
Permit and inspection files are kept by the Building Department at 44405 Six Mile Road; ask there about past permits on a parcel.
- Northville Township Building Department
- Township fee schedule page
- FY 2026 Fee Schedule
- Land Use and Planning Resource: zoning, signs, master plan
- Fire Department site plan requirements
- Northville Township home page
- Wayne County soil erosion permits
- Wayne County road right-of-way permits
- Wayne County septic and onsite sewage
- Bureau of Construction Codes Statewide Jurisdiction List
- FEMA Community Status Book, Michigan
Inspections are where schedules slip.
Get a free quote →Northville Township building permit FAQs
Who issues building permits in Northville Township?
The township Building Department at 44405 Six Mile Road (248-348-5830), for building and all three trades.
Is Northville Township the same as the City of Northville?
No. They are separate governments with separate building programs.
How close to the lot line can I pour concrete?
No closer than 4 feet, under township ordinance.
Where can my sump pump discharge?
Into the subdivision’s storm sewer lead if your lot has one; otherwise onto your own lot, away from the house and at least 20 feet from the right-of-way line.
Can I cut down a tree on my property?
Not a regulated tree without the township’s inspection and approval.
Who issues soil erosion permits?
Wayne County, at $435 for a single-family house, valid for two years.
How much is a water tap?
$1,600 for a 1-inch tap with up to 60 feet of lead, plus main use charges.
What days do the trade inspectors work?
Plumbing Tuesday to Thursday; mechanical Monday, Wednesday and Friday.
Simplify Northville Township permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Northville Township sooner?
Let Alliance prepare, file, and track your Northville Township permits while your crew stays on the job.
More Michigan permitting guides
Wayne County
Read guide →Plymouth Charter Township
Read guide →Redford Charter Township
Read guide →Norton Shores Building Permit Guide
Read guide →Novi Building Permit Guide
Read guide →Oak Park Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Northville Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.