Pope County, Minnesota Building Permit Guide

To get a building permit in Pope County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Pope County Land and Resource Management in Glenwood issues land use, septic and shoreland alteration permits for the unincorporated county, filed through Cloudpermit, by mail or at the courthouse; the nine cities issue their own.

Authority: Pope County Land & Resource ManagementCode: Land Use Controls Ordinance, amended July 21, 2026Phone: 320-634-7791
Office
Land & Resource Management130 E. Minnesota Ave, Glenwood
New house
$250 land use permit2026 fee schedule, effective Jan 1, 2026
Apply online
CloudpermitFee paid with the application
Small sheds
Under 144 sq ft exemptPortable, unattached, no living space

Pope County Land and Resource Management, at 130 East Minnesota Avenue in Glenwood, issues land use, septic and shoreland alteration permits under the Land Use Controls Ordinance, which covers the unincorporated county and was last amended on July 21, 2026. Applications go in through Cloudpermit, by mail or in person with the fee attached; a new house is $250 under the 2026 fee schedule, and permits inside the nine cities come from each city clerk.

What requires a permit in Pope County?

Section 11 of the Land Use Controls Ordinance requires a permit before erecting or installing a new structure, altering one in a way that changes its outside dimensions, converting a structure to another use, moving a structure onto a parcel, installing or altering a septic system, grading or filling in shoreland, starting a mining operation, or beginning any permittable, conditional or interim use. The county’s permit page adds rebuilding damaged structures, and its FAQ names houses, storage sheds, decks, patios, playhouses and garages.

Permit needed

  • New houses, guest cottages and additions
  • Garages, pole buildings and grain bins
  • Decks and patios
  • Roof pitch changes and structural alterations
  • Moving a building onto a lot
  • Septic installation or alteration
  • Shoreland grading, filling, rip rap above the ordinary high water level, stairways and paths in the shore impact zone
  • Vacation home rentals, solar systems and RVs (land use or interim use permit)

No permit

  • Portable, unattached sheds under 144 sq ft with no living quarters
  • Siding, roofing and window replacement that keeps dimensions and use
  • Remodeling that leaves the exterior footprint alone
  • Uses the ordinance lists as permittable by right

Exempt sheds still have to meet the impervious surface and setback standards. In shoreland, grading or filling of more than 50 cubic yards within the shore or bluff impact zones needs approval under section 4.6.10, which may be a conditional use permit.

What the county decides and what the state holds

The county sets zoning districts, lot sizes, setbacks, impervious limits and septic, shoreland, floodplain and feedlot rules. Its permit is a land use permit, and its pages describe zoning, stormwater and septic checks rather than building-code plan review or framing inspections. Townships may have their own permits, so the county tells applicants to contact township officials as well. Well permits belong to the Minnesota Department of Health’s Well Management Section (651-201-4600), electrical permits to the Department of Labor and Industry, and contractors hold state licenses.

⚠️ Fake invoices. The county warns of scam emails from a usa.com address posing as its Planning Advisory Commission and asking for wire payments. Pope County email comes only from @popecountymn.gov, and Land and Resource Management never sends bills or invoices by email.

Short on time to read all of this?

Get a free quote →

Pope County building department: who handles permitting

Land and Resource Management administers the Land Use Controls Ordinance, the septic ordinance, the floodplain ordinance, feedlots, solid waste, subdivisions and rural addressing; David Green is the director. The Highway Department handles county road driveways and approaches.

Pope County permitting contacts
OfficeContact
Land & Resource Management (land use, septic, shoreland, floodplain, addressing)130 East Minnesota Ave, Glenwood, MN 56334; 320-634-7791; pub.lrm@popecountymn.gov; Monday to Friday, 8 a.m. to 4:30 p.m.
Feedlot Officer320-634-7793
Highway Department (driveways, approaches, replacement address signs)320-634-7745; Monday to Friday, 7 a.m. to 3:30 p.m.
WellsMinnesota Department of Health, Well Management Section, 651-201-4600
ElectricalMinnesota Department of Labor and Industry

Cities in Pope County

The county does not issue permits inside the nine cities; each city clerk handles them, and city addresses come from the city office. The county’s point-of-sale septic rule also covers cities without public sewer.

Cities in Pope County (Census 2025 estimates)
CityPermits and flood program
Glenwood (2,631), Starbuck (1,406), Long Beach (334)City clerk issues permits; participating in the flood program
Cyrus (310)City clerk issues permits; listed as not in the flood program
Lowry (338), Villard (227), Farwell (56), Sedan (46), Westport (44)City clerk issues permits; no FEMA listing
BrootenThe Census places a part with no residents in Pope County; the city is not on the county’s list

Pope County permit types

Cloudpermit lets applicants file at any time, follow the status by email, schedule inspections, message the department, pay by credit card and request changes; paper applications can be mailed, dropped off or completed at the counter. The county posts separate applications for land use, septic, septic operating permits, shoreland alteration, RV permits or interim use permits, vacation home rentals, mining and reclamation plans, conditional and interim uses, solar interim uses, variances, rezonings and subdivisions.

Residential permits

A land use application needs a scale sketch plan showing the size and location of new and existing buildings, wells and sewers, floor plans of existing and proposed space, the impervious coverage percentage and the names of licensed contractors, plus the planned lowest floor elevation on a shoreland lot. A certificate of survey by a licensed land surveyor is required when a structure will sit closer than one and a half times the property line setback or an existing structure is being expanded. At least two stormwater best management practices must be shown and approved.

Not sure this scope needs a permit?

Get a free quote →

Shoreland numbers come from section 4 as amended July 21, 2026: structures stand 75 feet from the ordinary high water level on General Development lakes, 100 feet on Recreational Development lakes, 150 feet on rivers and streams and 200 feet on Natural Environment lakes, with septic systems 50, 75, 100 and 150 feet back. Impervious surfaces are capped at 25 percent, or 20 percent on Natural Environment lakes, and buildings stay 30 feet from the top of a bluff. The lowest floor must be at least 3 feet above the highest known water level or the ordinary high water level, whichever is higher.

Commercial and other permits

Commercial structures, communication towers and community solar gardens take a commercial land use permit. Vacation home rentals, solar energy systems and RVs each take either a land use permit or an interim use permit, and a rental also needs a septic operating permit; mining has its own application and reclamation plan. Any construction or expansion of a feedlot needs a county permit under the state feedlot rules the county runs with the Minnesota Pollution Control Agency.

What comes before the permit

  • Septic check. A system over five years old needs a compliance inspection, and a failing system must be upgraded first.
  • Driveway and address. The driveway must be in before Rural Addressing assigns an address, usually in 7 to 10 business days.
  • Hearings. Variances go to the Board of Adjustment; conditional and interim uses, subdivisions and rezonings go through the Planning Advisory Commission to the County Board.
  • Township. Ask the township whether it requires a separate permit.
  • Floodplain. Work in the mapped flood hazard area falls under Floodplain Management Ordinance No. 5 and takes a $75 floodplain permit.

Pope County permit fees

Fees come from the county’s 2026 Services and Fees schedule, effective January 1, 2026, which the department reprints as L&RM Form 20; section 11.3 of the ordinance ties permit fees to the schedule the County Board approves. Fees are paid with the application.

Rather talk it over?

Call 1-855-478-4290 →
Pope County land use, septic and road fees (effective January 1, 2026)
ItemFee
Residential structure, incl. guest homes, cottages and garages with living space above$250
Residential addition up to 600 sq ft$150
Accessory structure over 300 sq ft / over 144 up to 300 sq ft$150 / $100
Minimum land use permit / floodplain permit$75 / $75
Commercial structure / commercial addition$325 / $125
Shoreland alteration permit$150
Septic installation, Type I–III up to 2,500 gal/day$300
Septic, over 2,500 gal/day or Type IV, V, MSTS / holding tank or partial system$375 / $175
Septic operating permit / renewal$150 / $30
Vacation home rental (3 years) / renewal$125 / $75
Conditional or interim use, variance or rezoning$500 plus $46 recording
Permit extension / re-inspection$50 / $50
After-the-fact applicationApplication fee plus 200% of it
Contractor working without a permit$500 penalty
New E911 address$151
County driveway or approach permit$100

Worked example from the schedule: a new house with a standard septic system under 2,500 gallons a day needs the $250 residential permit, the $300 septic permit and a $151 address, or $701, plus $100 if the driveway enters a county road. Accessory structures include new attached garages, detached garages, sheds, pole buildings, grain bins, decks and patios.

Trade permits and who may pull them

Pope County issues no electrical, plumbing or mechanical permits. Electrical permits go to the Department of Labor and Industry wherever its lookup lists the state as the authority. The county’s own trade rules sit inside the land use process.

  • Contractors. It is the contractor’s duty to make sure the permit is secured before work starts, and one who works without it pays a $500 penalty, or the owner does if acting as contractor.
  • Septic designers and inspectors. State-licensed designers submit the design for county review, and compliance inspections are done by state-licensed inspectors; the county keeps a list of licensed septic professionals.
  • Builders. Building contractors are licensed by the Department of Labor and Industry, and the application asks who they are.

Rather not deal with the Pope County building department?

Get a free quote →

How to apply for a Pope County permit

1. Confirm the jurisdiction

Make sure the parcel is outside the nine cities, and ask the township about its own permit.

2. Check the zoning district

Use the county’s zoning map and setback standards for the lot.

3. Deal with the septic system

Get a compliance inspection on a system over five years old, or a licensed designer’s plan for a new one.

4. Prepare the plans

Draw the sketch plan, floor plans, impervious calculation and two stormwater practices; add a survey where required.

5. Apply and pay

File in Cloudpermit, by mail or in person, with the full fee.

6. Install erosion controls

Have the department inspect stormwater and erosion measures before construction begins.

7. Finish within a year

Request a one-year extension for $50 if the exterior is not done.

Review, corrections and what causes delay

Processing times vary, and the county advises getting the permit well before the day work is to start. An application counts as complete only when all fees, plans and data are in. Hearings add the most time: the Board of Adjustment and Planning Advisory Commission meet monthly, on October 22 and November 19 in 2026, and agendas, staff reports and notices of decision are posted online, with public comments taken through a web map. A septic system that fails inspection must be brought into compliance before a permit issues.

Inspections in Pope County

The department inspects stormwater and erosion control measures before construction and inspects new septic systems. The owner or contractor must call for the septic inspection 24 hours before covering the system, and a certificate of compliance follows approval. Inspections can be requested in Cloudpermit, and each re-inspection costs $50.

When property changes hands in the unincorporated county or a city without public sewer, the septic system needs a compliance inspection by an MPCA-licensed inspector, and the Septic System Disclosure and Transfer Agreement must be approved by the department before the Pope County Recorder records the transfer.

Minnesota building code

Pope County regulates development under its Land Use Controls Ordinance, the Subsurface Sewage Treatment System Ordinance and Floodplain Management Ordinance No. 5, amended July 16, 2024. FEMA’s Community Status Book lists the county as participating in the National Flood Insurance Program since August 19, 1987, and new flood maps and a new Flood Insurance Study took effect on September 26, 2024; the office can help owners request a Letter of Map Change.

Minnesota has one State Building Code that applies statewide and overrides local building codes, but enforcement is local: whether a building permit is needed depends on whether the city, township or county enforces the code there. Electrical permits come from the Department of Labor and Industry unless the local government runs its own electrical inspection. Minnesota rules

Pope County permit search and official resources

Applicants follow their permits in Cloudpermit. Board of Adjustment and Planning Advisory Commission agendas, staff reports, minutes and notices of decision are posted by meeting date, and the county keeps an online zoning map viewer; the general fee schedule lists research at $40 an hour for other records.

Want this handled start to finish?

Get a free quote →

Inspections are where schedules slip.

Get a free quote →

Pope County permit FAQs

Does Pope County issue building permits in Glenwood or Starbuck?

No. Permits inside the nine cities come from the city clerk.

Do I need a permit for a small shed?

Not for a portable, unattached shed under 144 square feet with no living space, though it must meet setbacks and impervious limits.

How much does a permit for a new house cost?

$250 for the land use permit, plus $300 for a standard septic permit and $151 for an address under the 2026 schedule.

Can I apply online?

Yes, through Cloudpermit, which also handles payment, status updates and inspection requests.

What happens if I start before the permit?

The owner pays the application fee plus 200 percent, and a contractor who worked without a permit pays a $500 penalty.

How far must a lake cabin be from the water?

75 to 200 feet from the ordinary high water level, depending on the lake class.

Do I need a septic inspection to sell my property?

Yes, outside cities with public sewer a licensed inspector must check the system before the transfer is recorded.

Who handles well permits?

The Minnesota Department of Health’s Well Management Section, not the county.

Simplify Pope County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Minnesota. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Pope County sooner?

Let Alliance prepare, file, and track your Pope County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Pope County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.