Skip to main content
All States

Montana Building Permit Guides

20 building permit guides for Montana jurisdictions.

How building permits work in Montana

Municipal GuideMontana

Belgrade Building Permit Guide

How building permits work in Belgrade, Montana: the City Building Department issues building and trade permits through Cityworks, with FY2027 fees, checklists, impact fees and inspection rules.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Big Horn County Building Permit Guide

Big Horn County has no building department. Hardin permits residential construction inside its limits and sends commercial buildings to the State, and County Environmental Health issues septic permits from $475.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Billings Building Permit Guide

Billings issues permits only inside its city limits, all through CityView. What needs a permit, the design criteria, the fence-height conflict, fees and the 18-month exterior rule.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Bozeman Building Permit Guide

Bozeman runs its own certified building program inside city limits. What its municipal code says about demolition, moving, contractor bonds and electrical permits and inspections.

4 min readOctober 2026
Read Guide
Municipal GuideMontana

Butte-Silver Bow Building Permit Guide

Everything contractors, builders, and developers need to get a building permit in Butte-Silver Bow, Montana - requirements, online filing paths, fees, contractor licensing, trade permits, and inspections.

9 min readJune 2026
Read Guide
Municipal GuideMontana

Carbon County Building Permit Guide

Carbon County issues Development Permits, not building permits, through one online package with the address, approach and septic applications. Red Lodge runs the only certified building program in the county.

15 min readOctober 2026
Read Guide
Municipal GuideMontana

Cascade County Building Permit Guide

Cascade County does not enforce building codes. Who does, the county Location/Conformance, floodplain, septic and road permits and their fees, plus Great Falls.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Custer County Building Permit Guide

Custer County requires a zoning conformance permit on land in its zoning districts, with site plan review decided within 30 working days. Miles City runs its own building department and the State covers the building code elsewhere.

13 min readOctober 2026
Read Guide
Municipal GuideMontana

Fergus County Building Permit Guide

Fergus County requires a $50 Development Permit before building, which assigns the address and flags floodplain, road and septic needs. Lewistown issues building permits inside the city and the State handles the building code elsewhere.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Gallatin County Building Permit Guide

Everything contractors, builders and developers need for a Gallatin County building permit — who issues it (the state or a certified city, never the county), county land use permits, fast Bozeman-area growth, the uniform Montana code, snow and seismic loads, and how fees work.

11 min readAugust 2026
Read Guide
Municipal GuideMontana

Great Falls Building Permit Guide

Great Falls issues permits inside city limits only. Plan sets, geotechnical reports, review times, the 2023 fee schedule and its 2.5% yearly increase, and how to book inspections.

4 min readOctober 2026
Read Guide
Municipal GuideMontana

Hill County Building Permit Guide

Hill County issues a $75 zoning permit in the City-County planning area and sewage permits, Havre issues building permits in the city with plan review added to the fee, and trade permits come from the State.

11 min readOctober 2026
Read Guide
Municipal GuideMontana

Jefferson County Building Permit Guide

Jefferson County, Boulder and Whitehall have no certified building program. The County issues $75 site permits, septic and encroachment permits, the towns issue zoning permits, and the State handles building-code and trade permits.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Lewis and Clark County Building Permit Guide

Outside Helena and East Helena, the state issues building permits and the county handles addresses, roads and floodplain. Which permits apply, the county fees, and Helena’s office.

5 min readOctober 2026
Read Guide
Municipal GuideMontana

Livingston Building Permit Guide

How building permits work in Livingston, Montana: the City Building Department permits and inspects inside city limits, fees follow Resolution 5181, and electrical, plumbing and HVAC permits come from the State.

12 min readOctober 2026
Read Guide
Municipal GuideMontana

Missoula Building Permit Guide

Missoula’s Building Division covers the city limits only. Filing on Accela, design criteria, when fees are paid under the new 2026 schedules, and three ways to book inspections.

4 min readOctober 2026
Read Guide
Municipal GuideMontana

Missoula County Building Permit Guide

Everything contractors, builders and developers need for a Missoula County building permit — the certified county Building Division outside Missoula city limits, the City of Missoula program inside them, the uniform Montana code, and how fees work.

10 min readAugust 2026
Read Guide
Municipal GuideMontana

Richland County Building Permit Guide

Richland County, Montana is a State-certified building jurisdiction. Its Building Department in Sidney permits and inspects construction outside Sidney city limits, with fees from a valuation table plus a 35% plan review fee; trade permits come from the State.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Whitefish Building Permit Guide

How building permits work in Whitefish, Montana: the City Planning & Building Department permits building and trade work inside city limits, applications go through the Citizen Portal, and inspections need 24 hours' notice.

14 min readOctober 2026
Read Guide
Municipal GuideMontana

Yellowstone County Building Permit Guide

Billings has not issued permits outside its limits since 2003. The state, zoning, floodplain and septic steps for the rest of Yellowstone County, plus Billings inspections.

4 min readOctober 2026
Read Guide

Counties without a county building department

These 9 Montana counties issue no building permits of their own. Building permits come from the cities and towns inside them, or from the state. County offices may still handle septic, floodplain, road and address permits.

Beaverhead County

Beaverhead County, Dillon and Lima run no building-code program, so state permits cover commercial work while the County’s Land Services office in Dillon handles floodplain, Big Hole River and airport-area permits.

Flathead County

Flathead County has no building department. Kalispell, Whitefish and Columbia Falls run certified programs inside their limits; the state covers the rest, while the county handles zoning, floodplain, lakeshore, septic and roads.

Town guides: Whitefish

Glacier County

Glacier County has no building or planning department; Cut Bank issues building permits inside the city, and outside the Blackfeet Reservation the State permits commercial buildings in the rest of the county.

Lake County

Lake County has no building department: its Planning Department issues zoning, lakeshore, floodplain and building notification permits through Cloudpermit, and the State of Montana permits commercial buildings outside Polson and Ronan.

Lincoln County

Lincoln County Planning in Libby permits floodplain and lakeshore work and reviews subdivisions; building-code permits come from the State of Montana, except for houses inside Libby and Troy, which those cities permit themselves.

Park County

Park County issues zoning compliance and floodplain permits from its Planning Department in Livingston but no building permits; outside the City of Livingston the State of Montana is the building-code authority.

Town guides: Livingston

Ravalli County

Ravalli County has no building department. Its only construction permit is the floodplain development permit from the Planning Department in Hamilton; septic permits come from Environmental Health and building-code permits from the State.

Roosevelt County

Roosevelt County issues no building permits. No city or county program here is state-certified, so building-code permits come from the State of Montana, and Wolf Point, Culbertson, Bainville and Froid each ask for a city or town permit of their own.

Sanders County

Sanders County Land Services in Thompson Falls handles floodplain, airport and road encroachment permits and Environmental Health permits wells and septic systems; no county office issues building permits, which are a State matter here.

How building permits work in Montana

These rules apply across Montana. Each local guide above covers what is specific to that city or county: whether a certified local program or the state issues the permit, its office and contacts, local amendments, fees and inspections.

One statewide code, enforced by the state or a certified local program

Montana has one building code, adopted by the Department of Labor and Industry by rule. From 26 September 2026 it is based on the 2024 International Building, Residential, Existing Building, Mechanical and Fuel Gas Codes, the 2024 Uniform Plumbing Code and the 2023 National Electrical Code, all amended by the Administrative Rules of Montana, Title 24, chapter 301.

Enforcement is split. The department’s Building Codes Program is the authority by default; a city or county whose program the state has certified issues permits and inspects within its own area instead (MCA §50-60-106). A local government may not adopt or enforce a building code more stringent than the state’s, apart from voluntary, incentive-based energy conservation standards (MCA §50-60-301).

The state building code does not apply to residential buildings of fewer than five dwelling units (unless they serve transient guests), to farm or ranch buildings of any size, or to private garages and storage buildings for the owner’s own use, unless the local government has made the code apply to them (MCA §50-60-102). So a house may need a building permit inside a certified city and none on a rural parcel outside one. An exemption from the building permit is never an exemption from zoning, floodplain or septic rules, or from an electrical or plumbing permit.

Where the state issues the permit, the building permit must be issued before any plumbing, mechanical or electrical permit, and plan review averages about three weeks. The permit fee follows a valuation table, with plan review charged at 35 percent of the permit fee (ARM 24.301.138).

Outside certified jurisdictions, design snow loads are taken from the ASCE 7 standard through the ASCE 7 Hazard Tool, with a minimum roof snow load of 30 psf after reductions unless a Montana-licensed design professional justifies less. The department generally requires a Montana-licensed design professional for publicly owned buildings, buildings outside the conventional light-frame provisions, and buildings subject to moderate-to-severe snow or seismic loads.

⚠️ Confirm whether a permit is required, then get it before work begins. Where a permit is required, building without one exposes the job to stop-work orders, penalties, correction orders, delayed occupancy and problems at resale, refinancing or insurance. The safe first step is to confirm the authority having jurisdiction for the parcel.

The construction contractor licence, its exemptions and state trade licences

Since 1 January 2026 anyone in business as a construction contractor needs a construction contractor licence from the Department of Labor and Industry (MCA §37-45-201); contractors with an active registration on 31 December 2025 were converted to it. The department’s FAQ lists an online application and a $70 fee, and no exam. The exemptions in MCA §37-45-104 include casual or minor work under $2,500 a job, an owner working on their own property (but not one building to sell, unless they have lived there as their primary residence for the last 12 months), an owner who hires licensed contractors, and an independent contractor with no employees. That independent contractor must still hold an Independent Contractor Exemption Certificate if they work away from their own business premises, unless they carry workers’ compensation (MCA §39-71-417).

Electricians and plumbers are licensed by state boards. An individual may do electrical work on their own property or residence kept for their own use, except on a grid-tied generator (MCA §37-68-103), and the owner of a single-family home used only for their own personal use may do its plumbing (MCA §37-69-102). The department issues homeowner electrical permits, and says homeowners doing their own plumbing on a home that is not built to sell or rent need no state plumbing permit.

Electrical permits

In areas the state covers, an electrical permit is required for any installation in new construction, remodelling or repair (ARM 24.301.431). The exceptions in MCA §50-60-602 are narrow: utility signal and traffic equipment, refineries and mines, low-voltage signal, communications and fibre-optic wiring, and maintenance by electricians employed on their employer’s premises; plugging an appliance into an existing outlet is not an installation.

Sources