Inside the City of Greenfield, the Planning & Building Department at City Hall, 10 South State Street (317-477-4320), reviews plans, issues the improvement location permit and building permit, and inspects the work; Jenna Wertman is the Planning Director. Applications go through the city’s Citizenserve portal. Permit fees are flat amounts, $345 for a two-story house, but new homes also pay city park and road impact fees and utility connection charges that add several thousand dollars. Land outside the city limits is handled by Hancock County.
What requires a building permit in Greenfield?
Greenfield publishes two plain lists for homeowners, one of residential work that needs a permit and one of work that does not, and a third list for commercial property. When a job is on neither list, the city asks you to call the Building Inspector at 317-477-4320.
Permit required (homes)
- New houses, additions, detached garages and carports
- Sheds and mini barns, and decks; both need a permanent foundation at 200 square feet or more
- Porches with a roof, fences, permanent pools and hot tubs
- New electrical services, upgrades and meter bases, new water meters and new plumbing
- Remodels removing 64 square feet or more of drywall, subfloor replacement and interior alterations
- Finishing basements, bonus rooms or accessory buildings
- Reroofing with five or more sheets of decking replaced, and foundation repairs
- Demolition, and new drives onto a public street or alley
No permit (homes)
- Painting, flooring, carpet and cabinet changes
- Reroofing with up to five sheets of new decking, and siding or gutter replacement
- Same-size window and door replacement (bedroom windows still need 5.7 square feet of opening)
- Plumbing and electrical fixture changes, new electrical circuits, appliance swaps and water softeners
- Exterior slabs, private sidewalks and drives that stay out of the right-of-way
- Temporary pools, play equipment, landscaping, ponds and retractable awnings
Commercial work is broader: new buildings, additions, tenant finishes, reroofing, furnace, air-conditioning and water heater changes, new plumbing, commercial tents and job trailers, dumpster enclosures and fences all need permits.
What Greenfield decides and what the state holds
The city sets its own permit lists, fees, impact fees, residential design guidelines and zoning under its Unified Development Ordinance. The technical code is the state’s, and the commercial list notes where the state design release comes first: most new buildings and additions, tenant finishes, pools, porches or overhangs over 300 square feet, interior work adding 100 lineal feet or more of non-bearing wall, and new plumbing of five or more drainage fixture units. One local reading is posted: ice and water shield underlayment is not required in Greenfield unless the shingle maker’s instructions call for it.
Short on time to read all of this?
Get a free quote →Greenfield building department: who handles permitting
The Planning & Building Department reviews residential and commercial plans, issues permits for new construction, remodeling, signs and demolition, inspects construction and enforces the building and zoning codes. It also staffs the nine-member Advisory Plan Commission, the five-member Board of Zoning Appeals and the Historic Board of Review. The department’s fee schedule and inspection papers carry the heading “Engineering and Planning”.
| Detail | Information |
|---|---|
| Office | Planning & Building, City Hall, 10 South State Street, Greenfield, IN 46140 |
| Phone / fax | 317-477-4320 / 317-477-4321 (City Hall main line 317-477-4300) |
| Hours | Monday to Friday, 8 a.m. to 4 p.m. |
| Planning Director | Jenna Wertman |
| Filing | Citizenserve portal (“Apply for Permits”) |
| Utility inspections | Water Utility 317-477-4350; Wastewater 317-477-4360; electric service through Greenfield Power and Light |
Greenfield is the county seat, but Hancock County’s Planning & Building Department does not permit inside the city: the county lists its jurisdiction as unincorporated Hancock County and the towns of Spring Lake and Shirley. If your parcel is outside Greenfield’s limits, see the Hancock County guide.
Greenfield permit types
Greenfield issues one combined Improvement Location Permit and Building Permit, priced by the kind of structure rather than by valuation, and adds separate utility, erosion control and sign permits.
Residential permits
- New homes: the residential ILP checklist asks for a stamped survey site plan (two copies), a site-specific foundation plan, building and engineering drawings including the electrical plan and beam and joist layout, an energy compliance certificate, stamped truss and floor-system data, the ILP application in triplicate, the utilities permit form naming the licensed plumber, the erosion control permit form and the residential design standards form.
- Site plans must be prepared by a registered architect, landscape architect, surveyor or engineer and show proposed elevations to the nearest tenth of a foot, drainage swales and easements; plans are filed electronically as well as on paper.
- Design guidelines: under guidelines adopted May 8, 2003, the same model elevation must be at least four lots apart on one side of a street and not repeated directly across it, and neighboring homes may not share a brick or siding color; lots more than 80 feet wide are exempt.
- Decks, pools, fences and accessory buildings use the same permit at the flat fees in the schedule; the city posts a separate decking information sheet.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial new construction, additions, remodeling and first tenant finishes are priced by floor area. The city’s list says most new buildings need the state design release before the city permit is issued, and a commercial water meter permit requires a plumber’s license. Development plans go to the Advisory Plan Commission, and a pre-filing meeting with the Planning Director is required for rezonings, annexations, primary plats and development plans.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning: variances and conditional uses go to the BZA; rezonings and development plans to the Plan Commission.
- Historic review: the Historic Board of Review hears applications in its districts ($10).
- Utilities: the utilities permit packet covers sewer and water connections, inspected by the Wastewater and Water departments, and Greenfield Power and Light’s electrical service permit.
- Erosion control: an erosion control permit and plan, inspected before land disturbance.
- Right-of-way: a new drive onto a public street or alley needs a right-of-way cut permit.
- Class 1 work: the state Construction Design Release.
Greenfield permit costs and fees
The Planning and Building Fee Schedule posted on the building page (file dated October 20, 2026; each page printed “Revised January 9, 2026”) lists ILP and inspection fees under Ordinance 2002-23, as amended through Ordinance 2015-19, plus utility connection, park impact and road impact fees. Utility, park and road fees must each be paid by a separate check to the City of Greenfield.
| Work | Fee |
|---|---|
| One-story single-family dwelling | $250; add $45 for a basement and $45 for a rear porch or deck |
| Single-family dwelling over one story | $345, with the same $45 add-ons |
| Two-family dwelling or townhome / multi-family | $150 per unit / $195 per unit |
| Addition up to 720 sq ft / over 720 sq ft | $90 / $225 |
| Remodel with structural changes | $90 |
| Patio, porch or deck | $70 |
| Accessory building 199 sq ft and under / over 200 sq ft | $45 / $90 |
| Fence; communication tower 31 feet or taller | $45 each |
| Private pool / hardwired spa | $150 / $30 |
| Commercial new construction | $450 up to 2,500 sq ft, plus $0.18 per sq ft over |
| Commercial addition | $300 up to 1,700 sq ft, plus $0.18 per sq ft over |
| Commercial remodel | $150 up to 800 sq ft, plus $0.18 per sq ft over |
| Commercial reroof / first tenant finish | $75 / $150 |
| Re-inspection | $75 |
| Permit issued after construction started | Twice the fee (residential permits over $60: three times) |
| Certificate of occupancy before / after occupancy | $0 / $300 |
| Sewer connection, 5/8 to 3/4 inch meter | $2,310 |
| Water connection, 5/8 to 3/4 inch meter | $1,990 |
| Electric connection, residential | $1,000 |
| Park impact fee, 2026 | $1,852 single-family; $1,759 per two-family unit |
| Road impact fee, 2026 | $225 per trip: $2,121.75 single-family detached; $1,620 attached |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the schedule for a two-story house with a basement on a standard 5/8-inch water meter in 2026: ILP and inspections $345 + $45 = $390; park impact fee $1,852; road impact fee $2,121.75; sewer connection $2,310; water connection $1,990; and electric connection $1,000, for $9,663.75 in all. The park fee rises to $1,945 per home in 2027 and the road fee to $236 per trip. The accessory building rows stop at 199 square feet and start again “over 200”, so ask how a building of exactly 200 square feet is charged.
Trade permits and who may pull them
Greenfield’s fee schedule has no separate electrical, plumbing or HVAC permit fees for houses: trade work is inspected under the ILP and building permit, and the city’s own utilities control the service connections.
- Electrical service: Greenfield Power and Light requires an electrical service permit before any new service or upgrade starts. The permit lists the owner and the contractor; if no contractor is hired, or the owner is doing the work, only the owner’s details are used. The meter base comes from the utility, and the service is inspected by Greenfield Power and Light or the city’s Building Inspector before it is energized.
- Plumbing: the utilities permit form names the plumber or plumbing company and its license number, and sewer and water work is inspected by the Wastewater (317-477-4360) and Water (317-477-4350) departments. Commercial water meters need a licensed plumber.
- Upgrades: 200-amp and 400-amp service upgrades carry $150 and $300 utility charges.
- Contractor registration: the city’s posted permit papers do not describe a local contractor registration; ask the department before your crew starts.
Rather not deal with the building department?
Get a free quote →How to apply for a Greenfield building permit
Use the residential or commercial permit lists, or call 317-477-4320, to confirm a permit is needed.
For a rezoning, plat or development plan, book the pre-filing meeting with the Planning Director; variances go to the BZA.
Assemble the stamped survey site plan, foundation and building plans, energy certificate, truss data and the design standards form.
Complete the utilities permit packet with the plumber’s license number and the erosion control permit form.
Submit through the Citizenserve portal linked from the city’s site, with an electronic copy of the plans.
Pay the ILP fee and, for a new home, the park and road impact fees and utility connection fees, each on its own check.
Review, corrections and what causes delay
The residential checklist warns that missing items, or items not specific to the site, delay approval. The design standards form names the house model, elevation, siding color and masonry color, and comes with a diagram of the adjacent lots. Revised plans for the Plan Commission are filed in six full and two small sets.
Inspections and certificates in Greenfield
The permit holder, contractor or owner must call 317-477-4320 one business day ahead, giving the lot number and subdivision, street address or permit number; later requests are scheduled for the following business day.
- Erosion control before any land disturbance, with controls kept up until the end of construction
- Footing with trenches dug, forms and grade stakes set (wood grade stakes are not allowed) and rebar of half an inch or more bonded to the electrical grounding system
- Foundation or wall before concrete is poured, or after block is laid and anchors set
- Underslab and slab inspections before fill and before concrete
- Rough-in with framing, windows, doors, roof, plumbing, wiring, HVAC lines and fire blocking in place; batt insulation is installed for this inspection
- Final after grading and ground stabilization, before anything is moved in
Manufactured homes need footing, wall, electrical service and final inspections, and permanent pools a bonding and a final inspection. The certificate of occupancy is free when issued before move-in and is picked up at City Hall; if the building is occupied first, it costs $300.
Indiana building code in Greenfield
Greenfield enforces the state’s codes through its Planning & Building Department and posts its own public improvement and design standards. FEMA’s Community Status Book lists the City of Greenfield (community 180084) as participating in the National Flood Insurance Program, with maps effective December 4, 2007.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Greenfield permit search and official resources
Applications are filed in the Citizenserve portal linked from the city’s site. The department posts permit totals for each year since 2020 and a year-to-date total for 2026. For copies of an older permit, plans or a certificate of occupancy, call or visit the Planning & Building office at City Hall with the address.
- Greenfield building and permitting
- Planning & Building Department contacts
- Greenfield Citizenserve permit portal
- Planning and Building Fee Schedule (revised January 9, 2026)
- Residential work requiring a permit
- Residential work not requiring a permit
- Commercial work requiring a permit
- Residential ILP checklist
- Improvement location permit and building permit application
- Utilities permit packet
- Inspection procedures
- Advisory Plan Commission
- Board of Zoning Appeals
- Building permit totals, 2026
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Greenfield building permit FAQs
Do I need a permit for a shed in Greenfield?
Yes. Sheds and mini barns need a permit ($45 under 200 square feet, $90 over), and at 200 square feet or more a permanent foundation.
Do I need a permit to reroof?
Only if five or more sheets of roof decking are replaced; a reroof with fewer new sheets needs no permit.
Does a fence need a permit?
Yes, every residential fence is on the city’s permit list, at $45.
What does a new house cost in city fees?
For a two-story house with a basement in 2026: $390 for the permit, $1,852 park impact fee, $2,121.75 road impact fee and $5,300 in sewer, water and electric connections, about $9,664 in all.
How much notice do inspections need?
One business day; call 317-477-4320 with the address or permit number.
Can a homeowner do electrical work on the service?
Greenfield Power and Light’s rules let the owner take out the electrical service permit when no contractor is hired; the service is inspected before it is energized.
Does Hancock County issue permits in Greenfield?
No. The county covers unincorporated areas and the towns of Spring Lake and Shirley; Greenfield permits its own work.
Simplify Greenfield permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Greenfield sooner?
Let Alliance prepare, file, and track your Greenfield permits while your crew stays on the job.
More Indiana permitting guides
Hancock County
Read guide →Shelby County
Read guide →Marion County
Read guide →Greensburg Building Permit Guide
Read guide →Greenwood Building Permit Guide
Read guide →Griffith Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Greenfield permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.