Montana Building Permit Guides

29 building permit guides for Montana jurisdictions.

How building permits work in Montana

Municipal GuideMontana

Beaverhead County Building Permit Guide

Beaverhead County, Dillon and Lima have no certified building program, so the State permits commercial buildings and houses under 5 units need no building permit. County Land Services, Environmental Health and the Road Department issue the local permits.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Belgrade Building Permit Guide

How building permits work in Belgrade, Montana: the City Building Department issues building and trade permits through Cityworks, with FY2027 fees, checklists, impact fees and inspection rules.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Big Horn County Building Permit Guide

Big Horn County has no building department. Hardin permits residential construction inside its limits and sends commercial buildings to the State, and County Environmental Health issues septic permits from $475.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Billings Building Permit Guide

Billings issues permits only inside its city limits, all through CityView. What needs a permit, the design criteria, the fence-height conflict, fees and the 18-month exterior rule.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Bozeman Building Permit Guide

Bozeman runs its own certified building program inside city limits. What its municipal code says about demolition, moving, contractor bonds and electrical permits and inspections.

4 min readOctober 2026
Read Guide
Municipal GuideMontana

Butte-Silver Bow Building Permit Guide

Everything contractors, builders, and developers need to get a building permit in Butte-Silver Bow, Montana - requirements, online filing paths, fees, contractor licensing, trade permits, and inspections.

9 min readJune 2026
Read Guide
Municipal GuideMontana

Carbon County Building Permit Guide

Carbon County issues Development Permits, not building permits, through one online package with the address, approach and septic applications. Red Lodge runs the only certified building program in the county.

15 min readOctober 2026
Read Guide
Municipal GuideMontana

Cascade County Building Permit Guide

Cascade County does not enforce building codes. Who does, the county Location/Conformance, floodplain, septic and road permits and their fees, plus Great Falls.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Custer County Building Permit Guide

Custer County requires a zoning conformance permit on land in its zoning districts, with site plan review decided within 30 working days. Miles City runs its own building department and the State covers the building code elsewhere.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Fergus County Building Permit Guide

Fergus County requires a $50 Development Permit before building, which assigns the address and flags floodplain, road and septic needs. Lewistown issues building permits inside the city and the State handles the building code elsewhere.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Flathead County Building Permit Guide

Flathead County has no building department. Who issues permits in its three cities and the rest of the county, plus county zoning, floodplain, lakeshore and septic permits.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Gallatin County Building Permit Guide

Everything contractors, builders and developers need for a Gallatin County building permit — who issues it (the state or a certified city, never the county), county land use permits, fast Bozeman-area growth, the uniform Montana code, snow and seismic loads, and how fees work.

11 min readAugust 2026
Read Guide
Municipal GuideMontana

Glacier County Building Permit Guide

Glacier County has no building department. Cut Bank issues building permits inside the city from a project-cost fee table, and trade permits there come from the State, which also permits commercial buildings outside the city and the Blackfeet Reservation.

11 min readOctober 2026
Read Guide
Municipal GuideMontana

Great Falls Building Permit Guide

Great Falls issues permits inside city limits only. Plan sets, geotechnical reports, review times, the 2023 fee schedule and its 2.5% yearly increase, and how to book inspections.

4 min readOctober 2026
Read Guide
Municipal GuideMontana

Hill County Building Permit Guide

Hill County issues a $75 zoning permit in the City-County planning area and sewage permits, Havre issues building permits in the city with plan review added to the fee, and trade permits come from the State.

11 min readOctober 2026
Read Guide
Municipal GuideMontana

Jefferson County Building Permit Guide

Jefferson County, Boulder and Whitehall have no certified building program. The County issues $75 site permits, septic and encroachment permits, the towns issue zoning permits, and the State handles building-code and trade permits.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Lake County Building Permit Guide

Who permits what in Lake County, Montana: County Planning for zoning, lakeshore, floodplain and building notification permits, the State for building-code permits outside Polson and Ronan, and Environmental Health for septic.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Lewis and Clark County Building Permit Guide

Outside Helena and East Helena, the state issues building permits and the county handles addresses, roads and floodplain. Which permits apply, the county fees, and Helena’s office.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Lincoln County Building Permit Guide

How permitting works in Lincoln County, Montana: County Planning for floodplain and lakeshore permits, the Health Department for septic, Libby and Troy for residential building permits and the State for everything else.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Livingston Building Permit Guide

How building permits work in Livingston, Montana: the City Building Department permits and inspects inside city limits, fees follow Resolution 5181, and electrical, plumbing and HVAC permits come from the State.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Missoula Building Permit Guide

Missoula’s Building Division covers the city limits only. Filing on Accela, design criteria, when fees are paid under the new 2026 schedules, and three ways to book inspections.

4 min readOctober 2026
Read Guide
Municipal GuideMontana

Missoula County Building Permit Guide

Everything contractors, builders and developers need for a Missoula County building permit — the certified county Building Division outside Missoula city limits, the City of Missoula program inside them, the uniform Montana code, and how fees work.

10 min readAugust 2026
Read Guide
Municipal GuideMontana

Park County Building Permit Guide

Who permits construction in Park County, Montana: County Planning for zoning compliance and floodplain permits, Environmental Health for septic, the State for the building code, the City of Livingston inside its limits and Clyde Park's town site permit.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Ravalli County Building Permit Guide

Ravalli County, Montana has no building department. The County issues floodplain, septic and approach permits, the State handles the building code outside town, and Hamilton, Darby and Stevensville run their own building departments.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Richland County Building Permit Guide

Richland County, Montana is a State-certified building jurisdiction. Its Building Department in Sidney permits and inspects construction outside Sidney city limits, with fees from a valuation table plus a 35% plan review fee; trade permits come from the State.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Roosevelt County Building Permit Guide

Roosevelt County, Montana has no building department and no certified city program. The State is the building-code authority, the County handles septic, floodplain and land planning, and four of the five municipalities require their own local permit.

11 min readOctober 2026
Read Guide
Municipal GuideMontana

Sanders County Building Permit Guide

Permitting in Sanders County, Montana: Land Services for floodplain, airport and encroachment permits, Environmental Health for wells and septic, the State for building and trade permits, and town permits in Thompson Falls, Hot Springs and Plains.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Whitefish Building Permit Guide

How building permits work in Whitefish, Montana: the City Planning & Building Department permits building and trade work inside city limits, applications go through the Citizen Portal, and inspections need 24 hours' notice.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Yellowstone County Building Permit Guide

Billings has not issued permits outside its limits since 2003. The state, zoning, floodplain and septic steps for the rest of Yellowstone County, plus Billings inspections.

4 min readOctober 2026
Read Guide

How building permits work in Montana

These rules apply across Montana. Each local guide above covers what is specific to that city or county: whether a certified local program or the state issues the permit, its office and contacts, local amendments, fees and inspections.

One statewide code, enforced by the state or a certified local program

Montana has one building code, adopted by the Department of Labor and Industry by rule. From 26 September 2026 it is based on the 2024 International Building, Residential, Existing Building, Mechanical and Fuel Gas Codes, the 2024 Uniform Plumbing Code and the 2023 National Electrical Code, all amended by the Administrative Rules of Montana, Title 24, chapter 301.

Enforcement is split. The department’s Building Codes Program is the authority by default; a city or county whose program the state has certified issues permits and inspects within its own area instead (MCA §50-60-106). A local government may not adopt or enforce a building code more stringent than the state’s, apart from voluntary, incentive-based energy conservation standards (MCA §50-60-301).

The state building code does not apply to residential buildings of fewer than five dwelling units (unless they serve transient guests), to farm or ranch buildings of any size, or to private garages and storage buildings for the owner’s own use, unless the local government has made the code apply to them (MCA §50-60-102). So a house may need a building permit inside a certified city and none on a rural parcel outside one. An exemption from the building permit is never an exemption from zoning, floodplain or septic rules, or from an electrical or plumbing permit.

Where the state issues the permit, the building permit must be issued before any plumbing, mechanical or electrical permit, and plan review averages about three weeks. The permit fee follows a valuation table, with plan review charged at 35 percent of the permit fee (ARM 24.301.138).

Outside certified jurisdictions, design snow loads are taken from the ASCE 7 standard through the ASCE 7 Hazard Tool, with a minimum roof snow load of 30 psf after reductions unless a Montana-licensed design professional justifies less. The department generally requires a Montana-licensed design professional for publicly owned buildings, buildings outside the conventional light-frame provisions, and buildings subject to moderate-to-severe snow or seismic loads.

⚠️ Confirm whether a permit is required, then get it before work begins. Where a permit is required, building without one exposes the job to stop-work orders, penalties, correction orders, delayed occupancy and problems at resale, refinancing or insurance. The safe first step is to confirm the authority having jurisdiction for the parcel.

The construction contractor licence, its exemptions and state trade licences

Since 1 January 2026 anyone in business as a construction contractor needs a construction contractor licence from the Department of Labor and Industry (MCA §37-45-201); contractors with an active registration on 31 December 2025 were converted to it. The department’s FAQ lists an online application and a $70 fee, and no exam. The exemptions in MCA §37-45-104 include casual or minor work under $2,500 a job, an owner working on their own property (but not one building to sell, unless they have lived there as their primary residence for the last 12 months), an owner who hires licensed contractors, and an independent contractor with no employees. That independent contractor must still hold an Independent Contractor Exemption Certificate if they work away from their own business premises, unless they carry workers’ compensation (MCA §39-71-417).

Electricians and plumbers are licensed by state boards. An individual may do electrical work on their own property or residence kept for their own use, except on a grid-tied generator (MCA §37-68-103), and the owner of a single-family home used only for their own personal use may do its plumbing (MCA §37-69-102). The department issues homeowner electrical permits, and says homeowners doing their own plumbing on a home that is not built to sell or rent need no state plumbing permit.

Electrical permits

In areas the state covers, an electrical permit is required for any installation in new construction, remodelling or repair (ARM 24.301.431). The exceptions in MCA §50-60-602 are narrow: utility signal and traffic equipment, refineries and mines, low-voltage signal, communications and fibre-optic wiring, and maintenance by electricians employed on their employer’s premises; plugging an appliance into an existing outlet is not an installation.

Sources