Inside Belgrade city limits, the City’s Building Department issues building, electrical, mechanical and plumbing permits, and applications go through the Cityworks online portal. The FY2027 Master Fee Schedule, in effect since August 1, 2026, sets the building permit fee at 0.88% of valuation and the plan review fee at 0.36%, and a new single-family home also pays $13,005 in impact fees. Inspections called or emailed in by 3:00 p.m. are scheduled for the next day.
What needs a permit in Belgrade?
The City’s rule is broad. An owner or authorized agent who plans to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building, or to install, alter, repair or replace an electrical, gas, mechanical or plumbing system, has to apply to the Building Department first.
Building Department
- New homes, townhomes, duplexes and accessory dwelling units
- Commercial and multi-family buildings
- Additions, alterations and repairs
- Moving or demolishing a building
- Changes of occupancy
- Electrical, mechanical, gas and plumbing work
- Fire sprinkler, fire alarm and kitchen hood systems
- Solar installations
Planning and Zoning
- Minor Land Use Permit: fences, decks, patios, sheds, greenhouses and similar accessory structures
- Standard Land Use Permit: homes and accessory structures
- Major Land Use Permit with site plan review: multi-family, non-residential, institutional and industrial projects
- Sign permits
- Short-term rental permits
The one exemption the City lists in its building FAQ is a residential accessory building of less than 200 square feet. A shed that size can still need a Minor Land Use Permit, which confirms the use, the height and that the structure is outside the setback.
Who issues permits in Belgrade?
Permitting sits in the Community & Economic Development Department, which has 3 divisions: Building, Planning and Zoning, and Permits and Licensing. Montana certifies the City for building, plumbing, electrical, mechanical and pool codes, so no state building or trade permit is needed for private work in town. Lucas Sobeck is the Chief Building Official.
| Detail | Information |
|---|---|
| Building permits and inspection scheduling | 406-388-3560; building@belgrademt.gov |
| Chief Building Official | Lucas Sobeck, 406-388-3564 |
| Permits and Licensing Division | 406-388-3560; permits@belgrademt.gov |
| Planning and Zoning | 406-388-3760 ext. 2; planning@belgrademt.gov |
| Public counter | 91 East Central Avenue, Belgrade, MT 59714 |
| Counter hours | Monday to Friday, 9 a.m. to 3 p.m. |
| Online portal | Cityworks |
Short on time to read all of this?
Get a free quote →The certification covers the city limits only. Gallatin County is not on the State’s certified list, so on land just outside Belgrade the state Building Codes Program is the building-code authority. Fire inspections follow the same line: the City’s Building Department handles them inside the limits, and Central Valley Fire District still does for property outside Belgrade but inside the district.
Cityworks and the applications Belgrade uses
The City takes permit and licence applications online through Cityworks. The portal shows the status of an application in real time, lists the fees charged against it and holds the approved documents for download. A posted Online Portal User Guide walks through account set-up.
- Building, electrical, mechanical and plumbing permits: residential applications are in the portal; the Building Department answers permit questions on 406-388-3560.
- Land Use Permits and other planning applications: most are in Cityworks. If one is missing, the Planning office supplies it by email, which is how a Minor Land Use Permit for a fence is requested.
- Sign permits: Planning publishes a Sign Permit User Guide.
- Business licences: filed in the same portal and handled by the Permits and Licensing Division.
- Annexation petition and appeal form: PDFs on the Planning applications page.
Before formal plans are drawn, Planning runs Development Review Committee meetings where an applicant can go over a concept with the City departments involved.
Belgrade permit fees (FY2027)
Resolution 2026-10 set the Master Fee Schedule for fiscal year 2027, and the fees took effect on August 1, 2026. The City updates the schedule every year with its budget. Building fees are a straight percentage of valuation rather than a sliding table.
| Item | Fee |
|---|---|
| Building permit | Valuation x 0.0088 |
| Plan review | Valuation x 0.0036 |
| Demolition permit | $25 |
| Addressing | $40 per address or unit number |
| Minor Land Use Permit | $150 |
| Standard Land Use Permit (homes and accessory structures) | The greater of $400 or 0.25% of the market value of construction, excluding land; $5,000 maximum |
| Major Land Use Permit (includes site plan review) | The greater of $400 or 0.25% of the market value of construction, excluding land; $25,000 maximum |
| Land Use Permit after the fact | Double the base fee |
| Engineering review, single-family residential site | $179 |
| Engineering review, accessory dwelling unit | $123 |
| Engineering review, garage or residential addition | $92 |
| Engineering review, shed, carport or deck under 300 sq ft | $61 |
| Driveway approach, single | $123 |
| Sign permit | $150 |
| Impact fees, single-family detached home | $13,005 per unit: $4,786 water, $2,709 sewer, $5,238 streets, $272 fire |
| Impact fees, all other housing types | $8,402 per unit |
Not sure this scope needs a permit?
Get a free quote →For example, a project valued at $300,000 has a building permit fee of $2,640 and a plan review fee of $1,080; the schedule lists them as 2 separate charges. Non-residential impact fees are set by water meter size and by floor area.
The same schedule carries fines: $500 per day for starting work without a permit, for working under a stop work order or for moving in without a Certificate of Occupancy, and $75 when an inspection is not ready or fails again after the second visit.
Electrical, plumbing and mechanical permits in Belgrade
Trade permits come from the City’s Building Department, not from the State, and are priced in the same FY2027 schedule.
| Permit | Fee |
|---|---|
| Electrical, single-family home, service up to 200 A | $200 |
| Electrical, single-family home, 201 to 400 A | $380 |
| Electrical, single-family home, 401 to 600 A | $600 |
| Electrical, single-family home, 601 A and up | $800 |
| Electrical, 1 added circuit or piece of equipment | $45 |
| Electrical, 2 or 3 added circuits | $70 |
| Electrical, 4 or more circuits | $100, or $120 with a change of service or interior panel |
| Electrical, accessory building panel up to 200 A | $80 |
| Electrical, alternate energy source | $65 added |
| Plumbing, each fixture or trap | $10 |
| Plumbing, new water heater | $25 |
| Plumbing, each connection to the water or wastewater system | $20 |
| Single-family residential gas line | $48 |
| Mechanical system costing up to $10,000 | $48 for the first $1,000 plus $14 for each additional $1,000 |
| Mechanical system costing $10,001 to $50,000 | $166 for the first $10,000 plus $9 for each additional $1,000 |
Rather talk it over?
Call 1-855-478-4290 →Commercial electrical permits are charged on project cost, starting at $45 for the first $500 plus 6% of the balance up to $1,000, and a building with more than 12 dwelling units needs a commercial electrical permit. Fire protection and alarm plans go through fire plan review, which has a $125 base fee and $518.75 for a kitchen hood system review.
Plan sets and checklists
The Building Department will not start plan review until a submittal has been accepted as complete, and it does not accept deferred plans or documents on residential jobs. The residential checklist is filled in by the Montana-licensed design professional of record, or by the applicant where none is required, and goes in with the application.
House, duplex, townhome or ADU
- Plans at 1/4 inch per foot, fully dimensioned, on 24 x 36 sheets (11 x 17 for remodels); digital is preferred
- Cover sheet with codes, square footage and scope
- Site plan with setbacks, lot coverage, easements, parking and utility locations
- Foundation plan, floor plans, elevations and building sections
- Wall bracing plan, floor and roof framing plans and truss drawings
- Energy calculations, prescriptive or REScheck
- Preliminary soils report, site drainage and stormwater application
- Water fixture count and the sump pump policy
- Planning and zoning approval letters where they apply
Commercial or multi-family
- Digital plans and 1 hard copy
- General information pages and a site plan with utilities and water line size
- Architectural, structural, electrical, plumbing and mechanical plans
- Site drainage plan and energy calculations
- 2 sets of structural calculations, stamped and wet signed
- Fire sprinkler and alarm layouts, hood calculations and accessibility details where they apply
- Stamp of a Montana engineer or architect, except on small residential buildings the checklist exempts
Solar submittals need a structural engineer’s stamp, engineering calculations and a one-line diagram, with roof setbacks of 3 feet at the eaves on one side and 1.5 feet at ridges, hips and valleys. The City’s design criteria sheet gives a 46 psf ground snow load, a 41 psf roof snow load, a 115 mph wind speed and footings at least 36 inches deep for one story or 48 inches for two. It also requires a site-specific geotechnical analysis at permit application.
Rather not deal with the building department?
Get a free quote →How to apply: 6-step Belgrade process
Use the zoning map on the City’s GIS page, which shows the city limits and the zoning district.
Find out from Planning (406-388-3760 ext. 2) which Land Use Permit the project needs and whether a pre-application or Development Review Committee meeting applies.
Fill in the residential, commercial and multi-family or solar checklist and assemble every plan sheet it names.
Create an account with the Online Portal User Guide, submit the application and upload the plans.
Incomplete submittals come back at prescreen; once accepted, answer review comments and pay the fees shown in the portal.
Request inspections by phone or email before 3:00 p.m. for the next day, then hand in the blower door test and energy sticker at final.
Belgrade inspections and occupancy
Inspections are scheduled by phone (406-388-3560) or by email only; inspectors do not book future inspections on site. The cut-off for a next-day inspection is 3:00 p.m., and a later request is processed the following business day. A failed inspection has to be rescheduled and re-inspected, and the City does not accept photographs in place of a re-inspection.
The City’s required-inspection sheets list these stages for a house:
- Concrete: footings, foundation walls, damp proofing, structural slabs and structural masonry.
- Building: shear walls, rough framing, roof dry-in, insulation and sheetrock screws.
- Plumbing, electrical and mechanical: underground and rough-in work, the temporary meter pole, ductwork, gas lines and the gas meter bar.
- Fire: fire walls, draft stopping and fire-resistant penetrations.
- Finals: building, plumbing, electrical and mechanical.
Public Works, not the Building Department, schedules water line, sewer line, bacteria test, sidewalk and driveway approach inspections. Occupancy is granted after the final inspection and once the blower door test and energy sticker are submitted; duct test results are also needed when ducts run through unconditioned space. Commercial projects add a final plan set showing changes made during construction and the State’s inspection results for elevators and boilers.
Local Belgrade details that matter
Code editions: the City’s Adopted Codes sheet, its design criteria and its solar checklist still cite the 2021 International Codes, the 2021 Uniform Plumbing Code and the 2020 National Electrical Code, adopted as of August 8, 2022. The State’s 2024 editions, with the 2023 edition of the electrical code, took effect on September 26, 2026, and state rules give a certified city 90 days from the State’s notice to adopt them.
Want this handled start to finish?
Get a free quote →Fire inspections: after a state rule change, the City began inspecting new construction in April 2025 and has since added existing buildings. The Chief Building Official also serves as Fire Marshal.
Fences: a fence needs a Minor Land Use Permit. Side and rear yard fences may be up to 6 feet high; a fence inside the front yard setback is limited to 4 feet.
Soils: the final geotechnical observation report has to be submitted before the footing inspection.
Short-term rentals: a new short-term rental needs a fire inspection from the Building Department and a City permit ($250 initial, $150 renewal); the City says the permit application is not yet live in the Cityworks portal.
Planning Commission: it meets on the last Monday of each month at 6 p.m. in the Community Room of the Belgrade Community Library, 205 East Main Street.
Montana building code
Montana adopts one building code, based on the 2024 International Codes from 26 September 2026; a certified local program or the state Building Codes Program enforces it, and the state code does not reach houses of fewer than five units, farm and ranch buildings or private garages unless a local government has made it apply to them. How Montana’s statewide code works
Official permitting links for Belgrade
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
- Montana certified local government jurisdiction list
- Montana current construction codes
- Checklists, inspections, fire inspection and fee schedule
- Building and trade permit categories
- Cityworks online applications and portal help
- Belgrade Building Department and chief official
- Belgrade Master Fee Schedule, fiscal year 2027
- Belgrade design criteria and adopted codes
- Belgrade residential submittal checklist
- Belgrade commercial and multi-family submittal checklist
- Belgrade required inspections for residential projects
- Belgrade Planning and Zoning
Inspections are where schedules slip.
Get a free quote →Belgrade permit FAQs
How much is a building permit in Belgrade?
0.88% of the project valuation, plus a plan review fee of 0.36%, under the FY2027 Master Fee Schedule. On a $300,000 valuation that is $2,640 and $1,080. Zoning, engineering review, trade permit and impact fees are separate.
What are Belgrade’s impact fees for a new house?
$13,005 for a single-family detached home: $4,786 water, $2,709 sewer, $5,238 streets and $272 fire. Other housing types pay $8,402 per unit.
Do I need a permit for a fence in Belgrade?
Yes, a Minor Land Use Permit from Planning, which costs $150. Fences can be 6 feet high in side and rear yards and 4 feet inside the front yard setback.
Do I need a permit for a shed?
A residential accessory building under 200 square feet is exempt from a building permit, but sheds are on the list of structures that need a Minor Land Use Permit.
Who issues electrical and plumbing permits in Belgrade?
The City’s Building Department. Belgrade is state-certified for electrical, plumbing and mechanical work, so those permits are not taken out with the State inside city limits.
How do I schedule an inspection?
Call 406-388-3560 or email the Building Department by 3:00 p.m. for an inspection the next day.
What happens if I start work without a permit?
The fee schedule sets a fine of $500 per day, and a Land Use Permit applied for after the fact costs double the base fee.
Where is the Belgrade permit counter?
At 91 East Central Avenue, open Monday to Friday from 9 a.m. to 3 p.m.
Simplify Belgrade permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Montana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Belgrade sooner?
Let Alliance prepare, file, and track your Belgrade permits while your crew stays on the job.
More Montana permitting guides
This guide is provided by Alliance Permitting for general information about Belgrade permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.