Shelby County, Indiana Building Permit Guide

To get a building permit in Shelby County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Shelby County Building Inspector, in the Courthouse Annex at 25 W. Polk Street, Shelbyville, issues building, electrical and plumbing permits for unincorporated Shelby County and the Town of Fairland on one improvement location permit application.

Authority: Shelby County Building InspectorFees: Schedules effective September 1, 2023Phone: 317-392-6480
Authority
County Building Inspector25 W. Polk St., Room 201
New house
$760 in county feesILP + building + plumbing + electric
Permit trigger
Over 200 sq ftAccessory buildings; decks and pools always
Hours
Mon–Thu 7–5Inspections 7:30–11:30 a.m.

In unincorporated Shelby County and the Town of Fairland, building permits come from the Shelby County Building Inspector at the Courthouse Annex, 25 W. Polk Street, Room 201, Shelbyville (317-392-6480), working beside the county Plan Commission office in the same room. One improvement location permit (ILP) application also serves as the building, plumbing and electrical application, and a complete file sent by email is usually issued in one business day. Under the fee schedules effective September 1, 2023, a new house costs $760 in county permit fees.

What requires a building permit in Shelby County?

The Building Inspector’s FAQ lists new dwellings, commercial buildings, remodels and additions to houses, accessory buildings over 200 square feet (and remodels or additions to them), decks and pools. The county’s “Projects that Require a Building Permit” chart goes further on remodeling work.

Building permit

  • New structures and additions, including porches, attached carports and lean-tos
  • Accessory buildings over 200 square feet and enclosed carports (three or more walls)
  • In-ground pools, and above-ground pools deeper than 42 inches (measured from the bottom to the skimmer)
  • Decks over 200 square feet, attached to the house, or with a floor more than 18 inches above ground
  • Removing structural walls, building interior walls, and replacing floor or ceiling joists or roof rafters
  • Converting an attic, basement or garage into living space, and replacing drywall on more than half the house
  • New window or door openings, or larger ones

No building permit

  • Accessory buildings under 200 square feet
  • Concrete patios and slabs, and non-enclosed carports
  • Fences (the county’s fence standards still apply)
  • Siding and re-roofing, with no more than two layers of roofing
  • Painting, floor coverings and same-size window or door replacements

Any job that needs a building permit and adds impervious surface also needs an ILP, and farm buildings in agricultural districts are exempt from building permits but still need an ILP. Electrical and plumbing permits are required where that work is part of the job.

What Shelby County decides and what the state holds

The county department says its role is to make sure new buildings comply with the Indiana building code, so the codes themselves come from the state commission; Shelby County sets the permit list, the fees, the zoning rules in its Unified Development Ordinance and its drainage and erosion ordinance. For most commercial work the county wants site plan approval and the state Construction Design Release before it issues permits.

Shelby County building department: who handles permitting

Two county offices share Room 201 of the Annex. The Building Inspector department handles permits, inspections and contractor registration; the Plan Commission department, headed by Planning Director Desiree Calderella, handles ILPs, site plans, floodplain administration and the Plan Commission and Board of Zoning Appeals (317-392-6338). The Plan Commission’s zoning covers the unincorporated county, while the Building Inspector’s page says it also inspects in Fairland.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Shelby County
PlacePermit office
Unincorporated Shelby CountyShelby County Building Inspector, 25 W. Polk St., Room 201; 317-392-6480
Town of FairlandListed by the Building Inspector as served by the county; the county pages also give a town consultant contact
City of ShelbyvilleCity Planning & Building Department, City Hall (317-392-5102)
Town of MorristownTown Planning & Building
Edinburgh (only part lies in Shelby County)Town Building & Zoning
St. Paul (only part lies in Shelby County)Decatur County Area Plan Commission

The Building Inspector office is open Monday to Thursday, 7 a.m. to 5 p.m., closed from noon to 1 p.m.; fax 317-421-8365. For an address near a town line, the county GIS map shows the parcel and its location.

Shelby County permit types

The ILP application, revised August 11, 2026, doubles as the building, plumbing and electrical application. It asks for the owner and contractor, the township, the proposed use, the cost of the work, floor areas, the height to the peak and whether drywall, electric and plumbing are included, and it lists the attachments: a site plan, the Health Department approval form, a homeowner affidavit if the owner is the contractor, building elevations for a new house, flood hazard information, and a State Design Release for commercial construction.

Residential permits

A new house follows the county’s New Home Process. The Planning Director first checks that the lot is buildable (a lot in its current shape before 2008 is grandfathered) and outside a flood hazard area. A soil scientist then samples the lot, and a site plan certified by a professional surveyor or engineer goes to the Site Plan Committee, which meets every Thursday and takes plans filed by noon on Tuesday. Additions, remodels, garages, decks and pools use the same ILP application with a simpler site plan showing setbacks and the distance to the septic system and well.

Commercial permits

Commercial, industrial and institutional buildings need site plan approval, billed at $120 an hour of review, and in most cases the state Construction Design Release, and they pay an extra $0.06 per square foot on top of the building permit line. Signs need a sign permit from the Planning Director ($300 for a commercial sign).

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Health Department approval. Every ILP needs the Health Department’s sign-off, and new homes need a septic permit unless served by the Waldron Conservancy District.
  • Access permit. The county highway department issues driveway access permits for county roads (office 25 W. Polk St., Room 206, 317-392-6330); on a state highway the INDOT Greenfield District (32 South Broadway Street, Greenfield, 317-462-7751) must also approve.
  • Floodplain permit. Building or grading in a Flood Hazard Area shown on the Indiana DNR Division of Water best available data needs a Floodplain Development Permit from the Planning Director and IDNR.
  • Zoning relief. Rezonings go to the Plan Commission and County Commissioners; use variances and special exceptions go to the BZA, and development standards variances to the BZA or its hearing officer.
  • Drainage and erosion. Erosion control on site follows Article 10 of the county’s Storm Drainage, Erosion and Sediment Control Ordinance.

Shelby County permit costs and fees

Two county schedules, both effective September 1, 2023, apply: the Plan Commission fee schedule (ILPs and land-use petitions) and the Building Inspector fee schedule (building, plumbing and electric). Cash or check is preferred; card payments carry a 4% transaction fee.

Shelby County Building Inspector fees (effective September 1, 2023)
WorkFee
New dwelling or primary structureBuilding $220; plumbing $165; electric $165
Room additions and remodels under 50% of the dwellingBuilding $165; plumbing $110; electric $110
Room additions and remodels of 50% or moreBuilding $220; plumbing $165; electric $165
Manufactured homeBuilding $165; plumbing $55; electric $110
Accessory over 400 sq ft, no drywall / with drywallBuilding $125 / $165; plumbing $110 / $165; electric $110
Accessory 201–400 sq ftBuilding $55; plumbing $110; electric $110
Deck or porch$90
Pool above ground / in ground$55 + $55 electric / $110 + $110 electric
Electric only: new service / upgrade, pole, temporary or generator$110 / $55
Commercial, industrial, institutionalAdditional $0.06 per sq ft
Work started without a permitDouble the permit fee

Rather talk it over?

Call 1-855-478-4290 →
Shelby County Plan Commission fees (effective September 1, 2023)
ItemAgricultural and residential / commercial
ILP, new single-family dwelling$210
ILP, primary commercial or industrial structure$380
ILP, accessory or addition 400 sq ft and under / over 400 sq ft$70 / $140 (commercial $240)
Rezoning$575 / $925
Development standards variance$300 / $475
Site plan$70 / $120 per hour of review

Worked example for a new house: ILP $210 + building $220 + plumbing $165 + electric $165 = $760, with the $300 Health Department septic permit on top if the lot needs one. ILP fees do not apply to structural work that adds no floor area.

Trade permits and who may pull them

Shelby County keeps a contractor list rather than a license. General contractors pay a $90 listing fee and file a certificate of general liability insurance and a $5,000 surety bond payable to the Shelby County Commissioner; all registrations expire on December 31.

  • Building and electrical: any contractor on the county list may obtain the ILP, building and electrical permits, and so may an owner who files a Homeowner Affidavit. An electric-only job uses the separate Electrical Permit Application, with no site plan or Health Department approval.
  • Plumbing: only plumbers on the county list may obtain plumbing permits, except a homeowner who will live in the house. Plumbing contractors register with a copy of each plumber’s state registration card; listing fees are $55 for a contractor, $40 for a journeyman and $20 for an apprentice.
  • Septic installers: register with the Health Department for $50.

The FAQ adds the county’s electrical rules of thumb: a breaker panel set 6 feet 6 inches from the floor to its top, with at least 36 inches of clear working space, and never in a clothes closet, bathroom, cabinet or damp area.

Rather not deal with the Shelby County building department?

Get a free quote →

How to apply for a Shelby County building permit

1. Confirm the jurisdiction

Use the GIS map to check that the parcel is outside Shelbyville, Morristown, Edinburgh and St. Paul.

2. Prepare the site plan

Show the lot size, existing buildings, the new structure’s setbacks and its distance from the septic system and well; a new house needs a certified site plan approved by the Site Plan Committee.

3. Get Health Department approval

The department reviews septic and well distances; new homes need a septic permit.

4. Get the access permit

From the county highway department, plus INDOT on a state highway.

5. File the ILP application

Email it with the site plan and any homeowner affidavit, or file in person at Room 201 after the Health Department signs off.

6. Pay and receive the permits

Staff contact you for payment and send the ILP, building, plumbing and electrical permits by email.

Review, corrections and what causes delay

Emailed files are generally issued in one business day and walk-in files the same day; the Health Department review sits in between. A new house waits for the Site Plan Committee’s Thursday meeting, and the county will not issue permits until every committee member has approved the plan, so a zoning, drainage or septic question from any one member holds the permits. A new lot, such as a piece split from farm ground, must go through the county’s platting process before it can get a building permit.

Inspections and certificates in Shelby County

Inspections need 24 hours’ notice and are made Monday to Thursday between 7:30 and 11:30 a.m. The permit holder calls each office that inspects: the Building Inspector, the Plan Commission and the Health Department for the septic system. Erosion control must be in place under Article 10 of the drainage ordinance.

  • Footings: at least 30 inches below final grade (not existing grade), at least 6 inches thick and 12 to 27 inches wide depending on stories, basement, brick veneer and slab.
  • Electrical service: Duke Energy and Rush-Shelby Energy prefer the meter base 6 feet 6 inches above final grade to the center of the socket.
  • Permit life: building, plumbing and electrical permits expire one year after issue and may each be renewed twice for a renewal fee.

Accessory buildings must meet the setbacks in Article 2 of the Unified Development Ordinance, measured from the road right-of-way (typically 25 feet from the road’s center): for example 50 feet front and 10 feet side and rear in A1, and 35 feet front and 5 feet side and rear in R1, not in the front yard.

Indiana building code in Shelby County

FEMA’s Community Status Book lists unincorporated Shelby County (community 180235) as participating in the National Flood Insurance Program, with flood maps effective June 20, 2024; the City of Shelbyville has its own listing. In June 2026 the Plan Commission heard RZ 26-11, a data center overlay district amendment to the UDO for the unincorporated county, and voted 8-0 to discuss it again on July 28 and to vote on it at a special meeting on August 12, 2026; ask the Plan Commission office whether the overlay was adopted.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Shelby County building permit FAQs

Do I need a permit for a shed in Shelby County?

Not under 200 square feet. A building of 201 to 400 square feet costs $55 for the building permit plus a $70 ILP.

Do I need a permit for a fence or a new roof?

No. The county chart lists fences, siding and re-roofing as needing no building permit, though fence standards still apply.

How much does a new house cost in county permit fees?

$760: a $210 ILP plus $220 building, $165 plumbing and $165 electric, and a $300 septic permit where needed.

Can I pull my own permits as a homeowner?

Yes, with a Homeowner Affidavit for the ILP, building and electrical permits; a homeowner may take out the plumbing permit only for a house they will live in.

Does the county issue permits in Shelbyville?

No. The City of Shelbyville’s Planning & Building Department issues its own permits; St. Paul is regulated by the Decatur County Area Plan Commission.

How long does a permit take?

About one business day for an emailed application and the same day in person, once Health Department approval is in hand.

How long is a permit valid?

One year from issue, with up to two paid renewals.

Shelby County permit search and official resources

The Building Inspector department keeps the record of every approved permit and inspection; ask the office at 317-392-6480 for a property’s permit history, and the Plan Commission (317-392-6338) for ILPs, site plans and zoning decisions. Plan Commission and BZA minutes and annual reports are posted on the county website.

Inspections are where schedules slip.

Get a free quote →

Simplify Shelby County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Shelby County sooner?

Let Alliance prepare, file, and track your Shelby County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Shelby County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.