Bamberg County, South Carolina Building Permit Guide

Bamberg County’s building inspector and the Assessor’s Office in the Courthouse Annex on North Street handle county building permits, from plan review to the electrical release for a new home.

Authority: Bamberg County Building InspectionCode: 2021 South Carolina Building CodesPhone: 803-245-5191
County authority
Bamberg County Building Inspection
Plan review
7 days residential, 14 commercial
Permit contact
803-245-5191
2025 population
12,796

In Bamberg County, building permits are issued through the county’s Building & Planning department in the Courthouse Annex, 1234 North Street (803-245-5191), with plans reviewed by the county building inspector. Fees follow the value of the work, from $35 for the first $1,000, plus a plan review fee of half the permit fee and a $10 administrative fee; residential plans take about 7 days.

What needs a permit in Bamberg County?

The county’s building code ordinance requires permits for buildings, structures, alterations and repairs, fire protection systems, signs, pools and fences. Its permit application lists the work types the office issues:

Buildings

  • Single-family and multi-family houses, apartments and dorms
  • Porches, decks, carports, garages, sheds and storage buildings
  • Churches, commercial, institutional, government and manufacturing buildings
  • Agricultural buildings and poultry farms
  • Swimming pools, fences and signs
  • Roof- and pedestal-mounted solar panels
  • Cell towers and mobile homes

Systems and other work

  • Electrical work, reconnects and upgrades
  • Plumbing, gas, and heating and air
  • Generators
  • Metal or shingle roofing, siding and windows
  • Foundations
  • Demolition and moving a building

The county FAQ says jobs under $1,000 generally need no permit, because minor non-structural repairs are exempt.

Who issues building permits in Bamberg County?

The county’s Building & Planning department enforces the adopted codes, and its Inspector/Zoning Official serves as the building official under the county’s building codes ordinance. In practice, plans and permit paperwork go to the Assessor’s Office in the Courthouse Annex, the building inspector reviews the plans, and the inspector carries out the inspections. Zoning, land development and floodplain rules are handled by the same department’s planning and zoning staff.

Short on time to read all of this?

Get a free quote →
Bamberg County Building Inspection
DetailInformation
OfficeCourthouse Annex (Isaiah Odom Building), 1234 North Street, Bamberg, SC 29003
Mailing addressPO Box 149, Bamberg, SC 29003
Phone803-245-5191 (fax 803-245-1219)
Inspections803-245-3111
Who permits each town in Bamberg County
PlaceBuilding permits
Unincorporated Bamberg CountyBamberg County Building & Planning
City of Bamberg (City Hall 803-245-5128) and City of Denmark (City Hall 803-793-3734)The cities’ websites carry no permit information and the county does not publish an agreement; ask the city hall which office permits your address
Ehrhardt, Govan, OlarNo official source found; ask the town hall or the county office

One county document does touch on town limits: its mobile home checklist asks for a zoning permit when the home will sit inside city limits.

Bamberg County permit fees

The county’s 2025–2026 fee schedule prices building and trade permits on the value of construction, using current ICC Building Valuation Data and the project’s square footage; trade permits are valued on parts and labor. Fees are due when you apply.

Not sure this scope needs a permit?

Get a free quote →
Bamberg County fees, 2025–2026 budget
ProjectFee
Work valued at $1,000 or lessNo fee, or $30 if an inspection is needed
$1,001 to $50,000$35 for the first $1,000 + $5 per additional $1,000 or fraction
$50,001 to $100,000$280 for the first $50,000 + $4 per additional $1,000
$100,001 to $500,000$480 for the first $100,000 + $3 per additional $1,000
$500,001 and up$1,695 for the first $500,000 + $2 per additional $1,000
Plan reviewHalf the permit fee
Administrative fee$10 on every permit
Mobile home permit$65 single-wide / $90 double-wide
Moving a manufactured home / other building$40 / $100
Demolition / swimming pool$30 / $40
Electric or gas meter inspection$35 each, $45 for both
Re-inspection$30
Stop work order$200 penalty
Wireless tower / co-location$3,000 / $1,500

Example: a house valued at $200,000 pays $480 + (100 × $3) = $780 for the permit, $390 for plan review and the $10 administrative fee, a total of $1,180. Starting work before the permit is issued doubles the fee. The county’s older mobile home checklist still shows $60 and $85 for power permits; the 2025–2026 schedule’s $65 and $90 are the current figures.

Rather talk it over?

Call 1-855-478-4290 →

Electrical, plumbing and mechanical work

A general contractor cannot do the electrical, plumbing or mechanical work on a job; the county FAQ says each trade has its own qualification requirements. Trade permits use the same value-based table, counting parts and labor. Under the building codes ordinance, the county will not issue a permit for work that needs a state licence unless the applicant shows the licence. Solar permits need a roof structural analysis, wind and seismic design, a panel layout with clearances, fastening details, an electrical schematic, and separate values for the building and electrical permits.

How to get a new-house permit in Bamberg County

1. Septic or sewer first

Take the deed or plat and tax map number to the Health Department for a septic permit, even where a tank already exists, or get a letter from the town confirming water and sewer service.

2. E-911 address

Get an address form for the new home from the 911 office.

3. Plan review

Bring the contractor’s licence number and two complete sets of foundation, floor, typical wall section and electrical plans to the Assessor’s Office. Allow 7 days for a residential review and 14 for a commercial one; the building inspector calls when the plans pass.

4. Buy the permit

Return with the signed septic application and the total cost of the job, and pay the permit fees.

5. Power company

Take the permits to your electric company.

6. Inspections

Call the building inspector at 803-245-3111 for each inspection.

Rather not deal with the Bamberg County building department?

Get a free quote →

Inspections in Bamberg County

Call the Building Department at 803-245-3111; the county says inspections usually take place within 24 hours. A repeat visit costs $30. For a mobile home the inspector checks electrical, anchorage and plumbing, then sends the electrical release to the power company so service can be connected. A demolition must be finished within 45 days of the permit, and the inspector makes a final visit once the site is cleaned up.

Bamberg County requirements to know

Owner-builders: the county lets you act as your own contractor when you or immediate family members do the work and you will live in the home for 2 years after completion. The application includes an owner’s statement accepting the risks and liabilities of acting as general contractor.

Mobile homes: bring a title or bill of sale, the septic final approval or a town water and sewer letter, the 911 address form, a Treasurer’s clearance sheet for back taxes, and the licensed installer’s licence number. A used home bought from an individual needs an assessor’s moving permit and a paid tax receipt, and homes older than 1976 are not accepted.

Demolition: show that electric, gas, water and sewer are disconnected; commercial buildings also need the asbestos study and abatement records.

Floodplain and zoning: the county enforces Flood Prevention Ordinance #19-09-01, the Manufactured Home Ordinance #14-9-07, its Zoning Ordinance and Land Development Regulations; a Board of Zoning Appeals application costs $150.

South Carolina building code

Every South Carolina county and municipality enforces the 2021 South Carolina Building Codes, in force since 1 January 2023; the 2024 editions take effect statewide on 1 January 2027, and the energy code stays the 2009 International Energy Conservation Code. South Carolina building codes

Want this handled start to finish?

Get a free quote →

Bamberg County official resources

Bamberg County permit FAQ

How much is a building permit in Bamberg County?

It depends on the value of the work: $35 for the first $1,000 and $5 for each additional $1,000 up to $50,000, then lower rates per $1,000. Plan review adds half the permit fee and every permit carries a $10 administrative fee, so a $200,000 house pays $1,180.

Inspections are where schedules slip.

Get a free quote →

Where do I apply for a building permit in Bamberg County?

At the Courthouse Annex, 1234 North Street, Bamberg. The county’s steps sheet sends plans and permit paperwork to the Assessor’s Office there; call 803-245-5191 with questions.

How long does plan review take?

About 7 days for a house and 14 days for a commercial building. The building inspector calls when the plans pass.

Can I build my own house in Bamberg County?

Yes, if you or immediate family members do the work and you live in the home for 2 years after it is finished.

Do small repairs need a permit?

Generally not if the job is under $1,000 and non-structural.

How fast are inspections?

Usually within 24 hours of your call to 803-245-3111.

Simplify Bamberg County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in South Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Bamberg County sooner?

Let Alliance prepare, file, and track your Bamberg County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Bamberg County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.