Hancock County, Indiana Building Permit Guide

To get a building permit in Hancock County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Hancock County’s Planning and Building departments, in the county annex at 111 American Legion Place in Greenfield, issue improvement location and building permits for unincorporated Hancock County and the towns of Spring Lake and Shirley.

Authority: Hancock County Planning & BuildingServes: Unincorporated county, Spring Lake, ShirleyPhone: 317-477-1133
New house
$175 ILP + $375Plus 2¢/sq ft over 1,200
Park impact fee
$412Per new dwelling, Ord. 2026-6D
Septic first
Health Dept.Permits 8–10 a.m.
2025 activity
753 permits158 new single-family homes

In unincorporated Hancock County and the towns of Spring Lake and Shirley, the county Planning Department issues the improvement location permit (ILP) and the Building Department issues the building, electrical and pool permits and inspects the work, both at 111 American Legion Place, Suite 146, Greenfield (Building 317-477-1133, Planning 317-477-1134). Greenfield, Fortville, McCordsville, New Palestine and Cumberland run their own permit offices. A new house on a platted lot pays a $175 ILP fee and a $375 building fee plus 2 cents per square foot over 1,200, and since June 2026 a $412 park impact fee.

What requires a building permit in Hancock County?

In the county’s jurisdiction the Planning Department issues an ILP for all development, and the Building Department issues the building, electrical, pool and sign permits and the change-of-use permits that go with it. The county’s permit forms and fee schedule show what is covered.

Permit needed

  • New homes and two-family dwellings, on platted or unplatted lots
  • Residential remodels and additions, including covered porches
  • Detached garages, pole barns and mini barns over 200 square feet
  • Decks, and above-ground and in-ground pools
  • Electrical upgrades and reconnections
  • Commercial, industrial, institutional, agricultural and multi-family buildings, and changes of use
  • Signs, towers, wind and solar energy systems, and temporary structures such as construction or sales trailers

No permit

  • Portable mini barns of 200 square feet or less (the fee schedule lists “no permit required”)

Uses the fee schedule does not list are billed at an hourly rate set by the Planning Director and Building Official, so ask before you start.

The county’s land-use rules come from the Hancock County Unified Development Ordinance. A new UDO, Ordinance 2026-9A, took effect on October 10, 2026, so plans drawn to the old ordinance should be checked against it. On June 16, 2026 the commissioners adopted Ordinance 2026-6E on data center siting, and Ordinance 2026-6F on commercial power generation facilities is also on the county’s list of recent changes; a citizens’ advisory committee on data center siting met from May to September 2026 and posted a final report.

What Hancock County decides and what the state holds

The county enforces the state building codes through its Building Official, who may issue written policies to clarify how the county code (chapter 150) is applied, but may not waive its requirements. The county sets its own ILP and building fees, the park impact fee, inspection rules and zoning. Its policies say state design releases are needed for commercial and industrial buildings, churches, libraries, museums and schools, which the Building Department then inspects after the foundation inspection.

Hancock County building department: who handles permitting

The Planning Department handles zoning, ILPs, addresses, the Plan Commission and the BZA, and the Building Department handles building and trade permits, inspections and unsafe-building citations. In 2025 the two departments processed 753 permits, 158 of them for new single-family homes, and the Building Department made about 1,860 inspections.

Short on time to read all of this?

Get a free quote →
Hancock County permit contacts
OfficeContact
Planning & Building111 American Legion Place, Suite 146, Hancock County Annex, Greenfield, IN 46140; Building 317-477-1133, Planning 317-477-1134, fax 317-477-1184; Monday to Friday 8 a.m. to 4 p.m.
Health Department (septic)Suite 150, same building; 317-477-1125; septic permits 8 to 10 a.m. or by appointment
Surveyor (drainage, erosion control, ponds)Suite 171, same building; 317-477-1150
Highway Department (driveways)921 West Osage Street, Greenfield; 317-477-1130

Which office serves your address

Hancock County cities and towns
PlaceWho issues building permits
Unincorporated county, Spring Lake, Shirley (Hancock part)Hancock County Planning & Building
GreenfieldCity Planning & Building at City Hall (see the Greenfield guide)
FortvilleTown Planning & Building Department; apply at Town Hall or through the town’s portal
McCordsvilleTown Planning & Building Department; electronic filings only, through SDL
New PalestineThe town, under its own building code and permit forms
Cumberland (Hancock part)Town Planning Department, through its BS&A portal; the Marion County part of the town applies to Indianapolis until state law changes that on January 1, 2027
WilkinsonNot on the county’s list, and the published sources do not say; ask the county Planning Department

To check whether a parcel is unincorporated, use the GIS map linked from the county website or call Planning at 317-477-1134.

Hancock County permit types

Each kind of project has its own instruction sheet and application on the county’s permit requirements page: residential new home, residential accessory or alteration (attached and detached), non-residential, change of use, sign and electrical. ILP and building fees are often both due, so the county asks applicants to read both columns of the fee schedule.

Residential permits

  • New homes: the county’s instructions call for preliminary checks with Planning and Building, the Highway Department or INDOT, the Surveyor and the Health Department; five sets of a site plan drawn from a boundary survey at 1:20 to 1:40 and sealed by a licensed land surveyor or civil engineer, with the Surveyor’s drainage and floodplain approval stamp and an erosion and sediment control plan; two sets of construction plans (foundation, wall section, floor plans, elevations, engineered truss stamp); the septic permit receipt or proof of sewer and water tap fees; the driveway permit; and a warranty deed for tracts over 10 acres.
  • Accessory buildings, additions and remodels: use the accessory or alteration application; finished and unfinished garages and pole barns are priced differently.
  • Electrical: the electrical permit form names the power company, electrician, amperage and overhead or underground service, and the electrician certifies the work to the IRC or NEC.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Non-residential permits cover commercial, industrial, institutional, mixed-use, agricultural barn, public and multi-family buildings, and change-of-use permits. The ILP fee depends on floor area, and projects the Building Official sends to an engineering consultant pay $120 an hour for plan review. State design releases are required before the county permit for commercial work and the other building types listed in the county’s policies.

What comes before the building permit

  • Septic: the Health Department’s septic permit comes first; the county says you must have it before getting a building permit.
  • Drainage and floodplain: the County Surveyor stamps the site plan and handles erosion control and pond permits.
  • Driveways: the Highway Department’s driveway application, right-of-way permit and permit bond for county roads; INDOT for state highways.
  • Zoning: rezonings, variances, special exceptions, plats and development plans go to the Plan Commission or BZA, and the county requires a pre-filing meeting with a planner before any petition is filed.

Hancock County permit costs and fees

Permit fees come from the ILP and Building Department fee schedule effective July 1, 2024. Petition fees and the park impact fee were reset by Ordinance 2026-6D, adopted by the Board of Commissioners on June 16, 2026 and effective June 28, 2026.

Rather talk it over?

Call 1-855-478-4290 →
Hancock County ILP and building fees (effective July 1, 2024)
WorkILP feeBuilding fee
Single-family home, platted lot$175$375 plus $0.02 per sq ft over 1,200 sq ft (covered porches, garages and finished basements count); unfinished basement add $20
Single-family home, unplatted lot$250Same as above
Two-family home on one lot$175 platted / $250 unplatted$300 per unit
Residential remodel or addition (including covered porches)$110 up to 2,000 sq ft; $150 over$375, plus $0.02 per sq ft over 1,200 sq ft, plus $75 per inspection set at plan review
Detached garage, finished / unfinished$135$375 / $75 per inspection
Pole barn or mini barn over 200 sq ft, unfinished / finished$135$150 / $225
Deck$75$150 to $225 per inspection, set at plan review
Pool, above-ground / in-ground$110$75 / $150
Non-residential up to 1,000 sq ft$300$400
Non-residential 1,001 to 5,000 sq ft$325$400 plus $0.02 per sq ft over 1,000
Non-residential over 5,000 sq ft$400 plus $0.05 per sq ft$400 plus $0.10 per sq ft
Multi-family$300 plus $85 per unit$300 per unit
Electric upgrade or reconnect–$75
Other Hancock County charges
ItemFee
Re-inspections$75 first, $150 second, $225 third
Missed inspection$350 and an engineer’s letter
Building without a permitDouble the permit fee
Stop-work order$350 to resume work
Permit extension, once, up to 6 months after rough-in$100 residential; $200 commercial
Park impact fee (Ord. 2026-6D)$412 per new dwelling unit
Residential variance (Ord. 2026-6D)$400 plus $55 per additional variance
Residential special exception / rezoning$200 / $650 plus $20 per acre
Address assignment or verification$75 per site

Worked example: a 2,400-square-foot house on a platted lot, counting its garage and covered porch, pays a $175 ILP fee and a building fee of $375 plus 1,200 × $0.02 ($24), or $399, for $574, plus the $412 park impact fee: $986, before the septic and driveway permit fees.

Trade permits and who may pull them

The Building Department issues electrical permits itself, on its own form, and electrical work on a new service gets one inspection once all work is done and before the power company reconnects. Electrical upgrades and reconnections cost $75. The county posts a mechanical sign-off sheet with its policies, and plumbing is checked under the building permit, with underslab plumbing in place at the foundation inspection.

Rather not deal with the Hancock County building department?

Get a free quote →
  • Electricians: the electrical permit names the electrician and requires a signed statement that the work meets the IRC or NEC.
  • Plumbers: plumbing contractors hold state licenses; the county asks for the septic receipt or proof of paid sewer and water tap fees with a new-home application.
  • Owners: the county’s forms are signed by the property owner or applicant; ask the Building Department at 317-477-1133 before doing your own wiring or plumbing.

How to apply for a Hancock County building permit

1. Confirm the county has jurisdiction

Check that the parcel is unincorporated or in Spring Lake or Shirley, not in Greenfield or another town.

2. Talk to Planning and Building first

Ask about zoning, development standards and the codes that apply; any petition needs a pre-filing meeting with a planner.

3. Get the septic and driveway permits

The Health Department (8 to 10 a.m. or by appointment) and the Highway Department or INDOT come before the building permit.

4. Get the Surveyor’s stamp

The site plan needs the County Surveyor’s drainage and floodplain approval and an erosion control plan.

5. File the application

Submit the correct application with the sealed site plan and construction plans to Suite 146, and pay the ILP and building fees.

6. Post the permit

Put the permit in a front window, with the address visible from the street, before calling for inspections.

Review, corrections and what causes delay

The county’s instructions list the items that must come with a new-home application, and a missing septic receipt, driveway permit or Surveyor’s stamp holds the permit. ILPs and building permits are valid for 12 months, and all work and inspections must be finished in that year or a new permit is needed; one extension of up to six months is possible after the rough-in inspection if requested before the permit expires.

Inspections and certificates in Hancock County

Scheduling inspections is the property owner’s responsibility. Book them with the Building Department at 317-477-1133 24 to 48 hours ahead; inspections are not scheduled from answering-machine messages, email or fax. Inspectors come between 10 a.m. and 3 p.m. on the scheduled day, and cancellations must be called in before 9 a.m.

  • New homes: five inspections: footer or trench, foundation, rough-in, energy and final occupancy; the final is the certificate of occupancy.
  • Additions, alterations and accessory buildings: up to five inspections.
  • Decks: at least footer and final; pools: rough-in and final for in-ground, final only for above-ground.
  • Electrical: one inspection when the work is complete, before the utility reconnects.
  • Site rules: every job needs trash containment and a portable or on-site restroom, and the address must be visible from the road at the footer inspection.

Want this handled start to finish?

Get a free quote →

Footers must be dug or formed with rebar and grade set before concrete, at least 30 inches deep for frost. No building may be occupied before the final occupancy permit; the county’s policies set a $150-a-day fine for occupying early.

Indiana building code in Hancock County

The Building Official enforces chapter 150 of the Hancock County code and the state rules it applies. FEMA’s Community Status Book lists unincorporated Hancock County (community 180419) as participating in the National Flood Insurance Program, with maps effective March 17, 2014, and in the Community Rating System at class 7, which gives a 15% flood insurance discount.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Hancock County permit search and official resources

For copies of permits, plans or certificates of occupancy, use the county’s public records request page or call the Building Department at 317-477-1133. The Planning and Building departments publish an annual report with permit and inspection counts, and Plan Commission and BZA agendas, minutes and videos are posted on the county site.

Inspections are where schedules slip.

Get a free quote →

Hancock County building permit FAQs

Does Hancock County issue permits in Greenfield or Fortville?

No. The county covers unincorporated areas and the towns of Spring Lake and Shirley; Greenfield, Fortville, McCordsville, New Palestine and Cumberland have their own offices.

How much is a permit for a new house?

On a platted lot, a $175 ILP fee plus a $375 building fee and 2 cents per square foot over 1,200 square feet, and a $412 park impact fee.

Do I need a permit for a shed?

Not for a portable mini barn of 200 square feet or less; larger pole barns and mini barns need an ILP ($135) and a building fee of $150 or $225.

Do I need the septic permit first?

Yes. The Health Department issues septic permits from 8 to 10 a.m. or by appointment, and you need it before the building permit.

How do I schedule an inspection?

Call the Building Department at 317-477-1133 24 to 48 hours ahead; inspectors visit between 10 a.m. and 3 p.m.

How long is a permit good for?

Twelve months; one extension of up to six months is available after the rough-in inspection for $100 (residential).

Does the county have rules on data centers?

Yes. Ordinance 2026-6E, adopted June 16, 2026, sets how data center projects are sited and reviewed in the county’s jurisdiction.

Simplify Hancock County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Hancock County sooner?

Let Alliance prepare, file, and track your Hancock County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Hancock County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.