Roseau County, Minnesota Building Permit Guide

To get a building permit in Roseau County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Roseau County regulates building only in shoreland and floodplain areas, and septic systems in unsewered areas; since January 1, 2026 the Roseau Soil and Water Conservation District runs the shoreland and floodplain programs.

Authority: Roseau County Environmental ServicesCode: Shoreland Ordinance No. 4; Floodplain Ordinance No. 29 (May 26, 2026)Phone: 218-463-3750
Septic
Environmental ServicesCourthouse, 606 5th Ave SW, Room 150, Roseau
Shoreland and flood
Roseau SWCDTook over January 1, 2026
Floodplain rules
Ordinance No. 29Adopted May 26, 2026
Review
Within 30 daysShoreland permit applications

Roseau County has no countywide zoning or building code; its permits cover shoreland (within 1,000 feet of a lake or 300 feet of a river), floodplain districts and septic systems. The County Board moved the shoreland and floodplain programs from Environmental Services to the Roseau Soil and Water Conservation District (SWCD) from January 1, 2026, and adopted a new Floodplain Management Ordinance on May 26, 2026. Septic matters remain with Environmental Services at the courthouse in Roseau, 218-463-3750.

What requires a permit in Roseau County?

The county regulates land through three ordinances: the Shoreland Management Ordinance (No. 4), the Floodplain Management Ordinance (No. 29) and the Subsurface Sewage Treatment System Ordinance (No. 24, dated June 2014). No zoning ordinance or building code appears among the county ordinances it posts, so land away from water and outside a mapped floodplain carries no county building permit. Septic systems are the exception: the SSTS ordinance covers unsewered areas of the county, in cities as well as townships.

Shoreland permit needed

  • Building construction, including external additions
  • Decks and signs
  • Altering or moving a building in a way that changes its outside dimensions
  • Installing or altering a sewage treatment system
  • Grading and filling not exempted by section 5.05 of the ordinance

Other county permits

  • Development in the floodway, flood fringe or general floodplain districts (Ordinance No. 29)
  • Septic systems in unsewered areas, incorporated or not, under the SSTS ordinance
  • Work in county highway right of way, such as driveways and culverts
  • A structure number (rural address) under Ordinance No. 25

Shoreland is the land within 1,000 feet of the ordinary high water level of a lake, pond or flowage, and within 300 feet of a river or stream. The shoreland ordinance covers the unincorporated county, and under state rules lakes, ponds and flowages under 25 acres need not be regulated. Where no floodplain controls apply, it sets a lake home’s lowest floor, including any basement, at least 3 feet above the highest known water level or 3 feet above the ordinary high water level, whichever is higher.

What the county decides and what the state holds

The county’s permits decide location: setbacks from water, bluffs, roads and wells, flood elevation and septic standards. They are not building-code permits, and the county posts no plan review or construction inspections. Electrical permits come from the Minnesota Department of Labor and Industry (DLI).

Roseau County building department: who handles permitting

Environmental Services, headed by Director Jeff Pelowski, has long run the county’s solid waste, shoreland, floodplain and wastewater programs. On December 23, 2025 the County Board voted unanimously to transfer administration of the floodplain and shoreland management programs to the Roseau SWCD effective January 1, 2026, with $10,197 appropriated for the work in 2026. The new floodplain ordinance also keeps its flood maps on file at the SWCD. Septic permits remain with Environmental Services, and roads with the Highway Department, which maintains about 735 miles of county roads, 218 bridges and large culverts and about 900 miles of county ditch, with shops in Badger, Greenbush, Strathcona, Wannaska and Warroad.

Short on time to read all of this?

Get a free quote →
Roseau County permitting contacts
OfficeContact
Environmental Services (septic, wastewater)Roseau County Courthouse, 606 5th Avenue SW, Room 150, Roseau, MN 56751; 218-463-3750; Monday to Friday 8:00 a.m. to 4:30 p.m.
Roseau SWCD (shoreland, floodplain, wetlands)502 7th Street SW, Suite 5, Roseau, MN 56751; 218-463-1903; Monday to Friday 8:00 a.m. to 4:30 p.m.
Highway Department (access, utility and moving permits)1921 Industrial Boulevard, Roseau, MN 56751; 218-463-2063; fax 218-463-2064; 7:00 a.m. to 3:30 p.m.; County Engineer Ericka Halstensgard
Electrical permitsMinnesota Department of Labor and Industry

Cities in Roseau County

The county’s shoreland rules apply outside city limits; each city handles its own zoning and decides whether it enforces the State Building Code.

Incorporated cities in Roseau County (Census figures)
CityWho handles zoning and building permits
Roseau (2,685), Warroad (1,976)Each city; both take part in FEMA’s flood insurance program
Greenbush (675), Badger (414)Each city; both also FEMA participants
Roosevelt (146 residents in Roseau County; the city extends into a neighboring county), Strathcona (27)Each city at its own city hall

Roseau County permit types

The shoreland ordinance calls its main permit a building permit, applied for on county forms to the Zoning Administrator. Each permitted activity ends with a certificate of zoning compliance stating that the use of land meets the ordinance. Septic, floodplain, access and moving permits are separate.

Residential permits

A shoreland application includes a sketch plan showing the lot’s dimensions, the size and location of proposed and existing structures and accessory structures, the septic system, the proposed well and any existing wells, and any grading or filling. The permit is granted once the fee is paid and the work does not conflict with the ordinance; a denial comes with written reasons. In a mapped floodplain district, Ordinance No. 29 names the SWCD as the office that administers and enforces it: applications go to the SWCD with a site plan, the location of any fill or stored materials relative to the stream channel and copies of other required permits. The ordinance rests on the April 19, 2017 Flood Insurance Study and maps and a July 31, 2017 map revision.

Not sure this scope needs a permit?

Get a free quote →

Commercial and other permits

Commercial, industrial, public, semipublic and agricultural uses in shoreland have special provisions in section 5.08 of the shoreland ordinance, and uses that need review go through conditional use permits. Planned unit developments and subdivisions in shoreland have their own chapters on land suitability, platting and density. Large-scale assemblies, cannabis businesses and essential public service lines have their own county ordinances. In the floodplain, recreational vehicles on lots of record, in existing campgrounds or in condominium-type associations are exempt if they are licensed, highway-ready and attached only by quick-disconnect utilities, with no permanent additions.

What comes before the permit

  • Variance. Setback shortfalls go to the Board of Adjustment, three members appointed by the County Board who may not be elected officials or state or county employees.
  • Septic design under the 2014 SSTS ordinance, which allows alternative local standards for some systems.
  • Floodplain variances follow the shoreland ordinance’s variance procedure, but may not allow a use the district forbids or flood protection below the regulatory flood protection elevation, are barred in a floodway if flood levels would rise, and come with a written warning that building below the base flood level raises flood insurance premiums.
  • Flood boundary questions. Anyone contesting where a floodplain boundary lies may present the case to the Board of Adjustment.
  • Wetlands. The SWCD handles wetland delineations, determinations and field reviews under the Wetland Conservation Act.
  • Road access through the Highway Department’s online permit site.

Roseau County permit fees

The shoreland ordinance says the fee schedule for building and related permits, conditional use permits, variances, amendments and subdivisions is adopted by the County Board, posted in the County Environmental Office and changed only by board resolution. Ask the Environmental Office or the SWCD for the current amounts; the table shows which body sets each charge.

Roseau County permit charges and where they are set
ItemWhere the fee is set
Shoreland building permit, conditional use, varianceCounty Board fee schedule, posted in the Environmental Office
Septic permitEnvironmental Services
Floodplain permitFloodplain program, administered by the SWCD since January 1, 2026
Access, utility and moving permitsHighway Department, through its online permit site
Copies of public records, 100 pages or fewer25 cents a page one-sided, 50 cents two-sided (data request fee schedule adopted October 7, 2026)

Rather talk it over?

Call 1-855-478-4290 →

The ordinance does give the timing: permit applications are examined and processed within 30 days of receiving all the information needed, unless the Board of Adjustment extends the time. Enforcement under the 2026 floodplain ordinance can include after-the-fact permits, fines and a request to the National Flood Insurance Program to deny flood insurance.

Trade permits and who may pull them

The county issues no electrical, plumbing or mechanical permits. Electrical permits and inspections come from DLI, which applies the 2026 National Electrical Code to permits filed on or after August 17, 2026; electricians, plumbers and residential building contractors are licensed by the state. The 2014 SSTS ordinance sets licensing requirements for septic work, with a license exemption section of its own.

  • Septic installers follow the ordinance’s standards for tanks, holding tanks, privies and treatment areas, including its alternative local standards for vertical separation.
  • Well work. The shoreland ordinance requires septic systems to sit at least 50 feet from a well, 20 feet from an occupied building and 10 feet from a lot line; the SWCD offers 90% cost share for sealing unused wells and a weekly courier for well water test kits.
  • Utility and road crews need the Highway Department’s utility or work-in-right-of-way permit.

How to apply for a Roseau County permit

1. Check the water and flood maps

See whether the parcel is within shoreland or a floodplain district, using the county’s online atlas or the SWCD.

2. Septic first

Ask Environmental Services about a design or permit for the septic system.

3. Draw the sketch plan

Show the lot, structures, septic system, wells and any grading.

4. Apply to the SWCD

File the shoreland or floodplain application and pay the scheduled fee.

5. Variance if needed

Take setback problems to the Board of Adjustment before building.

6. Road access

Apply online for work in county right of way.

7. Electrical

The electrician files with DLI.

Review, corrections and what causes delay

The 30-day processing clock starts only when all the needed information is in, so an incomplete sketch delays the permit. Since January 1, 2026 shoreland and floodplain applications go to the SWCD on its forms, not to the courthouse. Floodplain applications may need elevation data from the 2017 flood study, and floodplain amendments cannot be adopted without DNR approval, so map changes take time.

Rather not deal with the Roseau County building department?

Get a free quote →

Inspections in Roseau County

Shoreland permits are checked against the ordinance’s setbacks, which depend on the class of water. A water-oriented accessory structure built to section 5.04 may sit 10 feet from the ordinary high water level, and every structure must also be 30 feet from the top of a bluff, 50 feet from an unplatted cemetery and 50 feet from a federal, state or county road right of way (30 feet from other roads).

Shoreland setbacks from the ordinary high water level (Ordinance No. 4, section 5.02)
Water classStructure from the waterSeptic system from the water
Natural environment lake150 ft (side lot line 20 ft)150 ft
General development lake75 ft (side lot line 10 ft)75 ft unsewered, 50 ft sewered
Remote river segment200 ft150 ft
Forested river segment150 ft100 ft
Agricultural river segment75 ft75 ft

In a floodplain, the check is paperwork from a professional: a registered engineer, architect or land surveyor certifies that the finished fill and building elevations meet the ordinance, floodproofing must be certified by an engineer or architect, and no building may be occupied until the SWCD issues a certificate of zoning compliance. The SWCD keeps a record of every lowest-floor elevation. The county posts no building-code inspections, and wiring is inspected by the state.

Minnesota building code

Roseau County enforces shoreland, floodplain and septic ordinances, not the State Building Code. FEMA’s Community Status Book lists the county in the National Flood Insurance Program since January 2, 1980, with a current flood map dated April 19, 2017, the date the new floodplain ordinance adopts.

Minnesota has one State Building Code that applies statewide and overrides local building codes, but enforcement is local: whether a building permit is needed depends on whether the city, township or county enforces the code there. Electrical permits come from the Department of Labor and Industry unless the local government runs its own electrical inspection. Minnesota rules

Roseau County permit search and official resources

Board of Adjustment records are filed permanently in the Environmental Office; ask Environmental Services about septic records and the SWCD about shoreland and floodplain files from 2026 on. Records requests follow the county’s data request policy and fee schedule, and board agendas, packets and proceedings are posted by year.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Roseau County permit FAQs

Do I need a county building permit for a house away from a lake?

Not under the ordinances the county posts: county building permits apply in shoreland and floodplain areas, while a septic system in any unsewered area falls under the county’s SSTS ordinance.

Who handles shoreland permits now?

The Roseau SWCD, since January 1, 2026, at 502 7th Street SW in Roseau; septic stays with Environmental Services at the courthouse.

What changed in the 2026 floodplain ordinance?

The County Board adopted Floodplain Management Ordinance No. 29 on May 26, 2026; it adopts the April 19, 2017 flood study and maps and a July 31, 2017 map revision.

How far must a cabin be from the lake?

It depends on the lake class: 150 feet on a natural environment lake and 75 feet on a general development lake, with one water-oriented accessory structure allowed at 10 feet.

How much does a shoreland permit cost?

The County Board’s fee schedule is posted in the Environmental Office; ask there or at the SWCD for the current amount.

How long does review take?

The ordinance allows 30 days after a complete application.

Can I keep a camper on my lot in the floodplain?

Yes, if it is licensed for the road, ready to move on its wheels, connected only by quick-disconnect utilities and has no permanent additions; otherwise it falls under the floodplain ordinance.

Who approves a driveway onto a county road?

The Highway Department on Industrial Boulevard, through its online work-in-right-of-way permit.

Simplify Roseau County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Minnesota. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Roseau County sooner?

Let Alliance prepare, file, and track your Roseau County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Roseau County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.