Dubois County, Indiana Building Permit Guide

To get a building permit in Dubois County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Unincorporated Dubois County has no county building permit program in its published pages; owners file an assessment notice and get septic and driveway approvals, while Jasper, Huntingburg and Ferdinand permit their own areas.

Authority: Dubois County Assessor and Health DepartmentZoning: Draft county ordinance, hearing Nov. 17, 2026Phone: 812-481-7010
Before you build
Notice of Assessment RegistrationAssessor, 812-481-7010
Septic
Health Department permit$125 sewage permit; 812-481-7055
County zoning
Draft onlyPlan commission created Oct. 19, 2026
Flood insurance
County not in NFIPJasper participates

Dubois County does not publish a county building or improvement location permit for unincorporated land. Its “before construction” sheet instead sends owners to four offices: the Auditor for subdivision approval (812-481-7000), the Health Department for a septic permit (812-481-7055), the Highway Department for driveway placement (812-482-5505) and the Assessor, where a Notice of Assessment Registration and the builder’s plans are filed before work starts (812-481-7010). That may change: the county created an Advisory Plan Commission on October 19, 2026 and holds a public hearing on a draft zoning ordinance on November 17, 2026. Jasper, Huntingburg and Ferdinand issue their own permits.

What requires a permit in unincorporated Dubois County?

Outside the cities and towns and their planning areas, the county’s own pages show approvals rather than a building permit. The Notice of Assessment Registration (State Form 786) is the filing that reaches the most projects: an owner or agent must file it with the County Assessor before demolishing, structurally modifying or improving property, unless the work needs a permit from the state or a local government, or costs $500 or less. Failing to file when required carries a $100 civil penalty under IC 6-1.1-5-15.

Assessment notice covers

  • Building or placing a house, outbuilding, swimming pool or other yard structure
  • Extending a building up or out, including patios
  • Major remodeling, including finishing an attic or basement
  • Adding a fireplace, central air, central heating, commercial paving, a bathtub, sink, toilet or water heater
  • Demolition or structural changes

Other county approvals

  • Any planned division of land: approved under the county subdivision ordinance before building
  • Septic system: Health Department permit before construction of a house or commercial building
  • New driveway onto a county road: Highway Department approval of placement
  • Rural 911 address for a new building outside the towns

The Assessor’s information sheet asks for the number of bedrooms and full and half baths, extra plumbing fixtures, the garage and basement type, plumbing roughed in for later finishing, exterior finish, decks, patios, sheds and pools, cathedral ceilings, outside dimensions and the number of floors; a geothermal system needs a copy of the installer’s certification.

What the county decides and what the state holds

Buildings used by the public, by three or more tenants or by employees are Class 1 structures, and the state Construction Design Release is required before construction anywhere in the county, with or without a local permit. One- and two-family homes are permitted locally only where an ordinance requires it, and the county’s published ordinances and forms include none for unincorporated land. The county does decide subdivisions (ordinance passed July 2, 2018), septic rules through the Board of Health, county-road driveways and, if adopted, zoning.

Short on time to read all of this?

Get a free quote →
⚠️ County zoning is pending, not adopted. The draft zoning ordinance (redline dated November 13, 2026) names December 15, 2026 as its effective date and the planning schedule shows a County Commissioners adoption meeting on December 7; until it is adopted, it does not apply.

Dubois County building department: who handles permitting

Responsibility is split by place. The three planning jurisdictions keep their own rules, and the new county plan commission’s power is limited by Ordinance 2026-21 to unincorporated areas; no city or town is under it unless it elects to join. The county’s organizational slides add that Jasper, Huntingburg and Ferdinand keep their existing planning areas outside their limits, and the draft zoning ordinance excludes those areas too. The commission held its organizational meeting on October 27, 2026, where a draft county comprehensive plan was also presented; the plan sets policy, while zoning and subdivision ordinances are the enforceable rules. Its next meeting, which includes the public hearing on the proposed zoning ordinance, is set for November 17, 2026 at 6:00 p.m. in the Courthouse Annex Commissioner/Council Room, 602 Main Street, Jasper.

Who issues permits in each Dubois County community
PlaceWho issues building or location permitsLink
Jasper (city, pop. 17,279)Community Development & Planning, 610 Main St.; improvement location permits inside the city and its two-mile planning area; 812-482-4255Jasper guide
Huntingburg (city, pop. 6,522)City Planning department under the Huntingburg Unified Development Ordinance; City Hall, 508 E. 4th St.; 812-683-2211Huntingburg Planning
Ferdinand (town, pop. 2,247)Town zoning department, Town Hall, 2065 Main St.; building/location improvement permits, $10 to $100 by value and district (Ordinance 1997-03); 812-367-2280 ext. 104Ferdinand permits
Holland and Birdseye (towns)Ask the town office which office permits work there–
Unincorporated countyThe county publishes no building permit; Assessor notice, septic and driveway approvals; county zoning pendingCounty sheet

Not sure this scope needs a permit?

Get a free quote →
County offices for a building project
OfficeRole and contact
AssessorNotice of Assessment Registration with construction plans before work starts; 812-481-7010
Health DepartmentSeptic permits, soil evaluations and installer registration; 1187 S. St. Charles St., Jasper; 812-481-7050 (septic site visits 812-481-7055); weekdays 8:00 a.m. to 4:00 p.m.
Highway DepartmentDriveway placement on county roads; 660 miles of county roads outside town streets and state highways; 812-482-5505; 6:30 a.m. to 4:00 p.m.
AuditorSubdivision ordinance and plat approvals; draft zoning ordinance on file for review; 812-481-7000
County SurveyorLegal drains, Drainage Board, and 911 addressing outside towns and cities; 812-481-7085
Advisory Plan CommissionCreated October 19, 2026; meetings at the Courthouse Annex, 602 Main St., Jasper

Dubois County permit types and approvals

Because the county has no building permit form, the paperwork for a rural project is the set of county approvals plus any state filing.

Residential projects

For a new house outside the towns, start with the land: a lot split must be approved under the county subdivision ordinance before construction. Next comes the septic system, which must be permitted before the house is built, then the driveway placement approval and the 911 address. The Notice of Assessment Registration goes to the Assessor with the builder’s construction plans before work starts. The same notice covers additions, finished basements, pools and outbuildings on existing homes.

Commercial projects

Commercial, industrial and multi-tenant buildings in the unincorporated county still need the state design release before construction. A septic permit is required before construction of a commercial building as well as a house, and the assessment notice and driveway approval apply in the same way. If the draft zoning ordinance is adopted, it adds a County Zoning Administrator, a Board of Zoning Appeals and two districts, one that bars “high impact land uses” and one that regulates them; the draft also routes battery energy storage systems, data centers and large solar energy systems through conditional use review with their own standards, such as a commissioning plan for battery systems before a building permit.

What comes before construction

  • Subdivision. Ask the Auditor’s Office whether a parcel split needs approval under the 2018 subdivision ordinance.
  • Septic. A certified soil scientist evaluates the site; the installer completes the Health Department’s plan review worksheet and books a site visit.
  • Driveway. The Highway Department approves where a new drive meets a county road; state highways belong to INDOT.
  • Planning areas. Land near Jasper, Huntingburg or Ferdinand may be inside a city or town planning area: check with that office first.
  • Flood areas. Unincorporated Dubois County is listed by FEMA among communities not in the National Flood Insurance Program (community 180054); Jasper participates on its own (180055).

Rather talk it over?

Call 1-855-478-4290 →

Dubois County fees

With no county building permit there is no county building-permit fee. The fees a rural project meets are the Health Department’s, from its schedule updated January 2020, and the fees of the city or town where a project sits inside a planning area.

Fees that apply to building projects in Dubois County
ItemFee
Sewage (septic) permit, Health Department$125
Septic installer’s permit (registered installers)$100
Notice of Assessment RegistrationNo filing fee; $100 civil penalty if a required notice is not filed
Jasper improvement location permit, new single- or two-family home$200 base rate
Ferdinand building/location improvement permit$10 to $100 by fair market value and district
Ferdinand fence permit$25

The soil scientist’s evaluation and the septic design are private costs set by those professionals. On Class 1 work, the state design release fee applies on top of any local charge. If county zoning is adopted, its fee schedule will be set separately; none is in force today.

Trade work and who may do it in Dubois County

The county’s published pages show no county electrical, plumbing or HVAC permit and no county contractor license or registration for unincorporated land. What they do set is the septic trade: installers must be on the Health Department’s list of registered installers (a $100 installer’s permit) and must follow the approved plan, with the Health Department notified before installation and a backfill inspection before final approval.

  • Plumbing contractors are licensed by the state Plumbing Commission wherever they work.
  • Geothermal systems are reported on the assessment sheet with a copy of the installer’s certification.
  • Inside the cities and towns, each local office sets its own rules; Jasper’s location permit form asks for the general, electrical, plumbing and gas contractors.

Rather not deal with the Dubois County building department?

Get a free quote →

How to start a building project in unincorporated Dubois County

1. Confirm where the parcel is

Use the county GIS map to see whether the land is in Jasper, Huntingburg, Ferdinand, a town, or a city’s planning area. If it is, go to that office instead.

2. Clear any land split

Ask the Auditor (812-481-7000) whether the lot needs subdivision approval.

3. Get the septic permit

Hire a certified soil scientist, have a registered installer submit the plan review worksheet, and schedule the Health Department site visit (812-481-7055).

4. Get driveway approval

Call the Highway Department (812-482-5505) before cutting a new drive onto a county road.

5. File the assessment notice

Return the Notice of Assessment Registration and the information sheet to the Assessor with the construction plans before work starts.

6. Class 1 work: get the state release

Commercial and other Class 1 buildings need the Construction Design Release before construction.

Review, corrections and what causes delay

Septic is the usual pacing item: the Health Department will not issue the permit until the design, the field layout and the plans are approved, and the site must be protected from compaction, fill or cutting until then. Installation itself must wait for proper soil conditions. A parcel split started without approval can hold up a build, and projects near a city may find they are inside its planning area.

Inspections in unincorporated Dubois County

The county’s published pages describe no framing or final building inspections for houses in the unincorporated area. The inspections the county does describe are for septic systems:

  • Site visit and field verification of the system layout before the permit is issued.
  • Notice before installation by the owner or installer.
  • Backfill inspection by the Health Department before final approval.
  • GPS record: system components are located and added to the county GIS map, and the owner can ask for the drawing later.

Class 1 buildings follow the state’s design release conditions, including keeping the released plans on site. Inside Jasper, staff visit the site before and after construction; Huntingburg and Ferdinand set their own procedures.

Indiana building code

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Want this handled start to finish?

Get a free quote →

Dubois County building permit FAQ

Do I need a building permit to build a house in rural Dubois County?

The county’s published pages show no county building permit for unincorporated land. You still need subdivision approval if the lot is split, a septic permit, driveway approval and a Notice of Assessment Registration filed with the Assessor before work begins.

What is the Notice of Assessment Registration?

State Form 786, filed with the County Assessor before demolishing, structurally changing or improving property when no state or local permit covers the work and it costs more than $500. Missing it can bring a $100 civil penalty.

Is Dubois County adopting zoning?

It is considering it. The Advisory Plan Commission was created on October 19, 2026, and a draft zoning ordinance with a proposed December 15, 2026 effective date goes to public hearing on November 17, 2026; it applies only if the County Commissioners adopt it.

How much is a septic permit in Dubois County?

$125 for the sewage permit under the Health Department’s fee schedule, after a soil scientist’s evaluation and plan review.

Who issues permits in Jasper, Huntingburg and Ferdinand?

Each runs its own: Jasper’s Community Development & Planning, Huntingburg’s Planning department and Ferdinand’s zoning department at Town Hall.

Can I get flood insurance in unincorporated Dubois County?

FEMA’s community list places Dubois County (community 180054) under “Communities Not in the National Flood Program”, so the county’s unincorporated area is not an NFIP participant; Jasper participates separately.

Who approves a driveway onto a state highway?

The Indiana Department of Transportation. The county Highway Department covers only county roads, not town streets or INDOT routes.

Who assigns a new rural address?

The County Surveyor does the Emergency 911 addressing for areas outside the incorporated towns and cities. The county’s before-construction sheet adds that most rural 911 addresses are assigned through Brosmer Land Surveying, and gives 812-482-9819 for a new address.

Permit search and official resources

Property, parcel and septic location records are on the county GIS map; septic files are kept by the Health Department, assessment records by the Assessor and subdivision files by the Auditor. For anything else, the county posts a public records request form on its Forms page.

Inspections are where schedules slip.

Get a free quote →

Simplify Dubois County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Dubois County sooner?

Let Alliance prepare, file, and track your Dubois County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Dubois County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.