To get a building permit in Scio Township, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In Scio Township the Washtenaw County Building Department issues building and trade permits, but only after the township has approved a zoning compliance permit for the project.

Authority: Washtenaw County Building DepartmentZoning: Scio Township zoning compliance firstPhone: 734-222-3900
Building permits
Washtenaw CountyAll four trades, county program
Zoning compliance
Scio TownshipTypically 7–10 business days
Township Hall
734-369-9400827 North Zeeb Road
Driveway on a county road
$150Uncurbed, Road Commission

Scio Township has no building department of its own. Building, electrical, mechanical and plumbing permits come from the Washtenaw County Building Department (734-222-3900), and any home improvement that needs a county building permit first needs a zoning compliance permit from the township, at Township Hall, 827 North Zeeb Road (734-369-9400). The township reviews zoning compliance applications in-house, typically within 7 to 10 business days, and driveways onto county roads need a Washtenaw County Road Commission permit.

What requires a building permit in Scio Township?

Washtenaw County’s rule is short: an application for a permit must be made before any construction or remodeling work begins. In Scio Township, every home improvement that needs that county building permit also needs a township zoning compliance permit, and the township lists the common cases:

Township zoning compliance

  • Accessory structures: sheds, garages, barns and swimming pools
  • Decks and patios
  • Roof-mounted and ground-mounted solar installations
  • Building additions and interior renovations
  • Generator installations
  • Home occupations and in-home daycare uses

County building and trade permits

  • New construction and remodeling
  • Electrical work, including data, voice and communication wiring
  • Mechanical and plumbing work
  • Decks and swimming pools under the county’s own guidance
  • Roofing, siding and window work (the county posts a notice on it)

Zoning compliance approval must be in hand before the building permit application goes to the county. Certificates of zoning compliance are governed by Section 36-31 of the township’s zoning chapter.

What Scio Township decides and what the county and state hold

The Bureau of Construction Codes’ Statewide Jurisdiction List (revised November 6, 2026) marks Scio Township COUNTY for building, electrical, mechanical and plumbing: the Washtenaw County program enforces all four codes there, as it does in the City of Dexter and the Augusta, Lodi, Saline, Sharon and Webster townships. The township keeps zoning, land divisions and its own ordinances, and it runs its planning work through its Planning Commission, its Zoning Board of Appeals and a planning consultant.

Short on time to read all of this?

Get a free quote →

Scio Township building department: who handles permitting

Two offices share every project. The township handles zoning compliance, variances, land divisions and other land-use applications through its planning consultant, who works with the public, the Board of Trustees, the Planning Commission and the Zoning Board of Appeals and is in the office on Tuesdays and Thursdays by appointment. The county Building Inspection department reviews plans, issues building and trade permits and inspects the work.

Scio Township permit contacts
ItemDetail
Building and trade permitsWashtenaw County Building Inspection, 734-222-3900; online through the county’s Citizen Self Service portal
Zoning compliance and planningScio Township Hall, 827 North Zeeb Road, Ann Arbor, MI 48103; 734-369-9400 (call for an appointment with the planning consultant)
Township Hall hoursMonday to Friday, 8 a.m. to 4 p.m.
Township utilities734-369-9350
Fire department (non-emergency)734-665-6001
County roads and drivewaysWashtenaw County Road Commission, 555 N. Zeeb Road, Ann Arbor; permits 734-327-6642; 7 a.m. to 3:30 p.m. weekdays

Township Hall itself has an Ann Arbor mailing address, but the City of Ann Arbor runs its own building program; a Scio parcel goes to the county for building permits and to the township for zoning.

Scio Township permit types

The township posts its zoning compliance, variance and land division materials on its Homeowner Resources page; the county posts its applications, forms and project guidance on its Building Inspection pages, which cover codes enforced, decks, plan review, radon requirements, required inspections, soil erosion and swimming pools.

Residential permits

  • Zoning compliance (township): the Zoning Compliance Process sheet, the Zoning Compliance Application and, if the applicant is not the owner, a Property Owner Authorization.
  • Variance (township): if a project does not meet setbacks or other dimensional rules in the Zoning Ordinance, the Variance Process sheet, Variance Application, supplemental information form and owner authorization go to the Zoning Board of Appeals under Chapter 36, Article XIV.
  • Land divisions, combinations and boundary adjustments (township): a process sheet and application under Chapter 20 of the township code and the state Land Division Act.
  • Building and trade permits (county): filed with Washtenaw County, online through Citizen Self Service, after the township’s zoning approval. The county’s Residential Code Information Sheet and its notice on roof, siding and window work explain residential requirements.
  • Low-voltage wiring (county): data, voice and communication wiring needs a permit and inspection.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Business projects start with the township’s Planning and Zoning pages, which include Business Resources, Land Use Applications, Concept Meetings and Current Projects, and site plans go to the Planning Commission. The township also publishes Engineering Standards. Plans then go to the county for plan review before building and trade permits are issued.

What comes before the building permit

  • Zoning compliance. Always first for home improvements that need a county permit; typically 7 to 10 business days.
  • Driveways. A new or changed driveway onto a county road needs a Road Commission right-of-way permit, paid when the application is filed.
  • Water and sewer. Where public utilities serve the lot, the township’s Residential Connection Fees page sets the tap fees; ask Utilities at 734-369-9350.
  • Soil erosion. Washtenaw County’s Building Inspection pages include its soil erosion program for earth changes that need a permit.
  • Burning. Open and prescribed burns need a township burn permit.

Scio Township permit costs and fees

Building and trade permit fees are the Washtenaw County Building Department’s, charged on the county permit; call the county at 734-222-3900 for the current amount before you budget. Ask Township Hall (734-369-9400) about any zoning compliance or land-use application fee; the township’s Residential Connection Fees page lists water and sewer tap fees. The Washtenaw County Road Commission publishes its permit fees:

Rather talk it over?

Call 1-855-478-4290 →
Washtenaw County Road Commission permit fees (selected)
ItemFee
Residential driveway, uncurbed approach$150
Residential driveway, curbed approach$75
Upgrade an existing approach$40
Shared driveway approach$150
Second and later sight distance reviews$75
Commercial or private driveway approach$350, plus a 3% inspection fee ($500 minimum)
Temporary construction approach$150
Farm field approach$150
Grading or drainage in the right-of-way$100
Service connection$125
Sanitary, water main or storm sewer connection$220
Site plan review$500

Example: a new house with an uncurbed driveway onto a county road pays the Road Commission $150 at application; a commercial approach estimated at $10,000 pays $350 plus the $500 minimum inspection fee, because 3% of the estimate ($300) is below the minimum. On the county building side, a re-inspection fee may be added when an inspection is canceled because the address is not posted or snow blocks access.

Trade permits and who may pull them

All trade permits in Scio Township come from Washtenaw County: the state list names the county program for electrical, mechanical and plumbing as well as building, so there is no township or state trade permit to file. Apply through the county’s Citizen Self Service portal or its Building Inspection department.

  • Electrical: county electrical permit, including data, voice and communication wiring; concealed low-voltage wiring needs a rough and a final inspection.
  • Mechanical: county mechanical permit for heating, cooling, venting and gas piping.
  • Plumbing: county plumbing permit.
  • Contractors: licensed trade contractors pull county permits under their state licenses; a generator or solar job also needs the township’s zoning compliance permit first.

Rather not deal with the building department?

Get a free quote →

How to apply for a building permit in Scio Township

1. Check the zoning rules

Setbacks and dimensional limits in the Zoning Ordinance; a variance if you cannot meet them.

2. Apply for zoning compliance

Township application, with owner authorization if needed; typically 7–10 business days.

3. Road and utility permits

Road Commission driveway permit; township water and sewer connection if served.

4. Apply to the county

Building and trade permits through Citizen Self Service, after zoning approval.

5. Plan review

The county reviews the plans before issuing the permit.

6. Schedule inspections

Through the county’s inspection scheduling.

Review, corrections and what causes delay

Filing with the county before the township has approved zoning compliance is the step the township warns against: zoning approval must come first. Projects that miss a setback need a variance from the Zoning Board of Appeals, which adds a board decision to the schedule. On the county side, an inspection is canceled, with a possible re-inspection fee, when the street address is not posted where it can be seen from the road or when snow hides the walkway, and inspectors expect the plans and truss drawings on site and safe access to the work.

Inspections in Scio Township

Washtenaw County inspects every permit in the township and lists its required inspections and scheduling on its Building Inspection pages. Its permitting reminders spell out what an inspector expects:

  • Address: the street address must be visible from the road, preferably in characters at least 6 inches high, or the inspection is canceled.
  • Plans on site: building plans and truss drawings must be available at every inspection, starting with the footing inspection.
  • Low-voltage wiring: concealed data, voice and communication wiring needs a rough and a final inspection.
  • Safe access: inspectors will not use unsafe ramps, walkways, guards or ladders, or enter unsafe crawl spaces.
  • Winter work: keep walkways clear of snow, and protect concrete placed in winter; footings must be at least 12 inches wide.

Permit status can be checked at any time on the county’s Citizen Self Service portal, and code appeals go to the county’s Construction Code Board of Appeals.

Michigan building code in Scio Township

FEMA’s Community Status Book lists Scio Township (community 260537) as participating in the National Flood Insurance Program since August 28, 1989, with flood maps effective April 3, 2012; the county’s permit page links FEMA’s flood map service center for checking a parcel.

Want this handled start to finish?

Get a free quote →

Michigan enforces one statewide construction code under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230); local units cannot amend it, and enforcement sits with the city, village or township, a county program or the state Bureau of Construction Codes, sometimes split by trade. Michigan rules

Scio Township permit search and official resources

County building permits for Scio parcels can be looked up through Washtenaw County’s Citizen Self Service portal and its permit records search. Zoning compliance, variance and land division files are kept at Scio Township Hall; ask there (734-369-9400).

Scio Township building permit FAQs

Inspections are where schedules slip.

Get a free quote →

Does Scio Township issue building permits?

No. Washtenaw County issues building, electrical, mechanical and plumbing permits; the township issues zoning compliance permits.

Do I need township approval before applying to the county?

Yes. Zoning compliance approval is required before the building permit application goes to the county.

How long does zoning compliance take?

The township typically completes its review in 7 to 10 business days.

Do I need zoning compliance for a shed, deck or solar panels?

Yes, whenever the project needs a county building permit; sheds, decks, patios, pools and roof or ground solar are on the township’s list.

Who issues driveway permits on county roads?

The Washtenaw County Road Commission; an uncurbed residential approach is $150.

Do I need a permit for network or phone wiring?

Yes. The county requires permits and inspections for data, voice and communication wiring.

What if my project does not meet setbacks?

Apply to the Zoning Board of Appeals for a variance using the township’s variance application.

Simplify Scio Township permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Michigan. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Scio Township sooner?

Let Alliance prepare, file, and track your Scio Township permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Scio Township permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.