How building permits work in Minnesota

County GuideMinnesota

Anoka County Building Permit Guide

Anoka County does not issue or inspect building permits; its cities do. Offices, portals, electrical routes and county road fees for Blaine, Coon Rapids, Andover and Fridley.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Apple Valley Building Permit Guide

Apple Valley can order your electricity disconnected over defective work — immediately where there is danger, and after 15 days where there is not.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Blaine Building Permit Guide

A Blaine permit can be finished, reviewed and approved and still not issue — because a regional body has not returned its determination.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Bloomington Building Permit Guide

You cannot list a Bloomington house for sale until the city has inspected it — the inspection comes before the listing, not before the closing.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Brooklyn Park Building Permit Guide

No permit issues in Brooklyn Park until the city has your insurance certificates — two of them, at limits fixed in the city code.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Burnsville Building Permit Guide

A Burnsville demolition is not finished when the building is gone — the site has to be filled, graded, drained and seeded.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Carver County Building Permit Guide

In rural Carver County the right to be issued a permit for a house is itself a finite thing — allocated, counted and sometimes transferable.

12 min readAugust 2026
Read Guide
County GuideMinnesota

Dakota County Building Permit Guide

Dakota County cities and townships issue building permits; the county handles wells, some septic, shoreland and highways. Offices for Lakeville, Eagan, Burnsville and Apple Valley.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Duluth Building Permit Guide

A pole barn in Duluth is not a simple building — it falls outside the prescriptive code and needs a Minnesota structural engineer’s stamp.

13 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Eagan Building Permit Guide

Eagan gives away a free permit for the projects that do not need one — and it is the one most likely to save you a dispute with a neighbour.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Eden Prairie Building Permit Guide

Start work in Eden Prairie before the permit is issued and the code allows the fee to be doubled — on top of the fines.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Edina Building Permit Guide

If the owner does not live in the house, Edina will only issue the mechanical and plumbing permits to a contractor licensed by the city itself.

12 min readAugust 2026
Read Guide
County GuideMinnesota

Hennepin County Building Permit Guide

Hennepin County’s 45 cities issue building permits; the county regulates most septic systems and county road work. Offices for Minneapolis, Bloomington and Brooklyn Park.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Lakeville Building Permit Guide

Lakeville will close a roofing or siding permit on photographs — you email the pictures and the final inspection is scheduled without you.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Maple Grove Building Permit Guide

On a Maple Grove re-siding job, printed photographs of the house wrap must be on site at the final inspection; on a re-roof, printed photographs of the ice and water protection.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Minneapolis Building Permit Guide

Let a Minneapolis permit expire on an empty building and the city can register it as vacant — at an annual fee north of $7,000.

13 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Minnetonka Building Permit Guide

In Minnetonka the fencing goes up before the permit comes out — erosion control and tree protection must be installed and inspected first.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Olmsted County Building Permit Guide

Olmsted County permits four cities and three townships — and not the rest of its own county.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Plymouth Building Permit Guide

Re-siding a Plymouth house can require an electrical permit — because the fixtures have to come off the wall and go back on.

12 min readAugust 2026
Read Guide
County GuideMinnesota

Ramsey County Building Permit Guide

Ramsey County cities issue building permits, and every demolition needs a county pre-demolition inspection first. Offices for Saint Paul, Maplewood, Roseville and Shoreview.

5 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Rochester Building Permit Guide

Since May 2025, re-roofing, re-siding and replacing windows in Rochester all require a permit and inspections.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Saint Paul Building Permit Guide

Saint Paul issues two certificates of occupancy, not one — and the second never stops being required.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Scott County Building Permit Guide

A Scott County property can have a city postal address and still be permitted by the county — the address will not tell you.

13 min readAugust 2026
Read Guide
Municipal GuideMinnesota

St. Cloud Building Permit Guide

St. Cloud wants an inspection every six months just to show the job is moving — and replacing a lapsed permit costs half the original fee, up to $100.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

St. Louis County Building Permit Guide

St. Louis County does not issue building permits. It issues land use permits — and they are required for most building construction anyway.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

St. Louis Park Building Permit Guide

Build big enough in St. Louis Park and you owe your neighbours a plan — in writing, with a number to call.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Stearns County Building Permit Guide

In Stearns County the question is not only the county — it is which township you are in, and whether you are in shoreland.

12 min readAugust 2026
Read Guide
County GuideMinnesota

Washington County Building Permit Guide

Washington County cities and townships issue building permits; the county does septic, township zoning and highway access. Offices: Woodbury, Cottage Grove, Oakdale, Forest Lake.

6 min readOctober 2026
Read Guide
Municipal GuideMinnesota

Woodbury Building Permit Guide

Woodbury issues one permit covering the whole project — building, plumbing, heating and electrical fees together, not four separate permits.

12 min readAugust 2026
Read Guide
Municipal GuideMinnesota

Wright County Building Permit Guide

Wright County permits nearly all of its townships — and one of its cities — but there are three townships it does not touch.

12 min readAugust 2026
Read Guide

How building permits work in Minnesota

These rules apply across Minnesota. Each local guide above covers what is specific to that city or county: its permitting office and contacts, who holds the electrical and plumbing route there, local requirements, fees and inspections.

One statewide code, enforced locally

Minnesota has one building code. The Minnesota State Building Code is the standard for the construction, reconstruction, alteration, repair and use of buildings statewide, and it supersedes the building code of any municipality (Minn. Stat. §326B.121). A city or county administers it but must not, by ordinance or development agreement, require building code provisions that differ from it; the only exception is a more restrictive ordinance justified by geological conditions and approved by the state building official. Agricultural buildings are outside the code, with narrow exceptions.

Enforcement is local. A municipality that had adopted the code by 1 January 2008 must keep enforcing it (municipalities of fewer than 2,500 people outside a metropolitan county are excepted), and any other municipality may adopt it by ordinance. The core code is the 2020 Minnesota State Building Code, and the commercial energy code was updated on 5 January 2024.

A municipality may require exterior work authorised by a building permit to be finished within a set period, but not sooner than 180 days after the permit is issued (§326B.121, subd. 1a). A state surcharge is collected with building permits and remitted to the state (§326B.148).

⚠️ The code is the same; the counter is not. Building without a required permit exposes the job to stop-work orders, penalties, correction orders and delayed occupancy, and unlicensed residential contracting above the state threshold is a separate violation enforced by the state.

Contractor licensing, the $15,000 exemption and the recovery fund

The Department of Labor and Industry licenses residential building contractors, remodelers, roofers, electricians and plumbers for the whole state, so the credentials travel between cities. A contractor doing residential building or remodeling work for homeowners in more than one special skill needs a residential building contractor or remodeler licence; a specialty contractor offering only one special skill generally does not, but residential roofers must be licensed (§326B.805). A contractor whose gross annual receipts from licensed work will not exceed $15,000 can instead obtain a state certificate of exemption. Owners building or improving a home they occupy, or will keep as a rental, are exempt, but not when building for resale or speculation.

The licence is issued to the business, with a qualifying person who meets the examination and education requirements: the proprietor, a general partner, a chief manager, an owner or officer, or a managing employee regularly employed by the business.

Instead of posting a surety bond, licensees pay into the Contractor Recovery Fund, from which homeowners may be compensated (§326B.89). A payment from the fund on a contractor’s account is a ground for action against the licence unless the contractor repays twice the amount paid, with 12 percent interest, and obtains a surety bond of at least $40,000 (§326B.84).

Mechanical contractors need no state licence, but anyone contracting for gas, heating, ventilation, cooling, air conditioning, fuel burning or refrigeration work must give the state a $25,000 bond (§326B.197).

Electrical and plumbing: licences, permits and state review

  • Electrical work must be done by state-licensed electricians. An individual may do electrical work on a home they own and occupy, or will occupy, if it has its own electrical service not shared with another dwelling (§326B.33). Electrical permits and inspections come from the state unless the city or township has taken on electrical inspection by ordinance (§326B.36); the Department of Labor and Industry’s Local Code Lookup shows which applies.
  • Plumbing work must be done by state-licensed plumbers. The state reviews plumbing plans for public and commercial buildings and for residential buildings of five or more units, except in municipalities with a plan review agreement with the department and in the first-class cities of Minneapolis, St. Paul, Duluth and Rochester.

Where the state holds the administrative authority for plumbing — on public buildings, state-licensed facilities, school district and charter school projects and certain others — inspections are carried out by state plumbing inspectors rather than municipal staff, and the permit and inspection fees are submitted to the state. Where a municipality holds a plan review agreement and its inspectors are licensed master or journeyworker plumbers, the municipality inspects instead.

Sources