Pike County, Indiana Building Permit Guide

To get a building permit in Pike County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Pike County’s published offices include no building department; the permits its sources do show are septic permits, floodplain development permits, road-cut permits and stormwater plan reviews.

Building office: None listed by the countySeptic: Health DepartmentCommissioners: (812) 354-8448
Septic
Health Department2206 S. State Road 61, Winslow
Floodplain
Ordinance 2026-01EMA Director administers
County roads
Road-cut permitHighway (812) 354-9743
Earthwork
SWCD plan reviewConstruction stormwater

Pike County, with its seat in Petersburg, lists no building, planning or zoning department among its offices, and its posted ordinances include no county building-permit ordinance. What the county does run is the permitting around a building site: septic permits from the Health Department in Winslow ((812) 354-8797), floodplain development permits under Ordinance 2026-01 adopted June 1, 2026, road-cut and road-use approvals from the Highway Department, and stormwater plan reviews by the Soil and Water Conservation District. To ask whether a building permit applies to a particular parcel, contact the Commissioners’ office at (812) 354-8448.

What requires a permit in Pike County?

The county’s government page lists its departments, from the Assessor to Veterans Services, and its boards page lists the Board of Health, Drainage Board and other bodies; none is a building department, plan commission or board of zoning appeals, and the staff directory shows no building commissioner or inspector. The ordinances posted by the county cover floods, a yearly frost ordinance, food service and road names, not building permits. The permits that Pike County’s own sources do require are tied to the site rather than the building.

County permits and approvals

  • Onsite sewage (septic) permit for any home or building that will use a septic system
  • Septic repair, expansion, reconnection, replacement and abandonment
  • Floodplain development permit for any development in a special flood hazard area
  • Permission to cut a county road or work in the county right-of-way
  • Road use agreement and bond for hauling heavy equipment to a construction job
  • Stormwater plan review for land disturbance under the state construction stormwater permit

State approvals that still apply

  • Construction Design Release for Class 1 buildings
  • IDEM notice of intent for construction stormwater coverage
  • INDOT permits for work on a state highway
  • IDNR flood data where FEMA maps are missing or disputed
  • State plumbing license for plumbing contractors

What Pike County decides and what the state holds

Pike County sets its own floodplain ordinance, septic procedures and fees, county road rules and road-use bonds. It does not post a county building code or fee schedule. The state’s building rules still govern construction, and a Class 1 building used by the public, by three or more tenants or by employees needs the state design release before construction whether or not a local permit exists.

Pike County building department: who handles permitting

Permitting is split among several county offices, and the City of Petersburg and the towns of Winslow and Spurgeon have their own codes. Their building chapters, written in 1990, all point back to the county: Petersburg’s code names “the Building Commission of Pike County” as the single agency for building rules and inspection under a joint resolution of June 1990, Spurgeon’s cites Pike County Resolution 1990-2 of July 16, 1990 for the same arrangement, and Winslow’s has building fees paid to the Pike County Commissioners. The county’s current directory shows no such office, so a builder in Petersburg, Winslow or Spurgeon should ask the city or town hall and the Commissioners’ office which of these arrangements is still in use.

Short on time to read all of this?

Get a free quote →
Pike County permit contacts
OfficeRole and contact
Board of CommissionersCounty executive, floodplain ordinance; Courthouse, 801 Main Street, Petersburg; (812) 354-8448
Health DepartmentSeptic permits; 2206 S. State Road 61, Winslow; (812) 354-8797; Mon, Tue, Thu 7:30 a.m. to 5 p.m., Wed to 6 p.m., closed Friday
Emergency ManagementDirector serves as Floodplain Administrator; (812) 354-6776
Highway DepartmentRoad cuts, right-of-way work, road use; 552 N. State Road 61, Petersburg; (812) 354-9743
Surveyor and Drainage BoardLegal drains and survey records; 801 Main Street, Petersburg; (812) 354-9736
Soil and Water Conservation DistrictStormwater plan review; (812) 354-6120, ext. 3
Towns in Pike County
PlaceWhat its code says
Petersburg (city)Chapter 14.04 requires a permit for work over $1,000 and designates the Pike County building commissioner; city ordinances are published through the Indiana 15 Regional Planning Commission; City Hall 812-354-8511
Winslow (town)Chapter 9.08 requires a permit for work over $3,000 in materials, fees paid to the Pike County Commissioners
Spurgeon (town)Chapter 9.03 names the Pike County building commissioner under 1990 joint resolutions

Pike County permit types

Because the county posts no building permit application, the forms an owner or builder actually files in Pike County are the site permits below. Each one comes from a different office and has its own fee and sequence.

Residential permits

  • Onsite sewage system permit. The Health Department application covers new systems, repairs, expansions, reconnections and replacements, and asks for the parcel number, acreage, water supply, foundation type, bedrooms and bathrooms, the number of occupants, any whirlpool tub of 125 gallons or more, the house’s square footage and whether outbuildings are plumbed.
  • Septic abandonment. Taking an old system out of service has its own application.
  • Floodplain development permit. Required before any development in a mapped special flood hazard area, including new buildings, additions, accessory structures, decks, carports and pavilions.
  • Road cut or right-of-way permit. Needed before boring or cutting under a county road, for example to bring a utility line to a new home.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and industrial sites face the same county permits plus two that bite harder on larger jobs. Companies hauling heavy equipment and materials over county roads to build a project sign a road use agreement with the Commissioners and keep the bonded roads, bridges, culverts and ditches in the same or better condition. Under Policy P-02, as amended by Resolution 2010-08, the road bond for heavy construction and coal mining operations is $275,000 per mile of paved road, $175,000 per mile of chip and seal and $50,000 per mile of gravel, with escrow of one tenth of each, and bridges are bonded case by case at their replacement cost. Sites that disturb enough land to need state construction stormwater coverage go through the Soil and Water Conservation District’s plan review, and Class 1 buildings need the state design release.

What comes before construction

  • Soil evaluation. A certified soil scientist (any licensed to work in Indiana) evaluates the septic site; protect the boring area from digging or scraping until the system is built there.
  • Flood check. The floodplain ordinance uses the September 17, 2014 flood maps and the best available state flood data for streams draining more than one square mile.
  • Legal drains. The County Surveyor supervises county drain construction and maintenance and keeps the survey and corner records.
  • Stormwater. No earthmoving until the SWCD approves the plan and 48 hours have passed since the notice of intent went to IDEM.
  • Frost ordinance. The Commissioners adopt a frost ordinance each year (the 2025 and 2026 versions are posted); heavy haulers should check it before moving equipment on county roads.

Pike County permit costs and fees

Pike County posts no building permit fee schedule. The county fees that its documents do set are below; the town codes contain their own 1990 fee schedules, and Winslow’s sets a $20 minimum permit fee and a $20 reinspection fee.

Rather talk it over?

Call 1-855-478-4290 →
Pike County permit fees and bonds
ItemAmount
Septic application fee (due with the soil report)$50
Septic permit fee (paid when the permit is issued)$50
Starting septic construction before the permit$500 fee
Floodplain ordinance violationFine up to $2,500; each day a separate offense
Road bond, paved road (Policy P-02)$275,000 per mile; $27,500 per mile escrow
Road bond, chip and seal / gravel$175,000 and $17,500 escrow / $50,000 and $5,000 escrow, per mile
BridgesCase by case, at replacement cost set by the Highway Department
Stormwater plan reviewPer the SWCD’s review and inspection fee sheet; check or money order to Pike County SWCD

A typical new home on a septic system therefore pays at least $100 to the Health Department ($50 with the soil report and $50 at permit issue), plus the soil scientist’s and installer’s own charges. The SWCD fee is not reduced by IDEM’s filing fee, cannot be combined with any other county or town fee, and is non-refundable; an approved plan review stays valid for two years.

Trade permits and who may pull them

Pike County’s published sources show no county electrical, plumbing or mechanical permit and no county contractor registration. Plumbing contractors still need the state plumbing license. Septic work is the trade the county does regulate closely: the installer submits the drawing and materials and design packet, marks the system on the ground for the Health Department’s pre-approval visit, and must call 24 hours before covering the system for the final inspection, when elevations, measurements and every component are checked against the approved layout. The department keeps a list of manufactured septic tanks it accepts and a design worksheet for one common type of system.

  • Road and utility crews. The road-cut application is signed by the applicant and by the company doing the work, and any line under a county road must be buried at least 36 inches.
  • Town work. Petersburg, Winslow and Spurgeon set their own requirements; ask the town hall before hiring trades for a job inside town limits.

Rather not deal with the Pike County building department?

Get a free quote →

How to get permits for a Pike County building site

1. Confirm where the parcel is

Inside Petersburg, Winslow or Spurgeon, start with the town; in the rural county, call the Commissioners’ office about any building permit.

2. Check the flood maps

If the site is in a special flood hazard area, apply to the Floodplain Administrator (the EMA Director) before any development.

3. Start the septic permit

File the Health Department application, have a certified soil scientist evaluate the site, and pay the $50 application fee with the soil report.

4. Have the installer submit plans

The installer designs the system to the department’s spec sheet, submits the packet and marks the layout for pre-approval.

5. Arrange road access

Apply to the Highway Department before cutting or boring under a county road, and to INDOT on a state highway.

6. Clear stormwater and the state

File the erosion control plan with the SWCD and the notice with IDEM where required, and get the design release for any Class 1 building.

Review, corrections and what causes delay

Septic permits stall when the soil borings are disturbed before the system is placed, when the installer’s layout differs from the approved plan, or when part of the system crosses a property line without a recorded easement in the permit file. The SWCD will not review a stormwater plan until every component and the fee are in, and requires a preconstruction meeting with its reviewer, the plan designer and the owner before approval.

Inspections in Pike County

The Health Department inspects every septic system twice: a pre-approval visit when the installer has marked the components with flags, paint or stakes, at which staff check elevations, perimeter drain outlets and separation distances, and a final inspection booked 24 hours before the system is covered. Everything must be where it was placed for pre-approval. The Health Department is closed on Fridays, so plan the covering date around its Monday-to-Thursday hours.

Floodplain development is administered by the Floodplain Administrator, who must tell an owner that a violation is treated as a willful act to increase flood damage and may cause the property’s flood insurance coverage to be suspended. The SWCD inspects construction stormwater sites under its review policy. Road cuts are approved by the Highway Superintendent, and the applicant must restore removed paving to the satisfaction of the superintendent and the Commissioners.

Indiana building code in Pike County

Pike County’s own posted ordinances do not adopt a building code. FEMA lists unincorporated Pike County as participating in the National Flood Insurance Program, with its current flood map, dated September 17, 2014, showing no base flood elevations; the county’s June 2026 flood damage prevention ordinance carries the floodplain rules.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Want this handled start to finish?

Get a free quote →

Pike County permit FAQs

Does Pike County have a building department?

None appears in the county’s list of departments, boards or staff, and its posted ordinances include no building-permit ordinance; ask the Commissioners’ office at (812) 354-8448 whether a permit applies to a parcel.

How much is a septic permit in Pike County?

$50 with the soil report and $50 when the permit is issued; starting construction before the permit carries a $500 fee.

Who is the floodplain administrator?

The Emergency Management Director, appointed under Ordinance 2026-01, which the Commissioners passed on June 1, 2026.

Do I need permission to bore under a county road?

Yes. File the Highway Department’s application to cut a county road, and bury any line at least 36 inches deep.

What does a road bond cost for a construction project?

Under Policy P-02, $275,000 per mile of paved road, $175,000 per mile of chip and seal and $50,000 per mile of gravel, each with a 10% escrow.

Who permits building inside Petersburg?

Petersburg’s code designates the Pike County building commissioner under a 1990 joint resolution; ask Petersburg City Hall at 812-354-8511 how permits are handled today.

Where is the Health Department?

At its new location, 2206 South State Road 61, Winslow; it is open Monday, Tuesday and Thursday 7:30 a.m. to 5 p.m. and Wednesday to 6 p.m.

Pike County permit search and official resources

Septic permit files are held by the Health Department, floodplain permits by the Floodplain Administrator, and road-cut approvals by the Highway Department; ask each office for its records. Commissioners’ agendas, minutes and ordinances are posted in the county document center, and meetings are livestreamed.

Inspections are where schedules slip.

Get a free quote →

Simplify Pike County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Pike County sooner?

Let Alliance prepare, file, and track your Pike County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Pike County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.