McLeod County, Minnesota Building Permit Guide

To get a building permit in McLeod County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

McLeod County Environmental Services in Hutchinson issues land use, septic and feedlot permits for the county outside city limits, with township officials signing land use permits alongside the county.

Authority: McLeod County Environmental Services, Planning & ZoningCode: McLeod County Zoning Ordinance (land use permits)Phone: 320-484-4300
Office
Environmental Services1065 5th Ave SE, Hutchinson
House permit
$400County $325 + township $75 (2026)
Septic permit
$500Standard system, 2026 schedule
Variances
4th Thursday deadlineFor next month’s agenda

McLeod County Environmental Services, at 1065 5th Avenue SE in Hutchinson, issues the land use permit needed to build, enlarge or move a structure anywhere outside city limits, plus septic and feedlot permits. A dwelling permit is $400 under the fee schedule the County Board adopted on December 16, 2025, split between the county and the township, and the office asks owners to call 320-484-4300 before starting to check setbacks, floodplain, shoreland and feedlot distances.

What requires a permit in McLeod County?

Section 21 of the Zoning Ordinance requires a land use permit before anyone erects a structure, makes exterior alterations that change its bulk or size, moves a building, or excavates a basement for an existing or new structure. Separate permits are required for signs and billboards, for installing, altering, repairing or extending a septic system, and for owning or operating a livestock feedlot, including a change of ownership, improvement or expansion. Extracting gravel or other materials needs a conditional use permit.

Land use permit needed

  • New houses and manufactured homes
  • Attached garages and additions of living space
  • Three-season and enclosed porches
  • Accessory buildings, grain bins and livestock buildings
  • Accessory structures under 200 sq ft
  • Decks over 50 sq ft
  • Greenhouses and tent-style structures
  • Solar arrays and wind generators

No fee or no permit

  • Rebuilding after a fire, windstorm or similar catastrophe: permit with no fee
  • Widening a field approach on a county road: permit with no charge
  • Interior work that does not change the structure’s bulk or size: not listed as needing a land use permit

Before applying, the county asks owners to confirm building eligibility, setbacks, whether the site is in a floodplain, within a quarter-mile of a permitted feedlot or in shoreland (1,000 feet from a lake or 300 feet from a river, creek or stream), and whether the project needs a new address, a driveway access permit or a septic inspection.

What the county decides and what the state holds

The ordinance covers all of McLeod County outside the incorporated limits of municipalities, and its districts are Agricultural, Rural Residential, Urban Expansion, Highway Business, Industrial, Floodplain, Shoreland and Conservation. The county’s permit pages describe zoning review, not building-code plan review or inspections, although it posts the Department of Labor and Industry’s fact sheet stating that barndominiums and shouses are dwellings under the Minnesota Residential Code. Electrical work falls to the state unless a local program applies, and McLeod is not among the Minnesota Department of Health’s delegated well programs.

McLeod County building department: who handles permitting

Environmental Services runs planning and zoning, septic systems, feedlots, solid waste and household hazardous waste; Marc Telecky is the director. The county works with its 14 townships: Acoma, Bergen, Collins, Glencoe, Hale, Hassan Valley, Helen, Hutchinson, Lynn, Penn, Rich Valley, Round Grove, Sumter and Winsted. Land use permits carry a county and a township signature line, several permit fees are split between the two, and township zoning offices complete land use applications for farm accessory buildings and additions that do not house livestock. Public Works issues access, right-of-way and oversize moving permits, all through its online ePermitting site.

Short on time to read all of this?

Get a free quote →
McLeod County permitting contacts
OfficeContact
Environmental Services, Planning & Zoning1065 5th Avenue SE, Hutchinson, MN 55350; 320-484-4300; toll-free 800-335-0575
Septic systems and feedlotsEnvironmental Services, 320-484-4300
Highway Department (access, right-of-way, moving permits)320-484-4321; mcleod.highway@mcleodcountymn.gov; County Engineer Andrew Engel
TownshipTown board recommendation for variances; township zoning office for farm accessory buildings
ElectricalMinnesota Department of Labor and Industry

Cities in McLeod County

Cities zone and permit inside their own limits, where the county Zoning Ordinance does not apply. The flood-program column is from FEMA’s Community Status Book.

Cities in McLeod County (Census 2025 estimates)
CityPermits and flood program
Hutchinson (14,655), Glencoe (5,632)City permits; participating in the flood program
Winsted (2,209), Lester Prairie (1,881), Silver Lake (849), Brownton (702), Plato (321)City permits; participating
Stewart (467)City permits; no FEMA listing
Biscay (109)City permits; listed as not in the flood program

McLeod County permit types

The county posts applications for land use permits, conditional use permits (with an information packet), mining conditional use permits, variances (with a booklet), sketch plans, preliminary and final plats, and administrative land splits. Septic permits start with the land use permit application.

Residential permits

The land use application asks for the structure’s size and height, estimated cost of the structure and septic, the building and septic contractors, and a site sketch showing the structure and septic system, setbacks to lot lines and to the road centerline, nearby water and the driveway. The form lists the standard setbacks: 130 feet from the front to a county road, county state-aid highway or state highway and 100 feet to a township road, or 40 feet from the right of way of a minor street in a residential subdivision; 40 feet at the rear for a principal building and 20 feet for an accessory one; and 20 feet at the sides. Lots must be at least 150 feet wide and 250 feet deep.

From the ordinary high water level, structures stand 75 feet from a General Development lake, 100 feet from Recreational lakes and rivers and from streams, and 200 feet from a Natural Environment lake. Any change after the permit is approved must be reapproved by the zoning administrator before construction starts.

Not sure this scope needs a permit?

Get a free quote →

The shoreland section adds a 30-foot setback from the top of a bluff and 50 feet from an unplatted cemetery, keeps everything but stairways and landings out of bluff impact zones, and requires the lowest floor on a lake lot to sit at least 3 feet above the highest known water level or the ordinary high water level, whichever is higher. A conditional use permit is needed to move more than 10 cubic yards of material on steep slopes or in the shore or bluff impact zones, or more than 50 cubic yards elsewhere in shoreland.

Commercial and other permits

Commercial and industrial buildings and additions have their own land use fees with a value-based surcharge, and the schedule adds lines for solar arrays of 0.5 MW or more, wind generators, antenna co-location and upgrades with engineering review, signs, and transfer of development rights. Conditional uses, plats and ordinance amendments go to the Planning Advisory Commission, which recommends to the County Board; a recent example was a home business in an accessory building over 2,400 square feet in Winsted Township.

What comes before the permit

  • Feedlot distance. Check whether the site is within a quarter-mile of a permitted feedlot; McLeod has been an MPCA-delegated feedlot county since 1998 and enforces the state feedlot rules through its Feedlot Management Ordinance.
  • Septic. A design signed by the licensed designer and installer, county soil verification and a management plan.
  • Access. A new driveway onto a county road needs an access permit through the Highway Department’s ePermitting site.
  • Address. A new address is prepaid at the zoning office.
  • Township. For a variance, attend the town board meeting and get its written recommendation.

McLeod County permit fees

The County Board adopted the current fee schedule on December 16, 2025, effective January 1, 2026. Where the schedule splits a land use fee, the county and township shares are shown.

Rather talk it over?

Call 1-855-478-4290 →
McLeod County Environmental Services and Highway fees (effective January 1, 2026)
ItemFee
Dwelling or manufactured home$400 (county $325, township $75)
Attached garage addition / living-space addition$150 / $200
Three-season or enclosed porch$75
Accessory structure over 2,400 sq ft housing livestock$200
Accessory structure under 2,400 sq ft, grain bin or addition$150
Accessory structure under 200 sq ft or deck over 50 sq ft$100
New commercial or industrial building / addition$1,000 / $500, plus a surcharge on value above $100,000
Standard septic system / holding tank$500 / $400
Septic operating permit / design change or extra soil check$50 / $200
Conditional use permit / variance$500 each plus recorder fee and state surcharges
Rezoning / ordinance amendment$700 / $400
Plat$650 first lot, $200 each additional
Feedlot permit (one inspection)$150
After-the-fact permitDouble fee
New address (paid at the zoning office)$220
County road access: field or residential / commercial$125 / $250
Right-of-way permit$150

Worked example from the schedule: a new house with a standard septic system, a new address and a residential entrance onto a county road comes to $400 + $500 + $220 + $125 = $1,245. The septic page still lists older figures, such as $350 plus $100 for soil verification on a Type I system, and the variance page lists a $496 payment; the adopted 2026 schedule is the one in this table.

Other lines worth knowing: signs are $50 up to 32 square feet, then $2 a square foot up to 500 square feet a side; a special County Board meeting when construction started without approval costs $1,000 plus recording fees and state surcharges; and renewing a new feedlot permit left unused in its first year, or a septic renewal permit in what the schedule calls an unplotted area, costs $2,000. A dwelling permit renewal that blocks another building eligibility is also $2,000.

Trade permits and who may pull them

The county lists no electrical, plumbing or mechanical permits in its fee schedule. Electrical permits are filed with the Department of Labor and Industry where its lookup shows the state as the inspection authority, and contractors, electricians and plumbers hold state licenses.

  • Septic installers. The design summary sheet must be signed by the licensed designer and installer.
  • Homeowner septic work. An owner may install a non-pressurized system with advance approval from Environmental Services, if the designer is present at the final inspection.
  • Septic loans. The county takes low-interest septic loan applications for a $50 fee and is lining up funding for system upgrades.

Rather not deal with the McLeod County building department?

Get a free quote →

How to apply for a McLeod County land use permit

1. Call before you plan

Phone 320-484-4300 to check eligibility, setbacks, floodplain, shoreland and feedlot distance.

2. Sketch the site

Show the structure, septic, setbacks to lot lines and road centerline, water and driveway.

3. Line up septic and access

Get the septic design and soil verification; apply for the entrance on ePermitting.

4. Submit the application

File the land use permit application with Environmental Services in Hutchinson.

5. Pay the fee

Pay the county and township shares and the address fee.

6. Build within a year

The permit is valid for one year; get changes reapproved first.

Review, corrections and what causes delay

Projects that need a hearing take longest. Variance applications and the fee must reach the office by the fourth Thursday of a month to be heard the following month, and the applicant must first present the project to the town board for its written recommendation; staff ask applicants to talk through a variance before filing. The Planning Advisory Commission meets on the fourth Wednesday of each month at 9:30 a.m. at the Environmental Services facility and sometimes tours sites first. A sewer certificate of compliance may be needed for a shoreland variance or when the office cannot tell whether a system complies.

Inspections in McLeod County

Environmental Services completes the soil verification for every septic permit, and owner-installed non-pressurized systems need the designer present at the final inspection. A feedlot permit includes one inspection, with $100 for each additional one.

When property changes hands, the seller must disclose the septic system on the county’s transfer form, and a compliance inspection is required if a new system has not been inspected in the past five years or an existing one in the past three. A sale can close with a non-compliant system if buyer and seller sign the county’s agreement on who will upgrade it.

Minnesota building code

McLeod County administers its Zoning Ordinance, Subdivision Ordinance, SSTS Ordinance (enforced since January 1, 2010) and Feedlot Management Ordinance. FEMA’s Community Status Book lists the county as participating in the National Flood Insurance Program since February 4, 1981, with a current flood map dated July 7, 2014; the zoning office issues floodplain certifications for $50.

Minnesota has one State Building Code that applies statewide and overrides local building codes, but enforcement is local: whether a building permit is needed depends on whether the city, township or county enforces the code there. Electrical permits come from the Department of Labor and Industry unless the local government runs its own electrical inspection. Minnesota rules

Want this handled start to finish?

Get a free quote →

McLeod County permit search and official resources

Planning Advisory Commission agendas, packets and minutes are posted by year, and the zoning office issues zoning and floodplain certifications for $50 each; general questions go to Environmental Services at 320-484-4300.

Inspections are where schedules slip.

Get a free quote →

McLeod County permit FAQs

Does McLeod County issue permits in Hutchinson or Glencoe?

No. The Zoning Ordinance covers only land outside the incorporated limits of cities.

How much is a land use permit for a new house?

$400 in 2026, of which $325 goes to the county and $75 to the township.

What does a septic permit cost?

$500 for a standard system under the 2026 schedule, or $400 for a holding tank.

Can I install my own septic system?

Only a non-pressurized system, with advance approval and the designer present at the final inspection.

How far must a house be from a county road?

130 feet, the front-yard setback the land use permit form lists for county roads, county state-aid highways and state highways.

When is the variance deadline?

The fourth Thursday of the month for the following month’s Board of Adjustment agenda.

How do I get a driveway permit?

Apply through the Highway Department’s ePermitting site; a residential entrance is $125.

Simplify McLeod County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Minnesota. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in McLeod County sooner?

Let Alliance prepare, file, and track your McLeod County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about McLeod County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.