Minnesota Building Permit Guides

85 building permit guides for Minnesota jurisdictions.

How building permits work in Minnesota

Municipal GuideMinnesota

Aitkin County Building Permit Guide

Aitkin County Environmental Services issues land use, shoreland and septic permits outside the six cities through GeoPermits; it checks setbacks on site but does not administer the State Building Code.

14 min readOctober 2026
Read Guide
County GuideMinnesota

Anoka County Building Permit Guide

Anoka County does not issue or inspect building permits; its cities do. Offices, portals, electrical routes and county road fees for Blaine, Coon Rapids, Andover and Fridley.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Apple Valley Building Permit Guide

Apple Valley can order your electricity disconnected over defective work — immediately where there is danger, and after 15 days where there is not.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Becker County Building Permit Guide

Becker County Planning and Zoning issues site, septic and land alteration permits outside the seven cities, online or at the Detroit Lakes courthouse; the county enforces zoning, not the State Building Code.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Beltrami County Building Permit Guide

Beltrami County Environmental Services issues building, septic and shoreland alteration permits in shoreland zones; Bemidji, several cities and townships run their own programs, and wiring goes to the state.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Benton County Building Permit Guide

Benton County Planning and Zoning issues land use, building and septic permits outside the cities, with contracted inspections; Watab Township and the orderly annexation areas follow their own routes.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Blaine Building Permit Guide

A Blaine permit can be finished, reviewed and approved and still not issue — because a regional body has not returned its determination.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Bloomington Building Permit Guide

You cannot list a Bloomington house for sale until the city has inspected it — the inspection comes before the listing, not before the closing.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Blue Earth County Building Permit Guide

Blue Earth County Property and Environmental Resources issues construction, septic, well, shoreland and feedlot permits in the townships it zones; the City of Mankato issues permits for Lime and Mankato townships.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Brooklyn Park Building Permit Guide

No permit issues in Brooklyn Park until the city has your insurance certificates — two of them, at limits fixed in the city code.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Brown County Building Permit Guide

Brown County Planning and Zoning in New Ulm issues zoning, septic, grading and wetland permits for the townships through its online portal; the cities permit their own projects, and the county’s pages describe no building-code inspections.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Burnsville Building Permit Guide

A Burnsville demolition is not finished when the building is gone — the site has to be filled, graded, drained and seeded.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Carlton County Building Permit Guide

Carlton County Zoning and Environmental Services issues zoning permits for all structures outside the self-zoning cities and Thomson Township, plus county-wide septic permits; it does not enforce the State Building Code.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Carver County Building Permit Guide

In rural Carver County the right to be issued a permit for a house is itself a finite thing — allocated, counted and sometimes transferable.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Cass County Building Permit Guide

Cass County Environmental Services in Walker issues land use, shoreland and septic permits for unincorporated land under the 2026 Land Use Ordinance; fees are by square foot, and cities handle their own permits.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Chippewa County Building Permit Guide

Chippewa County Land and Resource Management issues land use and septic permits in the unincorporated county; a new dwelling permit is $100 under the 2026 fee schedule.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Chisago County Building Permit Guide

Chisago County Environmental Services issues building permits in every township and eight cities and zoning, shoreland and septic permits in eight townships, online only; electrical permits come from the state.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Clay County Building Permit Guide

Clay County Planning and Zoning issues development (building) permits outside its 11 cities after a township officer signs; Environmental Health handles septic and the Highway Department road access.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Cottonwood County Building Permit Guide

Cottonwood County’s Environmental Office in Windom issues building setback permits, septic permits, conditional uses and variances for land outside the seven cities.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Crow Wing County Building Permit Guide

Crow Wing County Land Services issues land use, septic and shoreland alteration permits for unincorporated land through an online portal after an on-site setback review; the county has not adopted the building code.

13 min readOctober 2026
Read Guide
County GuideMinnesota

Dakota County Building Permit Guide

Dakota County cities and townships issue building permits; the county handles wells, some septic, shoreland and highways. Offices for Lakeville, Eagan, Burnsville and Apple Valley.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Dodge County Building Permit Guide

Dodge County Environmental Services issues zoning, septic and removal permits in the rural townships and does not administer the State Building Code; electrical permits come from the state.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Douglas County Building Permit Guide

Douglas County Land and Resource Management issues land use, shoreland and septic permits outside city limits and Alexandria Township; land near Alexandria also needs the city’s building permit.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Duluth Building Permit Guide

A pole barn in Duluth is not a simple building — it falls outside the prescriptive code and needs a Minnesota structural engineer’s stamp.

13 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Eagan Building Permit Guide

Eagan gives away a free permit for the projects that do not need one — and it is the one most likely to save you a dispute with a neighbour.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Eden Prairie Building Permit Guide

Start work in Eden Prairie before the permit is issued and the code allows the fee to be doubled — on top of the fines.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Edina Building Permit Guide

If the owner does not live in the house, Edina will only issue the mechanical and plumbing permits to a contractor licensed by the city itself.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Faribault County Building Permit Guide

Faribault County Planning and Zoning in Blue Earth issues building (zoning), septic and feedlot permits outside the cities; it does not enforce the building code.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Fillmore County Building Permit Guide

Fillmore County's Land Use Department in Preston issues land use, septic, access and feedlot permits in the townships on paper forms; it runs no county building-code review, and electrical work goes to the state.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Freeborn County Building Permit Guide

Freeborn County Environmental Services in Albert Lea issues building permits with plan review and inspections, plus land use, septic and feedlot permits; Albert Lea and the other cities handle their own.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Goodhue County Building Permit Guide

Goodhue County Land Use Management issues State Building Code permits in all 21 townships and inspects for six small cities; Red Wing, Lake City, Pine Island and Zumbrota run their own code offices.

13 min readOctober 2026
Read Guide
County GuideMinnesota

Hennepin County Building Permit Guide

Hennepin County’s 45 cities issue building permits; the county regulates most septic systems and county road work. Offices for Minneapolis, Bloomington and Brooklyn Park.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Houston County Building Permit Guide

Houston County Zoning & Planning in Caledonia issues zoning, septic and wetland permits for the townships through GeoPermits; the county does not enforce the building code, and state inspectors handle electrical work.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Hubbard County Building Permit Guide

Hubbard County Environmental Services issues shoreland land use permits and county-wide septic, E911 and sign permits from Park Rapids; nine townships zone for themselves and the county administers no building code.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Isanti County Building Permit Guide

The Isanti County Zoning Office issues building, septic and zoning permits outside the cities and Athens Township, under the State Building Code and a fee schedule effective January 1, 2026.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Itasca County Building Permit Guide

Itasca County Environmental Services in Grand Rapids issues zoning, septic and shoreland alteration permits outside the 16 cities; townships with zoning add their own permits, and a site plan can be sent by email.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Kanabec County Building Permit Guide

Kanabec County has no countywide zoning: Environmental Services permits shoreland building sites, septic systems, floodplain and wetland work, while townships and cities handle zoning elsewhere.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Kandiyohi County Building Permit Guide

Kandiyohi County Environmental Services issues building, land use and septic permits outside the cities and St. John’s Township under Ordinance No. 31; the state inspects electrical work.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Koochiching County Building Permit Guide

Koochiching County Environmental Services issues building/land use, septic and shoreland permits outside the six cities, filed and paid online; the 2026 schedule charges $200, or $275 combined with a septic permit.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Lake County Building Permit Guide

Lake County Planning & Zoning in Two Harbors issues land use, septic and wetland permits outside the three cities under Land Use Ordinance #12; a house permit is $200 and a new septic system $500.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Lakeville Building Permit Guide

Lakeville will close a roofing or siding permit on photographs — you email the pictures and the final inspection is scheduled without you.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Le Sueur County Building Permit Guide

Le Sueur County Environmental Services in Le Center issues zoning, septic and land alteration permits outside city limits; structures under 100 square feet are exempt, and the county’s pages describe no building-code inspections.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Lyon County Building Permit Guide

Lyon County Planning and Zoning in Marshall issues land use permits to erect, alter or move buildings outside the cities, plus septic, shoreland and feedlot approvals; fees are set by the County Board.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Maple Grove Building Permit Guide

On a Maple Grove re-siding job, printed photographs of the house wrap must be on site at the final inspection; on a re-roof, printed photographs of the ice and water protection.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Martin County Building Permit Guide

Martin County Planning and Zoning in Fairmont issues building (zoning), septic and feedlot permits for land outside the cities; the 2026 zoning permit fee is $150.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

McLeod County Building Permit Guide

McLeod County Environmental Services issues land use, septic and feedlot permits outside city limits, with townships sharing fees and signing permits, under the fee schedule adopted December 16, 2025.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Meeker County Building Permit Guide

Meeker County’s building official permits non-agricultural construction outside the cities, and Planning and Zoning issues land use, septic and shoreland permits from the Government Center in Litchfield.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Mille Lacs County Building Permit Guide

Mille Lacs County enforces the State Building Code in 15 townships: the Zoning Office takes every permit online, and Mid-MN Inspections inspects; cities and two townships run their own zoning.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Minneapolis Building Permit Guide

Let a Minneapolis permit expire on an empty building and the city can register it as vacant — at an annual fee north of $7,000.

13 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Minnetonka Building Permit Guide

In Minnetonka the fencing goes up before the permit comes out — erosion control and tree protection must be installed and inspected first.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Morrison County Building Permit Guide

Morrison County Land Services issues land use permits, which it uses in place of building permits, plus septic, shoreland and feedlot approvals outside the cities; electrical permits come from the state.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Mower County Building Permit Guide

Mower County Environmental Services in Austin issues zoning, septic and feedlot permits outside the cities; its pages describe zoning review rather than county building inspections, and electrical work goes to the state.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Nicollet County Building Permit Guide

Nicollet County Property Services in St. Peter issues zoning permits for structures, septic systems and land alterations outside the six cities; applications go in by email, and the county’s pages describe no building-code inspections.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Nobles County Building Permit Guide

Nobles County Environmental Services in Worthington issues land use, septic and zoning permits for the unincorporated county; the 11 cities, including Worthington, permit themselves.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Olmsted County Building Permit Guide

Olmsted County permits four cities and three townships — and not the rest of its own county.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Otter Tail County Building Permit Guide

Otter Tail County Land and Resource Management issues structure, shoreland alteration and septic permits online for shoreland areas outside its 22 cities, under the county shoreland ordinance.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Pennington County Building Permit Guide

Pennington County's shoreland, floodplain, septic, wetland and feedlot permits are handled by the Pennington SWCD in Thief River Falls; five townships and the three cities add their own permits.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Pine County Building Permit Guide

Pine County Planning and Zoning issues building site permits in shoreland, floodplains and nine opted-in townships and cities, plus septic permits; two townships and five cities enforce the building code.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Plymouth Building Permit Guide

Re-siding a Plymouth house can require an electrical permit — because the fixtures have to come off the wall and go back on.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Polk County Building Permit Guide

Polk County Planning and Zoning issues land use and septic permits outside the 15 cities, with township sign-off in 13 joint-permitting townships; the county has not adopted the State Building Code.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Pope County Building Permit Guide

Pope County Land and Resource Management issues land use, septic and shoreland permits in the unincorporated county under an ordinance amended July 21, 2026; city clerks permit inside the cities.

13 min readOctober 2026
Read Guide
County GuideMinnesota

Ramsey County Building Permit Guide

Ramsey County cities issue building permits, and every demolition needs a county pre-demolition inspection first. Offices for Saint Paul, Maplewood, Roseville and Shoreview.

5 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Redwood County Building Permit Guide

Redwood County’s Environmental Office issues zoning, septic, shoreland and land-use permits for land outside the 15 cities; it describes no building-code inspections in rural areas.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Renville County Building Permit Guide

Renville County Environmental Services issues land use, septic and grading permits outside the cities; a land use permit is $80 and a septic permit $350 in 2026.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Rice County Building Permit Guide

Rice County Environmental Services issues building, zoning and septic permits online for the unincorporated county outside Bridgewater Township; five cities run their own, and electrical permits come from the state.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Rochester Building Permit Guide

Since May 2025, re-roofing, re-siding and replacing windows in Rochester all require a permit and inspections.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Roseau County Building Permit Guide

Roseau County has no countywide zoning; it permits building in shoreland and floodplain areas, now through the Roseau SWCD, and septic systems through Environmental Services in Roseau.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Saint Paul Building Permit Guide

Saint Paul issues two certificates of occupancy, not one — and the second never stops being required.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Scott County Building Permit Guide

A Scott County property can have a city postal address and still be permitted by the county — the address will not tell you.

13 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Sherburne County Building Permit Guide

Sherburne County Planning and Zoning issues building, septic, shoreland and zoning permits outside the cities and Becker Township, through its online portal; electrical permits come from the state.

14 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Sibley County Building Permit Guide

Sibley County Zoning in Gaylord issues land use permits, setback certificates and septic permits in the townships; Faxon and Jessenland townships have their own zoning, and the cities permit separately.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

St. Cloud Building Permit Guide

St. Cloud wants an inspection every six months just to show the job is moving — and replacing a lapsed permit costs half the original fee, up to $100.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

St. Louis County Building Permit Guide

St. Louis County does not issue building permits. It issues land use permits — and they are required for most building construction anyway.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

St. Louis Park Building Permit Guide

Build big enough in St. Louis Park and you owe your neighbours a plan — in writing, with a number to call.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Stearns County Building Permit Guide

In Stearns County the question is not only the county — it is which township you are in, and whether you are in shoreland.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Steele County Building Permit Guide

Steele County Planning and Zoning enforces the State Building Code in the rural county and in Blooming Prairie, Ellendale and Medford, with building, septic and land use permits filed online.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Todd County Building Permit Guide

Todd County Planning and Zoning issues land use, septic and shoreland permits outside the cities, under its 2026 fee schedule; a one-year data center moratorium began July 21, 2026.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Wabasha County Building Permit Guide

Wabasha County Planning and Zoning administers the State Building Code and zoning outside the cities, with plan review and inspections by Construction Management Services and applications through iWorQ.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Wadena County Building Permit Guide

Wadena County has been zoned countywide since 1971; Planning and Zoning in the courthouse issues structure, land use and septic permits outside the cities, and septic certificates are required at every sale.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Waseca County Building Permit Guide

Waseca County Planning and Zoning issues zoning and septic permits for all townships through GeoPermits; it does no building-code or electrical inspection, and homes near the City of Waseca also need a city building permit.

13 min readOctober 2026
Read Guide
County GuideMinnesota

Washington County Building Permit Guide

Washington County cities and townships issue building permits; the county does septic, township zoning and highway access. Offices: Woodbury, Cottage Grove, Oakdale, Forest Lake.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Watonwan County Building Permit Guide

Watonwan County Land Management in St. James issues land use, building, septic and shoreland permits outside the cities under its zoning ordinance; it does not enforce the building code.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Winona County Building Permit Guide

Winona County Planning & Environmental Services issues development certificates, septic, well and feedlot permits online; Saratoga, St. Charles and Utica townships use a contracted administrator and Wilson Township zones itself.

13 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Woodbury Building Permit Guide

Woodbury issues one permit covering the whole project — building, plumbing, heating and electrical fees together, not four separate permits.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Wright County Building Permit Guide

Wright County permits nearly all of its townships — and one of its cities — but there are three townships it does not touch.

12 min readAugust 2026
Read Guide

How building permits work in Minnesota

These rules apply across Minnesota. Each local guide above covers what is specific to that city or county: its permitting office and contacts, who holds the electrical and plumbing route there, local requirements, fees and inspections.

One statewide code, enforced locally

Minnesota has one building code. The Minnesota State Building Code is the standard for the construction, reconstruction, alteration, repair and use of buildings statewide, and it supersedes the building code of any municipality (Minn. Stat. §326B.121). A city or county administers it but must not, by ordinance or development agreement, require building code provisions that differ from it; the only exception is a more restrictive ordinance justified by geological conditions and approved by the state building official. Agricultural buildings are outside the code, with narrow exceptions.

Enforcement is local. A municipality that had adopted the code by 1 January 2008 must keep enforcing it (municipalities of fewer than 2,500 people outside a metropolitan county are excepted), and any other municipality may adopt it by ordinance. The core code is the 2020 Minnesota State Building Code, and the commercial energy code was updated on 5 January 2024.

A municipality may require exterior work authorised by a building permit to be finished within a set period, but not sooner than 180 days after the permit is issued (§326B.121, subd. 1a). A state surcharge is collected with building permits and remitted to the state (§326B.148).

⚠️ The code is the same; the counter is not. Building without a required permit exposes the job to stop-work orders, penalties, correction orders and delayed occupancy, and unlicensed residential contracting above the state threshold is a separate violation enforced by the state.

Contractor licensing, the $15,000 exemption and the recovery fund

The Department of Labor and Industry licenses residential building contractors, remodelers, roofers, electricians and plumbers for the whole state, so the credentials travel between cities. A contractor doing residential building or remodeling work for homeowners in more than one special skill needs a residential building contractor or remodeler licence; a specialty contractor offering only one special skill generally does not, but residential roofers must be licensed (§326B.805). A contractor whose gross annual receipts from licensed work will not exceed $15,000 can instead obtain a state certificate of exemption. Owners building or improving a home they occupy, or will keep as a rental, are exempt, but not when building for resale or speculation.

The licence is issued to the business, with a qualifying person who meets the examination and education requirements: the proprietor, a general partner, a chief manager, an owner or officer, or a managing employee regularly employed by the business.

Instead of posting a surety bond, licensees pay into the Contractor Recovery Fund, from which homeowners may be compensated (§326B.89). A payment from the fund on a contractor’s account is a ground for action against the licence unless the contractor repays twice the amount paid, with 12 percent interest, and obtains a surety bond of at least $40,000 (§326B.84).

Mechanical contractors need no state licence, but anyone contracting for gas, heating, ventilation, cooling, air conditioning, fuel burning or refrigeration work must give the state a $25,000 bond (§326B.197).

Electrical and plumbing: licences, permits and state review

  • Electrical work must be done by state-licensed electricians. An individual may do electrical work on a home they own and occupy, or will occupy, if it has its own electrical service not shared with another dwelling (§326B.33). Electrical permits and inspections come from the state unless the city or township has taken on electrical inspection by ordinance (§326B.36); the Department of Labor and Industry’s Local Code Lookup shows which applies.
  • Plumbing work must be done by state-licensed plumbers. The state reviews plumbing plans for public and commercial buildings and for residential buildings of five or more units, except in municipalities with a plan review agreement with the department and in the first-class cities of Minneapolis, St. Paul, Duluth and Rochester.

Where the state holds the administrative authority for plumbing — on public buildings, state-licensed facilities, school district and charter school projects and certain others — inspections are carried out by state plumbing inspectors rather than municipal staff, and the permit and inspection fees are submitted to the state. Where a municipality holds a plan review agreement and its inspectors are licensed master or journeyworker plumbers, the municipality inspects instead.

Sources