Mount Pleasant, Michigan Building Permit Guide

To get a building permit in Mount Pleasant, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Mount Pleasant’s Building Safety Department at City Hall, 320 W. Broadway Street, issues building permits for work inside the city, while electrical, mechanical and plumbing permits come from Isabella County Community Development at 200 N. Main Street.

Authority: Mount Pleasant Building SafetyFiling: BS&A OnlinePhone: 989-779-5347
Authority
City Building SafetyBuilding permits inside the city
Trade permits
Isabella County200 N. Main St., 989-317-4061
House fee
$65 first $1,000Then $5.20 per $1,000 of value
Hours
Mon–Fri 8:00–4:30City Hall, 989-779-5347

Inside the City of Mount Pleasant, the Building Safety Department administers and enforces the state construction code for building work; Cory Donnell is the Building Official. Permits are applied for through BS&A Online once a first-time applicant has filed the contractor form and received a BSA PIN, and any project that needs construction plans or a site plan is reviewed before the permit is issued. The state’s Statewide Jurisdiction List gives the electrical, mechanical and plumbing codes in the city to Isabella County, so those permits are filed with the county’s Community Development Department at 200 N. Main Street.

What requires a building permit in Mount Pleasant?

The city’s building permit application covers new buildings, additions, alterations and repairs, foundation-only work, demolition, mobile home setups and special inspections. It also names several home projects outright, with their own sections on the form: reroofing, window replacement, decks and swimming pools. A handful of smaller items use the separate zoning approval application instead of a building permit.

Building permit application

  • New one- and two-family houses, townhouses and accessory buildings such as detached garages and pole barns
  • Additions, basement and other finishing work, and structural repairs
  • Reroofing; the form states that no roof may go over more than one existing layer
  • Window replacement, with zoning checks on window size and glazing in street-facing walls
  • Decks, with a deck drawing and building and lot plan; attached decks need a flashing and fastening detail
  • In-ground and above-ground pools, with an approved barrier under the city code
  • Demolition, on its own application

Zoning approval application

  • Fences up to 6 feet: 3.5 to 4 feet at the frontage, 6 feet elsewhere, and 6 feet in the SD-H and SD-A zones, with the finished side facing out
  • Accessory buildings up to 200 square feet for homes, or 120 square feet for businesses, placed in the third lot layer
  • Retaining walls
  • Tents for public assembly or temporary sales, with a site plan; events selling alcohol also need Liquor Control Commission and Department of Public Safety approval

What the city decides and what the state holds

The construction code is the same statewide and the city cannot change it. Mount Pleasant decides how its building fees are set, writes its own form-based zoning ordinance (Chapter 154, built around lot layers and character districts), runs a rental housing program through its Department of Fire Safety, and has adopted the International Fire Code with its appendices; the Building Safety page says the current version took effect April 23, 2026. Who enforces each trade is set by the state list, which leaves electrical, mechanical and plumbing work in the city to the county, and builder and trade licenses are state licenses.

Mount Pleasant building department: who handles permitting

Under the Bureau of Construction Codes’ Statewide Jurisdiction List (rev. Nov. 6, 2026), the City of Mount Pleasant is LOCAL for building and COUNTY for electrical, mechanical and plumbing. The city’s Building Safety staff say they work closely with the Isabella County department, and the county’s electrical, plumbing and mechanical pages each list the City of Mt. Pleasant inside their inspectors’ territory. The county building inspector’s list of communities does not include the city.

Short on time to read all of this?

Get a free quote →
Mount Pleasant permit contacts
DetailInformation
Building permitsBuilding Safety Department, City Hall, 320 W. Broadway Street, Mt. Pleasant, MI 48858
Phone / fax989-779-5347 (office); 989-779-5301 (Building Official); fax 989-773-4691
HoursCity Hall, Monday to Friday, 8:00 a.m. to 4:30 p.m.
Building OfficialCory Donnell
Online filingBS&A Online, after the contractor form and a BSA PIN
Electrical, mechanical, plumbingIsabella County Community Development, 200 N. Main Street, Mt. Pleasant; 989-317-4061
Zoning and site plansPlanning and Community Development, City Hall; 989-779-5347, planning@mt-pleasant.org

Contractors register with the city at no charge. The contractor information form asks for the company, its State of Michigan license and expiry, the license holder, workers’ compensation and liability insurers, and the IRS and MESC employer numbers.

Mount Pleasant permit types

One building permit application serves homes and businesses. New construction is priced from the occupancy group, construction type and new floor area; alterations that add no floor area use the total construction cost. The form also asks for the builder’s license number and expiry, insurance and employer numbers, and any architect or engineer.

Residential permits

  • Houses, townhouses and accessory buildings under the residential code. The checklist revised June 17, 2026 asks for one digital set of drawings (preferred), drawn to scale, with rooms labeled, structural sizes, design loads and calculations, elevations, wall sections from footing to roof, energy code compliance (REScheck or similar) and truss drawings or a truss data affidavit; the older application form still mentions two paper sets.
  • Large homes: a single-family house over 3,500 square feet of livable floor area pays a separate plan review fee.
  • Mobile homes set in a licensed park have a flat building fee; trade permits are extra.

Commercial permits

Commercial, industrial and multi-family buildings are classed by use group and construction type, and every such project needs plan review. Plans must carry the seal and signature of the registered design professional, and the application form asks for three sets. Sprinkler, commercial hood, fire suppression and fire alarm drawings go in with the city’s third-party submittal transmittal, and a commercial energy code application is posted with the forms. The lot plan section of the application notes that every project except a single-family home is reviewed and approved by the Planning Commission.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning and site plan. The site plan must show lot layers, the frontage build-out, setbacks, encroachments, building height, parking and impervious surface. A pre-application meeting with planning, public works, fire and building staff is required before a site plan review, special use permit or rezoning application; Monday 11 a.m. slots are available by appointment.
  • Zoning Board of Appeals. Variances follow section 154.608 of the zoning ordinance. The board cannot grant use variances, and an application is not scheduled until it is complete with its filing fee.
  • Public works permits. Copies of the Department of Public Works permits for water, sewer and storm connections, and for any new or altered driveway in the city right-of-way (989-779-5401), go with the application; work in an MDOT or county right-of-way needs those agencies’ permits.
  • Storm water. A copy of the city storm water permit is required for any earth change; homes disturbing less than 200 square feet may be exempt.
  • Soil erosion. Earth changes within 500 feet of a river or open drain, or over one acre, need an Isabella County soil erosion permit.
  • EGLE. Floodplain or wetland work needs the state’s permits, filed with the application. New buildings request a street address at the same time.

Mount Pleasant permit costs and fees

Building Safety posts its building and plan review fee schedule on the city website. Fees are based on the total cost of improvement, worked out from the current ICC building valuation data (published each February and August) times a permit fee multiplier set each year. The Building Official may accept a declaration of value for unusual projects but is not obliged to. The posted schedule does not show an adoption date, so ask Building Safety which version applies on your filing date.

Mount Pleasant building and plan review fees (Building Safety schedule)
ItemFee
One- and two-family homes: new houses, additions, finishing$65 for the first $1,000 of valuation, then $5.20 per additional $1,000 or fraction
Residential accessory structures: detached garages, pole barns, decks, porchesSame as homes
Mobile home in a licensed park (no trade permits)$180 singlewide; $220 doublewide
Residential plan review, single-family over 3,500 sq ft livable0.0013 × valuation, minimum $200, non-refundable
Commercial, multi-family and industrial$65 for valuation up to $1,000; then $6.20 per $1,000 of valuation or fraction
Commercial plan review (required)0.0013 × valuation, minimum $200, non-refundable
Inspections$70 per required inspection and reinspection; $65 per extra 30 minutes on site
Certificate of occupancy$70 when an inspection apart from the final is needed
Construction Board of Appeals$500
Contractor registrationNo fee

Rather talk it over?

Call 1-855-478-4290 →

Worked example: if the city values a home addition at $50,000, the building fee is $65 for the first $1,000 plus 49 × $5.20 ($254.80), or $319.80; the schedule then lists $70 for each required inspection. Development fees can be paid by cash, check, card (with a surcharge), online, or at City Hall from 8:00 a.m. to 4:30 p.m.

Trade permits and who may pull them

Electrical, mechanical and plumbing permits for Mount Pleasant addresses are Isabella County permits. The county’s applications, effective August 1, 2026, are filed at its inspection office on weekdays, need the correct property tax ID and are paid when filed; fees may be doubled if work starts first.

  • Electrical: a permit is needed whenever a system is installed, enlarged, altered, repaired, removed, converted or replaced; replacing lamps or plugging approved portable equipment into existing receptacles is exempt. Plans are required for new commercial, industrial or multi-family work, and a separate plan review applies when the service exceeds 400 amps and the building is 3,500 square feet or more.
  • Plumbing: stopping a leak or clearing a stoppage needs no permit unless concealed piping has to be replaced, which then counts as new work.
  • Mechanical: all work except replacing minor parts needs a permit before it starts.
  • Who may apply: the county lets a homeowner take out each trade permit and do the work only on a home the owner occupies or is about to occupy. Commercial jobs, apartments and rental units need a contractor in that trade to apply and do the work.

Each county trade permit carries a $75 non-refundable administrative fee and a $70 final inspection, plus item charges; rough, underground or extra inspections are $70 each. A mechanical permit for one gas furnace with only a final inspection therefore totals $176 ($75 + $31 + $70). An expired permit can be extended within 30 days of expiry by written request and a $75 fee.

Rather not deal with the building department?

Get a free quote →

How to apply for a Mount Pleasant building permit

1. Confirm the address and zoning

Make sure the parcel is inside the city, check the zoning district and lot layers, and book a pre-application meeting if a site plan, special use permit or rezoning is involved.

2. Set up BS&A Online

First-time applicants fill in the contractor form and then call 989-779-5347 for a BSA PIN.

3. Collect outside approvals

Gather the public works, storm water, county soil erosion and any EGLE permits the checklist calls for.

4. Submit the application and plans

Apply online with the digital plan set, site plan and energy compliance paperwork, or use the zoning approval form for fences, small sheds and tents.

5. File the trade permits with the county

Electrical, mechanical and plumbing applications go to Isabella County Community Development at 200 N. Main Street.

6. Pay and post the permit

Do not start work until the permit is issued, and keep it displayed on site until final approval.

Review, corrections and what causes delay

Projects with construction plans or a site plan are reviewed before the permit is issued, and anything other than a single-family home goes through the Planning Commission. Applications stall most often on an incomplete site plan (lot layers, setbacks, impervious surface), missing copies of public works or storm water permits, commercial plans without a design professional’s seal, and window replacements in street-facing walls that change glazing area.

Inspections and occupancy in Mount Pleasant

Building Safety inspects the building work; ask the office at 989-779-5347 how to book those inspections when the permit is issued. Each required inspection and reinspection is billed at $70, and the Building Official may reduce the count for repetitive work such as many apartment units.

Isabella County inspects the trades. Call its inspection line at 989-317-4220 at least 24 hours ahead with the name, job address, phone number, trade, inspection type, permit number and how to get into the building; inspections are normally done within 48 hours. The county calls for electrical inspections at the service, rough-in and final stages, and for plumbing and mechanical inspections at underground, rough-in and final, with rough-ins approved before insulation or finishes go on. A certificate of occupancy carries a $70 fee only when it needs a separate inspection, and the forms page has a temporary occupancy application for partial move-ins. Questions about rental properties go to the Department of Fire Safety, which runs the city’s rental program (989-779-5101).

Michigan building code in Mount Pleasant

FEMA’s Community Status Book lists the City of Mount Pleasant (community 260104) as a participating National Flood Insurance Program community, with flood maps effective February 5, 2014. The building permit application asks whether the lot is in a floodplain or a wetland, and EGLE permits for that work must be filed with it.

Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules

Want this handled start to finish?

Get a free quote →

Mount Pleasant permit search and official resources

The city’s BS&A Online site lets the public search property, tax, utility and permit records. For older files or documents not online, submit a Freedom of Information Act request through the city’s online FOIA form; the city posts its FOIA procedures, public summary and cost itemization on the same page. Trade permit records for city addresses sit with Isabella County Community Development.

Inspections are where schedules slip.

Get a free quote →

Mount Pleasant building permit FAQs

Who issues building permits in Mount Pleasant?

The city’s Building Safety Department at City Hall, 320 W. Broadway Street (989-779-5347). Electrical, mechanical and plumbing permits come from Isabella County.

How much does a building permit cost for a home project?

$65 for the first $1,000 of the city’s valuation plus $5.20 for each further $1,000, so a $50,000 addition is $319.80 before the $70 inspection fees.

Do I need a permit for a fence or a small shed?

Both use the zoning approval application: fences up to 6 feet (4 feet at most at the frontage) and accessory buildings up to 200 square feet for homes, placed in the third lot layer.

Can a homeowner pull permits in Mount Pleasant?

The city application has a signature line for an owner doing their own work, and the county lets an owner pull trade permits for a home they occupy or are about to occupy; rentals and commercial jobs need contractors.

Where do I get an electrical permit for a Mount Pleasant address?

From Isabella County Community Development, 200 N. Main Street, weekdays 8:00 a.m. to 4:30 p.m.; inspections are booked on 989-317-4220.

Is a pre-application meeting required?

Yes, before a site plan review, special use permit or rezoning application; Monday 11 a.m. slots can be booked through Planning at 989-779-5347.

How do I get started on BS&A Online?

Complete the contractor form, then call Building Safety for a BSA PIN; registration is free.

Simplify Mount Pleasant permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Mount Pleasant sooner?

Let Alliance prepare, file, and track your Mount Pleasant permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Mount Pleasant permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.