Skip to main content
All States

South Carolina Building Permit Guides

86 building permit guides for South Carolina jurisdictions.

How building permits work in South Carolina

Municipal GuideSouth Carolina

Abbeville County Building Permit Guide

Who issues building permits in Abbeville County and the City of Abbeville, what the county charges, and how to get a new-house permit and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Aiken Building Permit Guide

How to get a building permit inside the City of Aiken: what needs one, the City fee schedule, emailing plans, Click2Gov payment and inspection requests.

11 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Aiken County Building Permit Guide

Everything contractors, builders, and developers need to pull an Aiken County building permit — the Development Services Online Portal, the two sets of drawings a residential application needs, the manufactured home registration and moving rules, and the three routes to scheduling an inspection.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Anderson Building Permit Guide

How permits work inside the City of Anderson: the Building and Codes office, ViewPoint Cloud filing, the 2022 fee table, penalties and the inspection sequence.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Anderson County Building Permit Guide

Everything contractors, builders, and developers need to pull an Anderson County building permit — the OpenGov portal, the Compliance or Land Use Permit from Development Standards, the five towns that require an approval letter, the licence copy demanded from every subcontractor, and the septic or sewer document required at issuance.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Bamberg County Building Permit Guide

Where to get a building permit in Bamberg County, what the 2025-2026 fee schedule charges, the new-house and mobile home steps, and how inspections work.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Barnwell County Building Permit Guide

Who issues building permits in Barnwell County and its towns, the county fee chart, what the application needs and the mobile home set-up checklist.

7 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Beaufort Building Permit Guide

How the City of Beaufort permits building work: the four project tiers, the 2024 fee schedule, impact fees, plan set rules, owner-builders and closeout.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Beaufort County Building Permit Guide

Everything contractors, builders, and developers need to pull a Beaufort County building permit — which of three departments you actually need, the vegetated river buffer measured landward of the OCRM critical line, the county business licence required from every subcontractor, and the state Special Inspection Manual.

18 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Berkeley County Building Permit Guide

Everything contractors, builders, and developers need to pull a Berkeley County building permit — the 133 mph wind and D-2 seismic design criteria, the licensed design professional required on residential as well as commercial plans, the 10am inspection cut-off, the Community Rating System flood discount, and the county's own warning about fake invoices.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Bluffton Building Permit Guide

How to get a building permit in the Town of Bluffton: what needs one, the FY2027 fee schedule, the digital plan set, impact fees and stage-by-stage inspection paperwork.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Calhoun County Building Permit Guide

How Calhoun County issues building permits for the county, St. Matthews and Cameron, what the July 2025 fees are, what to submit and how inspections run.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Cayce Building Permit Guide

How building permits work in the City of Cayce: what needs one, the FY26-27 fee tables, the new-construction route through Lexington County stormwater, and inspections.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Charleston Building Permit Guide

Everything contractors, builders, and developers need to pull a City of Charleston building permit — the Customer Self Service portal, the over-the-counter window, the PDF-only upload policy and the notification gap that quietly stalls applications, how sub-trade inspections are scheduled, and what historic district review adds.

14 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Charleston County Building Permit Guide

Everything contractors, builders, and developers need to pull a Charleston County building permit — the EnerGov Citizen Self Service portal, the 911 address that must be posted before any inspection, the septic or sewer approval required before final, the beachfront jurisdictional lines, and the patchwork of municipalities that permit their own work.

17 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Cherokee County Building Permit Guide

Everything contractors, builders, and developers need to pull a Cherokee County building permit — the full list of codes the county has adopted, why three of them are optional codes the county chose to take on, the permitting hours that differ from office hours, and what to have ready before calling for inspection.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Chester County Building Permit Guide

Who issues building permits in Chester County and its towns, how to apply in Evolve, what a new house needs, the published fees and the inspection order.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Chesterfield County Building Permit Guide

Who issues building permits in Chesterfield County and Cheraw, the county fee schedule and exemptions, setbacks, and the new-house inspection checklist.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Clarendon County Building Permit Guide

Who issues building permits in Clarendon County, South Carolina, what they cost, how manufactured homes are permitted and how Manning, Turbeville, Summerton and Paxville are handled.

11 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Clemson Building Permit Guide

How building permits work in Clemson, South Carolina: who issues them, the City fee and plan review schedule, contractor licence rules, fire review and the CO checklist.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Colleton County Building Permit Guide

Who issues building permits in Colleton County, South Carolina, what a new home application needs, which sheds are exempt and how the six towns are handled.

10 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Columbia Building Permit Guide

Everything contractors, builders, and developers need to pull a City of Columbia building permit — the Development Center as single point of entry, the difference between a Building Permit and a Building Trade Permit, the Certificate of Design Approval that historic and design districts require, and the 3pm inspection cut-off.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Conway Building Permit Guide

How building permits work in Conway, South Carolina: who issues them, the 2026-2027 fee schedule, plan requirements, temporary power paperwork and BS&A inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Darlington County Building Permit Guide

Everything contractors, builders, and developers need to pull a Darlington County building permit — the two sets of drawings and plan review fee, the E911 address inquiry that comes first, the owner-builder notice filed with the Clerk of Court, and the clear list of what the department does not handle.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Dillon County Building Permit Guide

Who issues building permits in Dillon County, South Carolina, what the County Code requires, the manufactured home rules and which towns run their own permit offices.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Dorchester County Building Permit Guide

Everything contractors, builders, and developers need to pull a Dorchester County building permit — the 3:00pm-the-day-before inspection rule, the dedicated inspection request address, why the county sits in the Coastal Zone without a single beach, and how Summerville's three-county footprint works.

14 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Easley Building Permit Guide

How building permits work in Easley, South Carolina: who issues them, what needs one, the 2025-2026 fees and impact fees, and how inspections and the CO work.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Edgefield County Building Permit Guide

How building permits work in Edgefield County, South Carolina: the County office that also serves Edgefield, Johnston and Trenton, its fee schedule, application steps and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Fairfield County Building Permit Guide

Who issues building permits in Fairfield County, South Carolina, what the residential and commercial checklists require, how inspections are requested and how Winnsboro, Ridgeway, Jenkinsville and Blythewood are handled.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Florence Building Permit Guide

How building permits work in the City of Florence, South Carolina: the zoning step, the forms, the fee schedule, trade permit charges and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Florence County Building Permit Guide

Who issues building permits in Florence County, South Carolina, which towns the County serves, what the fees and submittals are, and how inspections work.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Forest Acres Building Permit Guide

How building permits work in Forest Acres, South Carolina: who issues them, the FY2027 fees, plan and electronic submittal rules, tree permits and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Fort Mill Building Permit Guide

How building permits work inside Fort Mill town limits: plan routing, Town business licenses, valuation-based fees, impact fees and inspection rules.

13 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Fountain Inn Building Permit Guide

How to get a building permit in Fountain Inn, South Carolina: the iWorQ application, new-home documents, published fees, impact fees and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Gaffney Building Permit Guide

How to get a building permit in Gaffney, South Carolina: the City forms, the two-step fee calculation, plan sets, trade permits and inspection booking.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Georgetown County Building Permit Guide

Everything contractors, builders, and developers need to pull a Georgetown County building permit — the finished-construction elevation certificate that must be approved before a final inspection can even be scheduled, the roster card, the three other approvals final depends on, and the beachfront jurisdictional lines along the Waccamaw Neck.

16 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Goose Creek Building Permit Guide

Everything contractors, builders, and developers need to pull a City of Goose Creek building permit — the ICC Building Valuation Data the city uses to set every fee, the commercial construction information packet, the state special inspection manual, and how the city sits inside the Coastal Zone.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Greenville Building Permit Guide

Everything contractors, builders, and developers need to pull a City of Greenville building permit — the Permit Center on Halton Road, the city's preference for online applications and plans, the card service fee, and the city-versus-county distinction that trips up contractors working both.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Greenville County Building Permit Guide

Everything contractors, builders, and developers need to get a building permit in unincorporated Greenville County — what requires a permit, how fees work, the eTrakit portal, trade permits, and inspections.

9 min readJune 2026
Read Guide
Municipal GuideSouth Carolina

Greenwood Building Permit Guide

How building permits work in the City of Greenwood, South Carolina: who issues them, what to upload in CitizenServe, the fee table and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Greenwood County Building Permit Guide

Everything contractors, builders, and developers need to pull a Greenwood County building permit — the business licence rule that differs sharply between county and city, the thresholds at which an architectural seal becomes mandatory, the Lake Greenwood land disturbance areas, and the approved site sketch.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Greer Building Permit Guide

Everything contractors, builders, and developers need to pull a City of Greer building permit — how a city straddling two county lines works, the 11:59pm inspection request cut-off for next-day inspections, the licensed, insured and bonded verification, and what building without a permit costs.

14 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Hampton County Building Permit Guide

Who issues building permits in Hampton County and its nine towns, the County fee table, new-home submittal list, mobile home rules and inspection days.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Hanahan Building Permit Guide

How to get a building permit in Hanahan, South Carolina: exempt work, contractor licence checks, building and trade fees, inspections, flood and tree rules.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Hardeeville Building Permit Guide

How to get a building permit in Hardeeville, South Carolina: the City permit list, portal filing, the valuation fee table, flood zone rules and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Hilton Head Island Building Permit Guide

Everything contractors, builders, and developers need to get a building permit on Hilton Head Island — what requires a permit, how fees work, the Citizen Self Service portal, LMO Development Review, trade permits, and inspections.

9 min readJune 2026
Read Guide
Municipal GuideSouth Carolina

Horry County Building Permit Guide

Everything contractors, builders, and developers need to pull a Horry County building permit — the 20-day commercial review window, the digital cplans submission, COMchecks and the Special Inspection packet, the beachfront jurisdictional lines on the Grand Strand, and the accessory building exemption.

18 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Irmo Building Permit Guide

How building permits work in Irmo, South Carolina: Town zoning, CC&I Services permits and inspections, the July 2026 fee schedule and inspection booking.

7 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

James Island Building Permit Guide

How to get a building permit in the Town of James Island: the 2026 switch from Charleston County, zoning-first filing, the fee schedule and tree rules.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Jasper County Building Permit Guide

Who issues building permits across Jasper County, what needs one, the County fee chart, the new-home checklist and the paperwork due during construction.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Kershaw County Building Permit Guide

Everything contractors, builders, and developers need to pull a Kershaw County building permit — the separate dock permit application for Lake Wateree frontage, the affidavit route for farm structures, the flood hazard area rules, and the county's own notice about the coming code change.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Lancaster County Building Permit Guide

How building permits work in Lancaster County, South Carolina: who permits each town, the valuation rates, documents, plan review times and inspections.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Laurens County Building Permit Guide

Everything contractors, builders, and developers need to pull a Laurens County building permit — the county's documented account of how the last code changeover was actually enforced, the private third-party building official the City of Laurens uses, and the state limits on owner-builder work.

16 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Lee County Building Permit Guide

How Lee County Planning and Zoning issues building permits, what to submit in Evolve, what the fees are and how inspections are booked.

10 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Lexington Building Permit Guide

How Lexington Planning & Building issues permits inside town limits: the forms, the 2026 fee table, impact fees, owner-builder rules and inspections.

11 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Lexington County Building Permit Guide

Everything contractors, builders, and developers need to pull a Lexington County building permit — the online permits portal and the training documentation the county publishes for it, uploading documents to an existing project, and the municipalities that run their own permitting.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Marion County Building Permit Guide

Who issues building permits across Marion County, SC, what the County asks for with an application, and how inspections are called in.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Marlboro County Building Permit Guide

Which office permits each part of Marlboro County, SC, what the County asks for with an application and how its inspections work.

6 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Mauldin Building Permit Guide

How Mauldin Business & Development Services issues permits: what needs one, the FY2027 fee schedule, plans to submit and how inspections are booked.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

McCormick County Building Permit Guide

How the McCormick County Building Department issues permits, what to submit, how the Town of McCormick sign-off works and how inspections are booked.

6 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Moncks Corner Building Permit Guide

How the Town of Moncks Corner issues building permits: CommunityCore access, the fee schedule, wind and seismic plan rules, and next-day inspections.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Mount Pleasant Building Permit Guide

Everything contractors, builders, and developers need to pull a Town of Mount Pleasant building permit — the two triggers that require a permit, the online paperless submittal process, how plan review queuing actually works, and the town's firm position on temporary certificates of occupancy.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Myrtle Beach Building Permit Guide

How Myrtle Beach Construction Services issues building and trade permits, the City's flood elevation rules and how to book inspections.

7 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Newberry Building Permit Guide

How the City of Newberry issues building and trade permits: what needs one, the 2026 fees, historic-district rules and how inspections work.

7 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Newberry County Building Permit Guide

How the Newberry County Building Department permits the unincorporated county: zoning first, the fee table, homeowner rules and inspections.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

North Augusta Building Permit Guide

How North Augusta Building Standards issues permits: who can apply, the filing steps, the fee tables for building and trades, and inspections.

8 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

North Charleston Building Permit Guide

Everything contractors, builders, and developers need to pull a City of North Charleston building permit — how a city spanning three counties works, the One Stop Shop, the online-only inspection scheduling, the permit issuance window, and floodplain management.

14 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Oconee County Building Permit Guide

Everything contractors, builders, and developers need to pull an Oconee County building permit — the four municipalities the county serves by contract, the 5,000 square foot plan review threshold for single-family construction, and the three things the Building Codes Division explicitly does not do.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Orangeburg Building Permit Guide

How building permits work inside Orangeburg city limits: the Building Inspection Division, the October 2026 fee schedule, plan sets, owner-builder rules and 24-hour inspection notice.

11 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Orangeburg County Building Permit Guide

Everything contractors, builders, and developers need to pull an Orangeburg County building permit — the tiny house compliance letter for structures of 400 square feet or less, the wastewater disposal system verification form, the notification letter some towns require first, and the county's published gas piping test requirements.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Pickens County Building Permit Guide

Everything contractors, builders, and developers need to pull a Pickens County building permit — the EnerGov Citizen Self Service portal, the 4:30pm permit issuance cut-off that is earlier than the office closing time, and the department's published commitment to inspect within 24 hours of request.

14 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Port Royal Building Permit Guide

How to get a building permit inside the Town of Port Royal: the 2026 permit packages, the Ordinance 2015-20 fees, Beaufort County impact fees, plan sets and inspection calls.

11 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Richland County Building Permit Guide

Everything contractors, builders, and developers need to pull a Richland County building permit — the Development Services centre on Hampton Street, the round-the-clock One-Call Response Center, the municipalities that permit their own work, and the state approvals that gate close-out.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Rock Hill Building Permit Guide

Everything contractors, builders, and developers need to pull a City of Rock Hill building permit — the rental registration and pre-occupancy inspection requirement, the interactive permit activity map, the boards whose calendars can govern a project, and the county position outside the city.

14 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Saluda County Building Permit Guide

Who issues building permits in Saluda County and its towns, the 2018 valuation fee scale, required documents, Lake Murray and floodplain rules, and inspection booking.

11 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Simpsonville Building Permit Guide

How to get a building permit inside Simpsonville city limits: the Evolve and Project portals, the City fee schedule, business licence rules, REWA impact fees and inspections.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Spartanburg Building Permit Guide

How building permits work inside the City of Spartanburg: online Form Center applications, GoPost commercial plan review, the 2023 fee schedule, trade fees and inspection rules.

10 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Spartanburg County Building Permit Guide

Everything contractors, builders, and developers need to pull a Spartanburg County building permit — the EnerGov Citizen Self Service portal, concurrent review across planning, engineering and building codes, the 6:30am inspection request deadline, and why quoting the wrong permit number stalls an inspection.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Summerville Building Permit Guide

Everything contractors, builders, and developers need to pull a Town of Summerville building permit — how a town spanning three counties actually works for permitting, the six-month utility shut-off rule that surprises renovators, the Design Review Board's reach over commercial exterior painting, and what genuinely needs no permit.

15 min readAugust 2026
Read Guide
Municipal GuideSouth Carolina

Sumter Building Permit Guide

Everything contractors, builders, and developers need to get a building permit in Sumter — what requires a permit, how fees work, the consolidated City/County Building Department, trade permits, and inspections.

9 min readJune 2026
Read Guide
Municipal GuideSouth Carolina

Sumter County Building Permit Guide

Who permits unincorporated Sumter County, Mayesville and Pinewood, how the City-County fee calculator works, owner-builder and farm structure rules, and how inspections are booked.

10 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Tega Cay Building Permit Guide

How to get a building permit in Tega Cay: the City's Evolve portal, the July 2026 fee and impact fee schedule, zoning and land disturbance permits, trees, retaining walls and the 2027 code change.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Union County Building Permit Guide

Who issues building permits in Union County and its towns, the County fee ordinance, residential and commercial submittals, the 15-step inspection sequence and mobile home rules.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

West Columbia Building Permit Guide

How to get a building permit inside West Columbia: the EnerGov self-service portal, zoning compliance and site plans, the City fee schedule, trade permits by subcontractors and inspections.

10 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

Williamsburg County Building Permit Guide

Who permits unincorporated Williamsburg County and its towns, the County fee schedule, plan requirements, flood and manufactured home rules, and how inspections are booked.

9 min readOctober 2026
Read Guide
Municipal GuideSouth Carolina

York County Building Permit Guide

Everything contractors, builders, and developers need to pull a York County building permit — the two towns the county permits directly, the school district impact fee that catches new-home budgets, the absence of a county business licence requirement, and the online apply-pay-schedule route.

15 min readAugust 2026
Read Guide

How building permits work in South Carolina

These rules apply across South Carolina. Each local guide above covers what is specific to that city or county: its building department and contacts, permit types, fees and inspections.

The South Carolina Building Codes and the 2027 changeover

The enforced code is the South Carolina Building Codes — the International Codes as adopted with South Carolina modifications by the South Carolina Building Codes Council under S.C. Code Ann. § 6-9-50, then administered and enforced locally. South Carolina is mid-changeover. The codes in force today are the 2021 South Carolina Building Codes, effective 1 January 2023. On 26 August 2025 the Building Codes Council adopted the next cycle — the 2024 editions of the International Building, Residential, Fire, Plumbing, Mechanical and Fuel Gas Codes, together with the 2023 National Electrical Code — and set the implementation date for every municipality and county as 1 January 2027. Design to the 2021 codes for a permit applied for now. For a project that will be filed close to 1 January 2027, ask the building department whether it applies the code in force on the application date or the issue date. The energy code does not change: it stays the 2009 International Energy Conservation Code, which is set by statute (S.C. Code Ann. § 6-10-30).

Every county and municipality must enforce the building, residential, fire, plumbing, mechanical, fuel gas, electrical and energy codes (S.C. Code Ann. § 6-9-10), and may change them only with the Council’s approval. The property maintenance, existing building and swimming pool codes are different: they apply only where a county or city has adopted them by ordinance (§ 6-9-60).

Contractor licensing: two boards

🧢 South Carolina licenses through two separate boards, both inside the Department of Labor, Licensing and Regulation. The Contractor's Licensing Board covers general and mechanical construction under Title 40, Chapter 11: a licence is required once the total cost of construction is greater than $10,000 (S.C. Code Ann. § 40-11-30). That figure rose from $5,000 under H.4115 (2023 Act 69), effective 19 May 2023. The Residential Builders Commission covers residential builders, residential specialty contractors and home inspectors under Title 40, Chapter 59, and its thresholds did not change: $5,000 for residential building and $500 for residential specialty work. The licence must exist before the bid, not before the work. An awarding authority, owner, contractor or agent may not consider a bid, sign a contract, or let work begin unless the contractor already holds the required licence — and a bid submitted without one may not be reconsidered even if the contractor is licensed later. A South Carolina commercial licence is not open-ended. Each licensee sits in one of five groups, and the group caps the value of a single bid or job. Group placement is set by working capital or net worth, or by a surety bond in the same amount. A Group 2 general contractor cannot take a $500,000 job, and the bid limits differ sharply between the general and mechanical tracks — an unlimited mechanical contractor and an unlimited general contractor are not the same credential.

On homes, the trades usually work under Residential Builders Commission licences: residential electricians, plumbers and heating and air-conditioning installers need one for jobs over $500 (S.C. Code Ann. § 40-59-20), and a residential builder licensed by examination may also do that work. A Contractor’s Licensing Board mechanical licence with the matching subclassification (Electrical, Plumbing, Air Conditioning or Packaged Equipment) is the commercial route, required once a job is over $10,000. The Board’s Heating subclassification covers hot-water and steam systems and Refrigeration covers food and process systems, so neither is the home HVAC licence. Residential pool work over $10,000 needs a Swimming Pools subclassification or a Residential Builder licence.

An owner may build a home for their own or their family’s use without a licence, but not to sell or rent: a sale or rental within two years of completion is treated as evidence that it was built for sale or rent (S.C. Code Ann. § 40-59-260). The owner must sign the permit application in person and file an owner-built notice with the register of deeds; some cities and counties add their own disclosure forms.

Solar: licensing and interconnection

Solar is reviewed on two tracks at once across South Carolina: the electrical side (conductors, overcurrent protection, rapid shutdown, labelling, and the service or supply-side connection, against the adopted National Electrical Code) and the structural side (attachment detail, rail spacing, and whether the existing framing carries the added dead load).

Licensing for solar depends on the kind of work. On commercial work, South Carolina places solar panel installation in the general contractor Miscellaneous Metals subclassification; roof mounting is limited to general contractors holding Roofing or Building, wiring and connections to mechanical contractors holding Electrical, and structural upgrading of the roof to Building or Structural Framing (S.C. Code Ann. § 40-11-410). On homes, the Residential Builders Commission registers solar panel installers, and the wiring goes to a licensed residential electrician (§ 40-59-20). Confirm the route with LLR before filing.

Utility interconnection runs on its own clock alongside the permit. Dominion Energy South Carolina, Duke Energy Carolinas and Duke Energy Progress follow the Public Service Commission’s South Carolina Generator Interconnection Procedures; Santee Cooper, the electric cooperatives and municipal utilities such as Rock Hill, Greer CPW and Orangeburg DPU run their own. Permission to operate is not something the building department controls, so plan for the two tracks to finish at different times.

Roofing permits

A roof covering replacement needs a permit across most of South Carolina. The permit is usually quick, but it is not optional, and the inspection that matters happens before the covering goes on rather than after.

South Carolina has no statewide product-approval system, so there is no approval number to cite on the application. The assembly has to comply with the adopted code and the manufacturer's listed installation instructions, and that pairing is what the inspector checks — which makes the manufacturer's instructions a document worth having on site.

Sequencing is where reroofs go wrong. The deck and dry-in condition has to be visible when the inspector arrives, so covering it first means opening it back up. Where a previous layer has been torn off, expect attention to deck fastening and to any sheathing replaced along the eaves.

Sources