Skip to main content
Municipal GuideSouth CarolinaBeaufort · Beaufort County

Beaufort, South Carolina Building Permit Guide

The City of Beaufort administers municipal building permits and inspections through Building Codes. Applications may be submitted in person, by mail or by email, with online payment available for permit and inspection fees.

Authority: City of Beaufort Building CodesCode: 2021 South Carolina Building CodesPhone: 843-525-7049
Authority
City of Beaufort Building Codes843-525-7049
Filing
permits@cityofbeaufort.orgEmail, mail or in person
Plan checking
Half the base feePaid at submittal
Inspections
$0.10 per sq ftNew construction

Inside the City of Beaufort, the Building Codes Department at City Hall, 1911 Boundary Street, issues building and trade permits; applications go in by email to permits@cityofbeaufort.org, by mail or in person, and a permit technician checks them and quotes the fees. A $300,000 house pays a $1,100 base fee, $550 for plan checking and $0.10 per square foot for inspections, before impact fees.

What needs a permit in Beaufort?

The City sorts work into four tiers, and the tier decides which application you use:

Projects over $50,000

  • Usually 5 or more subcontractors
  • Accessory dwelling units
  • Major renovations
  • New homes and commercial buildings
  • Significant upfits

Projects under $50,000

  • Fewer than 5 subcontractors, still reviewed for code
  • Electrical, mechanical and plumbing work
  • Structural renovations and new walls
  • Re-roofs and new awnings
  • Residential sheds over 200 sq ft; commercial sheds over 120 sq ft
  • Window or door replacement, which must meet the hurricane rules (send photos of the old windows and specs of the new)

Minor project permit

  • Fences and exterior painting
  • Smaller sheds
  • Rot repair and awning re-covers
  • Partial or full demolition, or moving a structure
  • Site work that adds impervious surface or changes grading
  • Banners and temporary uses such as food trucks

No permit

  • Interior painting and finish work
  • Cabinets with no plumbing changes
  • Residential flooring and wallpaper
  • Landscaping that adds no impervious surface or curb cut

Even for no-permit work, the City makes the owner or contractor responsible for confirming the exemption with Building Codes.

Short on time to read all of this?

Get a free quote →

Who issues building permits in Beaufort?

The City’s Building Codes Department, part of Community Development, handles permits inside city limits. It coordinates review by the Building Official, Planning & Zoning, drainage and grading, and the Fire Marshal for commercial work. Bruce Skipper is the Chief Building Official. Its permits cover only land inside the city limits; unincorporated parcels nearby fall under Beaufort County.

City of Beaufort Building Codes
DetailInformation
Office1911 Boundary Street, Beaufort, SC 29902 (City Hall, 843-525-7070)
Permit technician843-525-7049, permits@cityofbeaufort.org
Development Review Coordinator843-379-7051 (plans by email, pre-construction meetings)
Chief Building OfficialBruce Skipper, 843-525-7006
Inspector843-379-7516

Beaufort permit applications and forms

Pick the application for your tier: the Project Permit Application Packet for jobs over $50,000 (application, checklist, major subcontractors list, licence permission sheet and the prime contractor’s statement of understanding), the application with small subcontractors list for smaller jobs, or the Minor Project Permit. Site work alone has its own Site Work Project Permit Application and closeout checklists, and demolition has a separate packet.

Other City forms you may need: the Zoning Permit (Safety Application), City Encroachment Permit for driveways onto City streets, Tree Removal Application, Special Inspector Application, Address Request Form and a Revision Cover Sheet that must accompany any revised plans.

Owner-builders: a homeowner who lives in the home may pull the permit after recording a Disclosure Statement with the Beaufort County Register of Deeds and signing the City’s Owner Builder Agreement. The exemption does not cover homes for rent or sale; on commercial projects an owner may do only non-structural, non-mechanical work.

Not sure this scope needs a permit?

Get a free quote →

Beaufort building permit fees

Fees come from the City’s Development Review Codes Fee Schedule (revised May 14, 2024). The base fee is paid at submittal, and the plan checking fee is half of it.

City of Beaufort building fees
ProjectFee
Valuation over $500 to $50,000$35 for the first $500 + $5.30 per additional $1,000 or fraction
Over $50,000 to $100,000$300 for the first $50,000 + $4 per additional $1,000
Over $100,000 to $500,000$500 for the first $100,000 + $3 per additional $1,000
Over $500,000$1,700 for the first $500,000 + $2 per additional $1,000
Plan checkingHalf the base fee
New construction or renovation inspections$0.10 per sq ft
Individual inspection (not new construction)$100 each
Re-inspection (wrong address, corrections not made, work not ready)$100; $150 for multifamily and commercial
Swimming pool$235 single-family, $265 multifamily or commercial ($200 refunded after approval)
Demolition$100 single-family; $200 commercial or multifamily
Moving a building$150
Permanent sign$1 per sq ft + $75 inspection

Rather talk it over?

Call 1-855-478-4290 →

Example: a $300,000 house of 2,300 sq ft pays $500 + (200 × $3) = $1,100 base fee, $550 for plan checking and $230 for inspections. New homes also pay impact fees, which the City collects for Beaufort County as well as its own: on a 2,300 sq ft home the City quotes $466 for libraries, $1,006 for parks and $3,135 for roads ($4,607), plus a $305.43 City fire impact fee. Owners building their own home pay them too. Permit and inspection fees can be paid on the City’s online payment portal, by mail or in person.

⚠️ Work without a permit triples the base fee. The Building Official may waive the penalty for a first offense.

Electrical, plumbing, gas and mechanical work

Trade work is permitted through Building Codes on the same applications, and every subcontractor goes on the subcontractor list with the contract amount. Electrical, plumbing, gas and mechanical contractors need a City of Beaufort business license plus the right state licence; the City’s FAQ notes that any gas work, even pressurizing a gas line, needs a mechanical plumber or HVAC licence. Residential plans must include plumbing, electrical, HVAC and gas sheets, and commercial sprinkler systems go to the State Fire Marshal’s office.

How to apply for a Beaufort building permit

1. Design review first

If the project needs Historic Review Board, Design Review Board or staff design review, finish it before you apply for the project permit.

2. Prepare the plan sets

Email a digital set, including the drainage and grading plan, to the Development Review Coordinator, and supply signed and stamped 24 x 36 paper sets: 2 for residential, 3 for commercial.

3. Add the supporting documents

Site plan with finished floor elevation, setbacks and impervious percentage; tree survey; flood zone information; REScheck and Manual J and S for homes, or a soil report and COMcheck for commercial work.

4. Submit and pay

Send the application and subcontractor list to permits@cityofbeaufort.org, by mail or in person. The permit technician reviews it for completeness and confirms the fees.

5. Clear the remaining approvals

Driveways and curb cuts need a SCDOT or City encroachment permit, subcontractors need City business licences, and BJWSA handles water and sewer.

6. Install site protection

Put in tree protection, silt fence and the construction entrance, then email the coordinator before work starts.

Rather not deal with the building department?

Get a free quote →

Inspections and closeout in Beaufort

City inspectors carry out the building inspections; new construction pays $0.10 per square foot for them up front. Re-inspection fees for a wrong address, uncorrected work or work not ready must be paid before the inspector returns. A permit is good for 6 months from issue, and an extension can be granted when the owner or contractor gives a reason.

Before requesting permanent utility service or the final inspection for the Certificate of Occupancy, the prime contractor on a larger job must turn in an updated subcontractor list with all fees paid. Commercial projects follow the City’s Closeout Checklist for Commercial Projects, and site-work permits have their own closeout checklists.

Beaufort details that shape a project

Historic district and design review: exterior work may go to the Historic Review Board or Design Review Board ($100 for single-family, $250 for multifamily and commercial). Applications made after the work is done pay triple. Single-family homes outside the historic district are exempt from staff design review fees.

Trees: on single-family lots, removing a specimen or landmark tree needs a Tree Removal Application and costs $10 per tree; on commercial lots the $10 fee applies to every tree 8 inches DBH or larger, and mitigation may be required. Specimen and landmark removal requests need a certified arborist report, and the City’s arborist inspects the tree.

Flood zones: plans must state the flood zone and finished floor elevations.

Want this handled start to finish?

Get a free quote →

Commercial projects: expect a possible pre-construction meeting (843-379-7051), an asbestos survey for demolitions and renovations, and state environmental approvals where they apply.

South Carolina building code

Every South Carolina county and municipality enforces the 2021 South Carolina Building Codes, in force since 1 January 2023; the 2024 editions take effect statewide on 1 January 2027, and the energy code stays the 2009 International Energy Conservation Code. South Carolina building codes

Beaufort official resources

Beaufort building permit FAQ

Who issues building permits in the City of Beaufort?

The City’s Building Codes Department at 1911 Boundary Street. Email applications to permits@cityofbeaufort.org or call the permit technician at 843-525-7049.

Inspections are where schedules slip.

Get a free quote →

How much is a building permit in Beaufort?

The base fee runs from $35 for the first $500 of value up to $500 plus $3 per $1,000 for jobs between $100,000 and $500,000. Plan checking adds half the base fee, and new construction pays $0.10 per square foot for inspections.

What impact fees apply to a new home in Beaufort?

For a 2,300 sq ft home the City quotes $4,607 in county library, parks and road impact fees plus a $305.43 City fire impact fee.

Do I need a permit for a shed or fence in Beaufort?

Fences and small sheds use the Minor Project Permit. Residential sheds over 200 sq ft, and commercial sheds over 120 sq ft, need a building permit with code review.

Can a homeowner pull a permit in Beaufort?

Yes, for a home you own and live in, after recording a Disclosure Statement with the Register of Deeds. Rental and for-sale homes need a licensed contractor.

How long is a Beaufort permit valid?

6 months from the date of issue; the City can grant an extension if you give a reason.

Simplify Beaufort permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in South Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Beaufort sooner?

Let Alliance prepare, file, and track your Beaufort permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Beaufort permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.