Chesterfield County, South Carolina Building Permit Guide

Chesterfield County Building Codes on Mill Street in Chesterfield issues county building and trade permits through its Evolve online portal; the Town of Cheraw runs its own building department.

Authority: Chesterfield County Building CodesCode: 2021 South Carolina Building CodesPhone: 843-623-9615
County authority
Chesterfield County Building Codes
Filing
Evolve online account
Permit contact
843-623-9615
2025 population
44,740

Chesterfield County Building Codes (178 Mill Street, Chesterfield, 843-623-9615) issues building, electrical, plumbing, mechanical and gas permits, and applicants must open an account on the county’s Evolve portal to apply. Fees follow the schedule re-adopted with the 2026–27 county budget: a 2,000 sq ft house valued at the county’s $120 per sq ft rate pays $920 plus a $460 plan review fee.

What requires a permit in Chesterfield County?

The county follows the residential code rule: building, moving, demolishing or changing the use of a structure, or installing or altering electrical, gas, mechanical or plumbing systems, needs a permit first. Work valued at $200 or less needs none unless an inspection is required. The county lists these exemptions:

Permit required

  • New houses, additions and repairs over $200
  • Electrical, plumbing, mechanical and gas work
  • Mobile home set-up, new or moved
  • Moving or demolishing a building
  • Agricultural buildings

No permit

  • Fences under 7 ft
  • Detached accessory buildings up to 200 sq ft
  • Retaining walls up to 4 ft
  • Sidewalks and driveways
  • Painting, tiling, carpet, cabinets and countertops
  • Decks up to 200 sq ft and no more than 30 in above grade
  • Swapping a breaker in the same location, or minor repairs

Emergency equipment repairs can go ahead, but the permit application must reach the office on the next working day.

Who issues building permits in Chesterfield County?

Chesterfield County Building Codes, led by Director Derrick Outen, issues permits, reviews plans and inspects construction under the county’s building codes.

Short on time to read all of this?

Get a free quote →
Chesterfield County Building Codes
DetailInformation
Office178 Mill Street, Chesterfield, SC 29709
Phone843-623-9615 (fax 843-623-9637)
Emailbuildingcodes@chesterfieldcountysc.com
HoursMonday to Friday, 8:30 a.m. to 5:00 p.m.
OnlineEvolve public portal (account required)
Who permits each town in Chesterfield County
PlaceBuilding permits
Unincorporated Chesterfield CountyChesterfield County Building Codes
Town of CherawThe Town’s own Building Department (843-537-7283), with Town building, trade, fence and solar applications
Town of ChesterfieldSAFEbuilt handles the Town’s building permits: get a Town business license first, file the Town’s application with the Town Clerk and email plans and plats to SAFEbuilt; Town Hall 843-623-2131, SAFEbuilt 864-741-7393
McBeeChesterfield County Building Codes, under the Town’s own page; a mobile home placed in town needs McBee Town Hall approval (843-335-8474) before the county permit
PagelandThe Town publishes its own building permit application (building, electrical, plumbing, mechanical and demolition) and zoning ordinance; Town Hall 843-672-7292
Jefferson, Mount Croghan, Patrick, RubyThe published sources do not say; ask the town hall or the county office before applying

In Cheraw, a building permit is needed for any work over $500 in materials and labor or any structural work, contractors need a Town business license, and historic district work goes to the Town’s Board of Architectural Review.

Chesterfield County permit fees

The fees below were set in the department’s July 1, 2021 schedule and carried unchanged into Schedules B and B-2 of the County’s FY 2026–27 budget ordinance (Ordinance 26-27-01). Valuation is the greater of the contract price or the square footage multiplied by the Schedule B cost table, which sets one- and two-family homes (R-3) at $120 per sq ft.

Not sure this scope needs a permit?

Get a free quote →
Chesterfield County permit fees (FY 2026–27)
ProjectFee
Building or repair, $0–$200No permit unless an inspection is needed
$201–$1,000$45
$1,000–$50,000$45 for the first $1,000 + $5 per additional $1,000 or fraction
$50,001–$100,000$300 for the first $50,000 + $4 per additional $1,000
$100,001–$500,000$500 for the first $100,000 + $3 per additional $1,000
$500,001 and up$1,700 for the first $500,000 + $2 per additional $1,000
Plan reviewHalf the building permit fee, due when plans are submitted
Electrical, plumbing, mechanical or gas$45 + $10 per $1,000 of valuation
Mobile home set-up, new or moved$120 for the first $5,000 + $5 per $5,000, up to $150,000
Moving a building$100
Demolition$50 residential / $100 commercial / $35 mobile home
Agricultural building$100 flat fee without electrical; with electrical, mechanical or plumbing it is valued at $10 per sq ft and priced on the building fee table above

Example: a 2,000 sq ft house valued at $120 per sq ft ($240,000) pays $500 + (140 × $3) = $920, plus $460 for plan review, before trade permits. The schedule also tells applicants to add $10 (residential) or $20 (commercial) to reach the minimum permit fee, and work started without a permit pays double.

Rather talk it over?

Call 1-855-478-4290 →

Electrical, plumbing, mechanical and gas permits

Each trade takes its own county permit at $45 plus $10 per $1,000 of the trade work’s value. The county posts a Contractor Verification Form and service pole requirements, and its inspection checklist spells out the electrical items an inspector looks for: at least two grounding electrodes 6 ft apart, two 20-amp kitchen circuits plus laundry and bathroom circuits in #12 wire, GFCI protection in wet areas, AFCI protection on 15- and 20-amp branch circuits, and tamper-resistant receptacles, with the panel labeled and its cover off.

How to apply in Chesterfield County

1. Check the town

Inside Cheraw, apply to the Town Building Department, and inside Pageland use the Town’s permit application. In the Town of Chesterfield, file the Town’s application for SAFEbuilt; McBee is permitted by the County once Town Hall approves any mobile home. For the other towns, ask the town hall first.

2. Check setbacks

Houses and mobile homes sit 30 ft back from local roads (40 ft collector, 50 ft arterial), 10 ft from side lines and 25 ft from the rear.

3. Open an Evolve account

Register on the county’s Evolve public portal; the county now requires it to apply.

4. Submit and pay plan review

Upload the application and plans and pay the plan review fee, half the building permit fee, when the plans go in.

5. Owner-builders

Homeowners acting as their own contractor complete the county’s Disclosure Statement.

6. Book inspections

Give at least 24 hours’ notice by phone or email.

Inspections in Chesterfield County

Call 843-623-9615 or email buildingcodes@chesterfieldcountysc.com at least 24 hours ahead; with so many jobs, the office cannot set appointment times. The New Build Inspection Checklist runs through each stage:

Rather not deal with the Chesterfield County building department?

Get a free quote →
  • Saw service: weather head in the top 2 ft of the pole, drip loop at least 10 ft up, meter base top at 6 ft, a GFCI outlet and an 8 ft ground rod.
  • Footing: address posted, setbacks verifiable, approved plans and permit on site, footings at least 12 in into undisturbed soil.
  • Underground plumbing and slab: slab at least 3.5 in thick; a termite treatment letter is needed before the final.
  • Open floor, foundation and framing.
  • Insulation: R-19 floors, R-13 walls, R-30 ceilings.
  • Electrical safety and final.

Inspectors do not check cosmetic items or make a punch list. Once the final passes, the Certificate of Occupancy is issued the next business day, and the building may not be occupied before then.

Chesterfield County details to know

Setbacks: accessory buildings need 5 ft side and rear setbacks, and farm buildings housing livestock, swine or fowl must stay at least 50 ft from the nearest residential property line. Townhouses, patio homes and multi-family projects have their own setbacks on the county sheet.

Mobile homes: the county publishes set-up requirements and service pole requirements, and set-up permits are priced on the home’s value.

Septic: the county site points applicants to perk test contact information for lots without sewer.

South Carolina building code

Every South Carolina county and municipality enforces the 2021 South Carolina Building Codes, in force since 1 January 2023; the 2024 editions take effect statewide on 1 January 2027, and the energy code stays the 2009 International Energy Conservation Code. South Carolina building codes

Want this handled start to finish?

Get a free quote →

Chesterfield County official resources

Inspections are where schedules slip.

Get a free quote →

Chesterfield County permit FAQ

How much is a building permit in Chesterfield County?

$45 for work between $201 and $1,000, rising to $500 plus $3 per $1,000 for projects between $100,000 and $500,000. Plan review adds half the permit fee, so a 2,000 sq ft house valued at $240,000 pays $920 plus $460.

Do I need a permit for a shed, fence or deck?

Not for a detached building up to 200 sq ft, a fence under 7 ft, or a deck up to 200 sq ft that is no more than 30 in above grade.

Who issues building permits in Cheraw?

The Town of Cheraw’s own Building Department (843-537-7283), which requires a permit for work over $500 or any structural work.

How do I apply for a county permit?

Create an account on the county’s Evolve public portal and apply there; call 843-623-9615 with questions.

How much notice do inspections need?

At least 24 hours, by phone or email. The office cannot set appointment times.

When do I get my Certificate of Occupancy?

The next business day after the final inspection passes.

Simplify Chesterfield County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in South Carolina. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Chesterfield County sooner?

Let Alliance prepare, file, and track your Chesterfield County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Chesterfield County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.