Unincorporated Gibson County has no county building department and, since the commissioners repealed the county zoning ordinance on February 9, 2021 (Ordinance 2021-01), no county zoning permit either. What the county does regulate is drainage, through the Gibson County Drainage Board’s stormwater permit and fee schedule, flood hazard areas, through a floodplain administrator at the Emergency Management Agency, and septic systems, through the Gibson County Health Department in Princeton (812-385-3831). Princeton and the towns handle building permits inside their own limits.
What requires a permit in Gibson County?
Gibson County’s ordinance list shows the rules that still reach a building project outside the cities and towns. The commissioners tried to adopt a comprehensive plan and zoning ordinance, but repealed it in full in 2021 because questions had arisen about whether it had been properly adopted and its validity was uncertain. No county ordinance on the list adopts a building code or creates a county building permit.
County rules that apply
- Stormwater Management Ordinance 2022-02 and its fee schedule, Ordinance 2022-03 (drainage review and stormwater permit)
- Flood Hazard Area Ordinance 2019-1
- Subdivision Control Ordinance 2019-02 for dividing land
- Solar Energy Ordinance 2021-03 and Wind Energy Ordinance 2021-02
- Private Sewer Systems Ordinance 2013-3, enforced through the Health Department
Not regulated by the county
- Zoning districts, setbacks and use permits (ordinance repealed in 2021)
- A county building permit or county construction inspections
- Building inside Princeton or a town, which is that city or town’s business
The stormwater ordinance’s regulated area is all county territory outside the municipalities, plus any town that agrees to adopt the county ordinance and any area inside a municipality that drains directly to a county regulated drain. Redevelopment is covered when it disturbs 1 acre or more of land; exterior remodeling alone is not.
One exception reaches outside a city: Princeton’s Building Commissioner page says permits are required for any construction, demolition and signs in the City of Princeton and within a two-mile radius of the city limits, so a rural lot near Princeton goes to the city. The page posts its fees: storage buildings and carports $10, detached garages $10 plus 5 cents per square foot, houses $50 plus 5 cents per square foot of living space, and commercial buildings $100 plus 5 cents per square foot, up to $1,000, with a state design release and site plan for commercial work.
What the county decides and what the state holds
Gibson County decides drainage, floodplain, subdivision, septic and energy-siting rules. With no county building permit, a house in the unincorporated county deals with the drainage, floodplain and septic offices rather than a building department. A Class 1 building, such as a shop or office, still needs the state’s Construction Design Release before construction, and Princeton’s own application asks for a copy of that release for Class 1 work.
Short on time to read all of this?
Get a free quote →Gibson County building department: who handles permitting
The Gibson County Drainage Board is made up of the three county commissioners, with the County Surveyor as a non-voting member; the Surveyor’s office manages county regulated drains and issues the related permits. The county’s floodplain administrator works from the Emergency Management Agency in Oakland City, and the Health Department handles septic systems. The commissioners meet on the first and third Tuesdays at the Commissioners’ Office, 107 South Hart Street, Princeton.
| Item | Detail |
|---|---|
| Drainage Board | Meets on the first Tuesday at 107 S. Hart Street, Princeton; the board’s page says 15 minutes after the 8:00 a.m. commissioners’ meeting, the county meetings page says 4:45 p.m. |
| County Surveyor and GIS | Courthouse, 101 N. Main Street, Princeton; 812-385-4853; GIS 812-761-2639 |
| Floodplain Administrator | Emergency Management Agency, 903 W. Morton Street, Oakland City |
| Health Department (septic) | 203 South Prince Street, Suite A, Princeton; 812-385-3831; Monday to Friday, 8:00 a.m. to 4:00 p.m. |
| Highway Department | Maintains about 1,200 miles of county roads and 260 bridges; non-emergency road issues 812-385-3496 |
| Place | Building permits |
|---|---|
| Princeton (city, 8,524) | City Building Commissioner, 220 S. Richland Creek Drive; 812-386-1333; permits for construction, demolition and signs in the city and within two miles of its limits |
| Oakland City (city, 2,274) | The published sources do not say; ask the city |
| Fort Branch (2,936), Haubstadt (1,610), Owensville (1,332), Patoka (706), Francisco (539), Somerville (249), Hazleton (196), Mackey (127) | The published sources do not say who issues building permits in these towns; ask the town clerk |
To tell whether a parcel is inside a town, look it up on the county’s Beacon map, linked from the floodplain page, or ask the Surveyor’s GIS office.
Gibson County permit types
Because the county issues no building permit, the “permit types” in the unincorporated county are the approvals each county office gives, and they depend on the size of the site and what is on it.
Residential permits
- Septic. A home without sewer needs a permit under the Private Sewage Disposal Ordinance (Ordinance 2013-3, recorded June 16, 2014, updating a 1997 ordinance), which authorizes the county health officer and agents to issue permits, collect fees, inspect and order corrections.
- Stormwater. A single-family home on 1 to less than 5 acres has a $0 drainage review base fee under Ordinance 2022-03; sump pumps that discharge groundwater must connect to a subsurface drain where the development provides one.
- Floodplain. Building in a mapped flood hazard area falls under Ordinance 2019-1 and the floodplain administrator; the Indiana DNR’s floodplain portal shows where those areas are.
- Splitting land. Dividing a parcel follows the Subdivision Control Ordinance.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and planned developments file the county’s Application for Stormwater Permit, from Appendix B of the stormwater ordinance, with the application fee, construction plans with a title sheet and vicinity map, and a boundary survey that shows drainage easements and wetlands. Detention basins must handle the 10-year and 100-year storms, new drain tiles of 12 to 24 inches need 20-foot easements and larger ones 30-foot easements, and facilities that act as a major drainage system must also meet Indiana DNR standards.
The application’s checklist goes further: a topographic map at 1-foot contours where slopes are 2% or less and 2-foot contours above that, the 100-year floodplain, floodway fringe and floodway (or a note that none exist), wetlands, ponds and water courses, existing septic systems and outfalls, regulated drains and farm drains, a grading and drainage plan with 100-year overflow paths shown hatched, typical channel cross-sections carried above the 100-year high water, utility and storm sewer plan and profile sheets, and a plat with a regulated drain statement.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Solar and wind projects
The Solar Energy Project Ordinance (2021-03) creates a county permit of its own. It covers ground-mounted solar energy conversion systems, not rooftop or building-integrated panels, and allows only photovoltaic and thermal systems; concentrated solar power may not be installed in the county. Projects fall into three tiers: Tier 1, more than 20 acres producing power for the grid; Tier 2, more than 1 acre and up to 20 acres generating mainly for on-site use; and Tier 3, 1 acre or less, owned by one landowner and used behind the meter. No project may operate without a permit and posted financial assurance for reclamation. Applications go to the Board of Commissioners or its appointed administrator, who comments on completeness within 20 days and issues a Tier 1 or Tier 2 permit within 45 days of a complete application; a denial or missed deadline can be appealed in writing within 10 days. Tier 3 projects file a shorter application. Wind energy is covered by a separate 2021 ordinance.
What comes before construction
- Drainage Board review of the stormwater plan, with a preliminary approval option at a flat $800.
- Septic permit from the Health Department.
- Floodplain review where the site is in a flood hazard area.
- Road work. County ordinances cover temporary road closures and crossings; report road problems to the Highway Department.
- State design release for Class 1 buildings.
Rather talk it over?
Call 1-855-478-4290 →Gibson County permit costs and fees
The county’s main development fee schedule is Ordinance 2022-03, the Drainage Board’s fee schedule for the Stormwater Management Ordinance, recorded May 18, 2022. Ordinance 2024-2, adopted by the commissioners on July 16, 2024, raised the base fees for commercial and industrial sites; the table uses those figures.
| Item | Fee |
|---|---|
| Single-family residential, 1 to under 5 acres | $0 |
| Major subdivision | $2,300 (1 to under 8 acres); $2,900 (8 to under 20); $3,900 plus $35 per acre over 20 |
| Planned development | $2,800; $3,600; $4,600 plus $35 per acre over 20 |
| Commercial and industrial sites (Ordinance 2024-2) | $3,000 (1 to under 2 acres); $3,400 (2 to under 7); $3,800 (8 to under 20); $4,300 plus $100 per acre over 20 |
| Each review beyond the three included | $500 |
| Site in an approved master-planned campus | $660 flat |
| Resubmittal of an approved design | $1,000 flat |
| Public facilities (schools, fire stations, libraries) | $1,000 flat |
| Preliminary approval only | $800 flat |
| Discharge to a county drain from inside a city or town | $660; $800; $1,000 plus $35 per acre over 20 |
The 2024 amendment as printed skips commercial and industrial sites of 7 to 8 acres, so ask the Drainage Board for that fee. Linear utility projects pay $660 under 1 mile, $1,300 from 1 to under 5 miles and $2,300 plus $35 per mile above that. Septic permit fees are set by the Health Department, and building permit fees inside Princeton or a town by that city or town.
Trade permits and who may pull them
There are no county electrical, plumbing or mechanical permits in unincorporated Gibson County, and no county inspector checks that work. Plumbing contractors still need their state license wherever they work, and septic systems are permitted by the Health Department.
Rather not deal with the Gibson County building department?
Get a free quote →- Inside Princeton: the Building Commissioner’s application lists the contractor and owner, the zoning district, whether the lot is in the floodplain, and an 811 locate ticket number.
- Inside the towns: trade permits, if any, are set by each town.
- Drainage work: tiles, swales and detention on a regulated site follow the stormwater technical standards, and sump pumps carrying sanitary flow must go to the sanitary system, not a storm drain.
How to get a project approved in Gibson County
Check on the Beacon map whether the site is inside Princeton or a town; if so, apply there.
Look the site up on the Indiana Floodplain Information Portal and contact the floodplain administrator if it is in a flood hazard area.
Apply to the Health Department at 203 South Prince Street, Princeton.
For a subdivision, commercial or industrial site, have an engineer prepare the stormwater permit application and drainage technical report.
File with the Surveyor’s office and pay the review fee; the board meets on the first Tuesday.
Obtain the Construction Design Release before construction begins.
Review, corrections and what causes delay
The base drainage fee covers up to three reviews and review memos; a fourth and later reviews cost $500 each, and a changed design that comes back after approval is charged $1,000. Projects that cannot meet the allowable release rate may be allowed to increase downstream capacity instead, at the applicant’s cost, including the permits and consents that requires.
Inspections in Gibson County
The county runs no building inspections in the unincorporated area. Inspections come from the offices that issue permits: the Health Department for septic systems, and the Drainage Board’s stormwater process, whose Appendix B forms include a Certificate of Completion and Compliance for the finished drainage work: the certifier states that they, or someone under their direct supervision, personally inspected the completed work and checked the drainage permit and its conditions, the as-built plans and final drainage calculations. Five county ditches, the Blair, Scott, Maumee, Hull and Black River, have their own district commissioners, and the Surveyor’s office can say who they are.
Inside Princeton, the Building Commissioner administers building permits; a demolition, a sign or work in the utility right-of-way there each has its own city application.
Indiana building code in Gibson County
FEMA’s Community Status Book lists unincorporated Gibson County (community 180434) as participating in the National Flood Insurance Program, with flood maps effective November 5, 2014, so the county’s Flood Hazard Area Ordinance 2019-1 applies in mapped flood areas. The Surveyor’s office keeps the county GIS used to check parcels.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Gibson County permit search and official resources
There is no county building permit record to search in the unincorporated area. Drainage Board files are kept by the Surveyor’s office, septic records by the Health Department, and commissioners’ minutes are posted on the county site. Inside Princeton, ask the Building Commissioner’s office.
- Gibson County ordinances
- Ordinance 2021-01 repealing county zoning
- Stormwater Management Ordinance 2022-02
- Stormwater fee schedule, Ordinance 2022-03
- Ordinance 2024-2, commercial and industrial drainage fees
- Gibson County Drainage Board
- Floodplain administration
- Flood Hazard Area Ordinance 2019-1
- Subdivision Control Ordinance 2019-02
- County Surveyor
- Gibson County Health Department
- City of Princeton departments
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Gibson County permit FAQs
Do I need a building permit in unincorporated Gibson County?
No county building permit exists there, but within two miles of Princeton’s city limits the city requires its own permit. Elsewhere you still need a septic permit if you are off sewer and must meet the drainage and floodplain ordinances.
Does Gibson County have zoning?
Not in the unincorporated area. The commissioners repealed the county zoning ordinance on February 9, 2021.
What does drainage review cost for a house?
Nothing for a single-family home on 1 to under 5 acres; major subdivisions pay $2,300 and up and commercial or industrial sites $3,000 and up.
Who issues building permits in Princeton?
The city’s Building Commissioner, 220 S. Richland Creek Drive (812-386-1333).
Where do I get a septic permit?
From the Gibson County Health Department, 203 South Prince Street, Suite A, Princeton (812-385-3831).
Who handles floodplain questions?
The county floodplain administrator at the Emergency Management Agency, 903 W. Morton Street, Oakland City.
Do I need a county permit for solar panels?
Not for rooftop panels. Ground-mounted systems need a permit under Ordinance 2021-03, with tiers from 1 acre or less behind the meter up to utility projects of more than 20 acres.
Does a commercial building need anything from the state?
Yes. A Class 1 building needs the state Construction Design Release before construction starts.
Simplify Gibson County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Gibson County sooner?
Let Alliance prepare, file, and track your Gibson County permits while your crew stays on the job.
More Indiana permitting guides
Pike County
Read guide →Knox County
Read guide →Posey County
Read guide →Goshen Building Permit Guide
Read guide →Grant County Building Permit Guide
Read guide →Greenfield Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Gibson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.