In Jasper (Dubois County), the Department of Community Development & Planning on the second floor of City Hall, 610 Main Street (812-482-4255, weekdays 7:30 a.m. to 4:00 p.m.), issues the improvement location permit that the city calls its building permit, plus fence, pool, sign, demolition and grading permits. Its reach covers the city and the two-mile area of the Jasper Plan Commission. A new single- or two-family home costs a $200 permit, review takes seven business days once every form and drawing is in, and work must start within six months of issue.
What requires a permit in Jasper?
The city’s permit brochure describes the improvement location permit (ILP) as required for all construction, whether residential, commercial, industrial or institutional: any new structure, and any remodel that expands the footprint of an existing building. The same permits are needed in the two-mile area outside the city limits that the Jasper Plan Commission controls.
Permit needed
- New buildings and additions that expand a footprint (ILP)
- Detached garages and storage sheds of any size (ILP)
- Sunrooms and pergolas (ILP)
- Every type of fence (fence permit)
- Pools over 36 inches deep, above or in ground (pool permit plus a fence permit)
- Permanent and temporary signs
- Any full or partial demolition
- Grading or land disturbance of half an acre to one acre
Placement limits
- No structure, temporary or permanent, on a city or utility easement
- Fences may not sit on a city or utility easement
- Building materials and equipment may not be stored on any street
- Construction dirt and debris must be cleared from the street at the end of each workday
Right-of-way work and stormwater drainage need separate permits from the city’s engineering staff, and horizontal directional drilling has its own permit.
What Jasper decides and what the state holds
Jasper writes its land rules into a Unified Development Ordinance, which it updates every year, and sets permit and petition fees. The department also handles floodplain regulation under the city’s 1993 Flood District and Flood Damage Prevention Ordinance, site plan review, subdivisions and tax phase-ins. Commercial plans are coordinated with the Fire Chief, who serves as the city’s code enforcement official, for the state fire code. The state Construction Design Release is required before construction of any Class 1 building, and the department links the state plan review office from its Building and Construction page.
Short on time to read all of this?
Get a free quote →Jasper building department: who handles permitting
The department is the city’s one-stop office for land development: zoning and variances, construction approval, subdivisions, site plan review, floodplain rules, economic development and redevelopment. It issues the ILP and the other construction permits, prepares cases for the Plan Commission and Board of Zoning Appeals, and serves as the local floodplain manager. The Jasper Plan Commission, an 11-member board, hears rezoning and subdivision requests for the city and its two-mile jurisdiction; the five-member BZA hears variances, special exceptions, home occupations and appeals. Both meet on the first Wednesday of the month in the Council Chambers, the BZA at 6:30 p.m. and the Plan Commission at 7:00 p.m. or right after.
| Detail | Information |
|---|---|
| Office | Community Development & Planning, Jasper City Hall, second floor, 610 Main St., PO Box 29, Jasper, IN 47547 |
| Phone / fax | 812-482-4255 / 812-482-7852 |
| Hours | Monday to Friday, 7:30 a.m. to 4:00 p.m. |
| Applications | Fill in, scan and e-mail to the department’s planning technician address, or file in person |
| Fire code and code enforcement | Fire Chief / Code Enforcement Official, 309 E. 6th St.; 812-482-1741 |
| Septic outside the sewer system | Dubois County Health Department, 1187 S. St. Charles St.; 812-481-7050 |
| Flood insurance | Participates in the National Flood Insurance Program (community 180055); current map October 16, 2014 |
Beyond the two-mile planning area, land is in unincorporated Dubois County, which has no county building permit in its published pages; the county created an advisory plan commission in October 2026 for those areas and confirmed that Jasper keeps its existing planning jurisdiction.
Jasper permit types
The Permits and Forms page posts each application as a fillable form, several also in Spanish: the ILP (building), fence, pool with fence, permanent sign, demolition, grading and land disturbance, banners for not-for-profits, temporary use and event, a solar panel packet, right-of-way and stormwater drainage permits, and the variance, special exception, plat, PUD and rezoning packets.
Residential permits
The ILP form asks whether the work is inside or outside the city limits, whether the lot is in a flood hazard area, the size, height, stories, bedrooms and bathrooms, the exterior material, and the general, electric, plumbing and gas contractors. It also records new utility service: electric from the City of Jasper or the REMC, water from the city or a private source, wastewater to the city, the Ireland Conservancy or a private system (attach the approved county septic permit), and city natural gas. The city recommends a check flap valve on the sewer lateral. A site plan must show the lot and structure dimensions, the footprint of new and existing buildings, distances to all four property lines, easements, the driveway, street names and a north arrow. The office records the property’s zoning, the fee, the permit number and the Administrator’s approval on the form.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Industrial, commercial, institutional and apartment projects use the same ILP and are priced by square footage, with apartments also charged per unit. They also need site plan review by the department, coordination with the Fire Chief on fire code items, and the state design release for Class 1 work before construction.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the permit
- Zoning. Use, setbacks, height and signs must meet the UDO. Variances and special exceptions go to the BZA, rezonings to the Plan Commission and Common Council; each public hearing needs a 10-day notice in the Herald. A home occupation also needs a BZA public hearing, while plat and plan review carry no separate charge.
- Stake the site. Property corners and the proposed structure must be staked or flagged before you submit, because staff visit the site to check the application.
- Floodplain. Check the flood map with the department’s floodplain manager; building in a floodway also needs the IDNR Division of Water.
- Septic. Outside city sewer service, bring the approved Dubois County septic permit.
- Right-of-way and drainage. File these with the city engineer’s office.
Jasper permit fees
Fees come from the department’s posted Permit Fees sheet and are paid when the permit is approved, at City Hall or online with a 2.49% processing fee.
| Work | Fee |
|---|---|
| New single- or two-family home | $200 base rate |
| Residential accessory building or addition | $50 base rate + $0.05 per sq ft |
| Apartment building | $200 base rate + $100 per unit + $0.10 per sq ft |
| Commercial or industrial construction | $200 base rate + $0.08 per sq ft |
| Commercial or industrial accessory building | $100 base rate + $0.08 per sq ft |
| Commercial or industrial building addition | $0.03 per sq ft (minimum $150, maximum $1,500) |
| Fence | $35 |
| Swimming pool, above ground / in ground (fence permit also required) | $50 / $75 |
| Sign (surface-mounted or free-standing) | $1 per sq ft |
| Demolition | $50 |
| Grading / land disturbance | No charge |
Rather talk it over?
Call 1-855-478-4290 →Worked examples: a 600-square-foot detached garage costs $50 + $30 (600 × $0.05) = $80; a 10,000-square-foot commercial building costs $200 + $800 = $1,000; a 12-unit, 12,000-square-foot apartment building costs $200 + $1,200 + $1,200 = $2,600.
Plan commission and BZA fees: variance or special exception $150, rezoning $200, administrative appeal $150, minor plat $100 plus $1 per lot, major plat $300 plus $25 per acre (residential) or $50 per acre (commercial or industrial), amendments or vacations $100 residential or $300 commercial, and special meetings $150, plus the cost of the legal notice and certified mail. A printed zoning ordinance book costs $25 and the comprehensive plan book $20. The two posted lists differ on planned unit developments: $200 on the Permit Fees sheet and $300 plus $25 per acre on the Planning and Zoning page, so confirm the PUD fee before filing.
Trade work and who may do it in Jasper
Jasper’s permit pages list no separate electrical, plumbing or mechanical permits; the ILP form instead names the general, electric, plumbing and gas contractors on the job. Utilities are a city matter: Jasper runs electric, water, wastewater and natural gas service, and new service is requested on the same ILP form with amperage, voltage and phase, meter size, sprinkler and hydrant details, drains and grease traps, and gas load in BTUs. The form also asks whether the building will have a sump pump and where it will discharge, and whether a garbage grinder is planned.
- Plumbing contractors hold state licenses from the Indiana Plumbing Commission.
- Fire protection. Sprinkler systems are noted on the ILP and reviewed with the Fire Chief for the state fire code.
- Solar. Solar panels have their own packet from the department.
- Digging. Call 811 at least two full working days before excavating, as the department reminds applicants.
Rather not deal with the building department?
Get a free quote →How to apply for a permit in Jasper
Download the ILP, fence, pool, sign, demolition or grading form from the Permits and Forms page, or pick one up at City Hall.
Review the zoning map and the UDO’s setbacks and height limits, and file any variance before you apply.
Flag the property corners and the outline of the new structure.
Fill in every field, the contractors and the utility section, and attach a site plan with all four setbacks.
Scan and e-mail it to the department or bring it to City Hall; right-of-way and drainage permits go to the city engineer.
Staff visit the site, then issue the permit with job-site placards; fees are paid at approval.
Start within six months and finish within two years; staff make a post-construction site visit.
Review, corrections and what causes delay
The seven-business-day review clock starts only when every required form and drawing has been received. Missing setbacks on the site plan, an unstaked site, a missing septic permit for a private system, and work planned on an easement are the gaps the city’s own forms warn about. The online UDO may lag the annual updates, so call the department if a standard looks out of date.
Site visits and closeout in Jasper
Jasper’s permit process is built around two staff visits. Before the permit is issued, staff visit the staked site to verify the application; after construction, staff make a post-construction visit to verify the project matches what was approved, and the owner is notified of any discrepancy. The job-site placard issued with the permit should be posted while work is under way.
- Permit life: valid for six months from issue to start work; two years to complete the project.
- Fire code: commercial, industrial and subdivision layouts are reviewed with the Fire Chief’s office.
- Septic: private systems are inspected by the Dubois County Health Department, including a backfill inspection before final approval.
- Class 1 buildings follow the state design release, with released plans kept on site.
Want this handled start to finish?
Get a free quote →Indiana building code
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Jasper building permit FAQ
Do I need a permit for a shed in Jasper?
Yes. The city requires an improvement location permit for detached garages and storage sheds of any size; the fee is $50 plus $0.05 per square foot.
Do I need a permit for a fence in Jasper?
Yes, for every type of fence. The permit costs $35, and fences may not be placed on a city or utility easement.
How much is a permit for a new house?
$200 for a single- or two-family home under the posted Permit Fees sheet.
How long does a Jasper permit take?
Seven business days after all required forms and drawings are submitted.
Does Jasper issue permits outside the city limits?
Yes, within the two-mile jurisdictional area of the Jasper Plan Commission. Beyond it, the land is in unincorporated Dubois County.
Do I need a permit for a swimming pool?
Yes for any pool holding more than 36 inches of water, above or in ground, and a fence permit is required with it. The pool permit is $50 above ground or $75 in ground, plus $35 for the fence.
Can I pay for a permit online?
Yes. Fees are due when the permit is approved and can be paid online by Visa, Mastercard or Discover with a 2.49% processing fee, or at City Hall.
How do I get an address for a new building?
Ask Community Development & Planning: its Building and Construction page links the city’s New Address Request service alongside the permit forms, the right-of-way permit and the horizontal directional drilling permit.
Is this the same as Jasper County?
No. The City of Jasper is in Dubois County, and the Dubois County Courthouse and Health Department are in Jasper; Jasper County is a different county with its own offices.
Permit search and official resources
Permit files for properties in the city and the two-mile area are kept by Community Development & Planning; call 812-482-4255 or visit City Hall to ask for a permit history. Plan Commission and BZA agendas and minutes are posted in the city’s document center.
Inspections are where schedules slip.
Get a free quote →- Jasper Community Development & Planning
- Building and construction permits and fees
- Permits and forms (applications, packets, payment)
- Jasper Permit Fees sheet
- Improvement Location Permit (building) application
- The Permit Process brochure
- Planning and zoning: Plan Commission and BZA
- Jasper floodplain management
- Jasper code enforcement and fire code review
- Dubois County septic system procedures
Simplify Jasper permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Jasper sooner?
Let Alliance prepare, file, and track your Jasper permits while your crew stays on the job.
More Indiana permitting guides
Dubois County
Read guide →Pike County
Read guide →Spencer County
Read guide →Jasper County Building Permit Guide
Read guide →Jay County Building Permit Guide
Read guide →Jefferson County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Jasper permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.