Rush County, Indiana Building Permit Guide

To get a building permit in Rush County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Rush County Planning and Zoning, in Room 211 of the Courthouse in Rushville, issues the improvement location permit required before any construction in the unincorporated county, Carthage and Glenwood, under the Unified Development Ordinance adopted April 6, 2026.

Authority: Rush County Planning and ZoningOrdinance: UDO adopted April 6, 2026Phone: 765-932-3090
Authority
Area Plan officeCourthouse, Room 211
Key permit
Improvement location permitBefore any construction or new use
Septic permit
$250 new systemRush County Health Department
Hours
Mon–Fri 8–4765-932-3090

In Rush County, construction outside Rushville is permitted by Rush County Planning and Zoning, the Area Plan Commission’s office in the Courthouse, 101 East Second Street, Room 211, Rushville (765-932-3090). Its Unified Development Ordinance, adopted April 6, 2026, requires an improvement location permit (ILP) before work starts on any structure or new use in the unincorporated county, the towns of Carthage and Glenwood and the rural centers. The Commissioners raised the planning fee schedule by 15% on March 9, 2026, and a data center moratorium was extended again in August 2026.

What requires a permit in Rush County?

Section 8.11 of the Unified Development Ordinance (UDO) is broad: an ILP from the Administrator is required before construction begins on any structure or before a use is established on any land. A change from one class of use to another, and any use that adds parking spaces, also needs an ILP, and no permit issues unless the project meets the UDO and any conditions attached to earlier approvals.

Permit required

  • New houses, additions and accessory buildings
  • Swimming pools, which cannot be installed without an ILP
  • Signs: erecting, enlarging, moving or converting any sign needs a sign permit
  • Wind energy systems and solar systems that need permits under the solar rules
  • A change of use, or a use that adds parking

Other approvals

  • A Floodplain Development Permit for work in a special flood hazard area
  • A septic permit from the Health Department, or a sewer hookup in the Western Rush County district
  • A certificate of occupancy once the work is complete
  • A Certificate of Compliance for a change in use or exterior work that needs no ILP

Agricultural buildings pay no permit fee but must still meet the UDO. Every ILP applicant in an Agricultural District signs the county’s Notice of Agricultural Activity, which warns that livestock, manure application, spraying, dust and machinery noise at all hours are allowed and protected by Indiana’s right-to-farm law.

What Rush County decides and what the state holds

The county controls zoning, subdivision, floodplain development, solar and other land-use rules through the UDO and its Area Plan Commission. The county’s published office list and phone directory show no separate building department, and its planning pages describe the ILP and the certificate of occupancy as the county’s permits. State rules still apply to the building itself: Class 1 structures need the state Construction Design Release before construction.

Rush County building department: who handles permitting

The Area Plan Commission’s office, run by Executive Director Mike Holzback, administers the UDO. The UDO replaces the earlier ordinances for Rush County and the towns of Carthage and Glenwood, whose town councils each appoint a member of the commission, and it also governs the rural centers: the unincorporated communities such as Arlington, Milroy, Manilla and New Salem, and land within a quarter mile of Rushville’s boundary.

Short on time to read all of this?

Get a free quote →
Who issues permits in Rush County
PlacePermit office
Unincorporated Rush County and its rural centersRush County Planning and Zoning, Courthouse Room 211; 765-932-3090
Town of CarthageRush County Planning and Zoning under the UDO
Town of Glenwood (only part lies in Rush County)Rush County Planning and Zoning under the UDO
City of RushvilleCity Planning & Zoning, City Hall, 330 N. Main Street, Suite 200; 765-932-3735

The county office is open Monday to Friday, 8 a.m. to 4 p.m. Eastern; fax 765-938-1163. The Board of Zoning Appeals meets on the first Wednesday of each month at 5:30 p.m. and the Area Plan Commission at 6:00 p.m., normally in the Courthouse Assembly Room. Inside Rushville, the city’s own office issues ILPs and new construction permits for houses and commercial buildings.

Two other county offices often come into a building project. The Surveyor (Courthouse Room 104, 765-932-3184) maintains every regulated drain, and the Drainage Board meets right after each regular Commissioners’ meeting; the Highway Department at 1352 East State Road 44 (765-932-2926) is open weekdays from 7 a.m. to 4 p.m.

Rush County permit types

The Planning and Zoning office handles ILPs, subdivisions, replats, rezonings, variances and special exceptions. Application packets come from the office and, the UDO says, online; filing dates follow the office’s annual meeting and filing calendar.

Residential permits

  • Houses, additions and accessory buildings: an ILP before construction starts, with setbacks and lot standards from the zoning district, plus the rural center standards in Chapter 6 where they apply.
  • Pools: a swimming pool needs its own ILP before installation.
  • Fences in rural centers: side, street-side and rear-yard fences may be up to 6 feet tall and fully opaque, must keep driver sight lines clear and may not sit in rights-of-way or drainage and utility easements; farm fences are exempt from those standards except vision clearance.
  • Certificate of occupancy: no building erected or altered after the UDO’s adoption may be occupied until one is issued.
  • Certificate of Compliance: written confirmation that a property, use or exterior change meets the UDO, checked within five days of filing.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Larger developments may need site plan review under Section 8.6 before the ILP (public utility structures, including substations, always do), and proposals such as solar energy systems carry their own application fee, decommissioning and emergency-plan rules. Class 1 buildings need the state Construction Design Release from the Indiana Department of Homeland Security before construction. Business signs follow the UDO sign permit process: the Administrator says within 5 business days whether the application is complete and issues or refuses the permit within 10, and a sign permit lapses if the work is not finished within 6 months.

What comes before the ILP

  • Septic. Contact the Health Department before installing any onsite system (765-932-2216). In Walker and Posey townships, mainly Arlington, Homer and Manilla, owners must connect to the Western Rush County Regional Sewer and Water District where it is available (765-663-5871) and complete its form before a septic application is processed. The Health Department’s 2026 permit process sheet says its Environmental Health Specialist keeps office hours at the Courthouse, Room 105, from 8 a.m. to 4 p.m. but is often in the field, so call for an appointment (765-932-3103). The septic application asks whether the job is a new home, replacement or repair, the number of bedrooms and bedroom equivalents, whether the house has a garbage disposal, jetted tub or geothermal well, the water supply, the acreage and the installer’s name.
  • Floodplain. A Floodplain Development Permit from the Floodplain Administrator before any development in a special flood hazard area. The application includes a site plan with existing and proposed grades, a surveyor’s or engineer’s benchmark letter, proof of approved sewer or septic, the lowest floor elevation in NAVD 88 for Zones A and AE, flood opening details and, for work on an existing building, a detailed cost quote with a certified valuation of the structure. A new house’s lowest floor, basement included, must be at or above the flood protection grade, the base flood elevation plus 2 feet.
  • Drainage and roads. The Surveyor keeps the regulated drains and the county storm drainage policy; the highway department issues tile crossing permits and handles utility work in county right-of-way under its ordinance.
  • Zoning relief. Rezonings go through the Area Plan Commission to the Commissioners; variances and special exceptions go to the BZA.

Rather talk it over?

Call 1-855-478-4290 →

Rush County permit costs and fees

The UDO leaves permit and petition fees to a schedule set by resolution of the County Commissioners and kept in the Planning and Zoning office; that schedule is not posted online. On March 9, 2026 the Commissioners approved the Area Plan Commission’s recommendation to raise the fee schedule by 15%, which the director said would bring it closer to neighboring counties.

Rush County fee rules and published fees
ItemFee or rule
ILP, petitions and other planning feesCommissioners’ fee schedule, raised 15% on March 9, 2026; copies at Room 211
Construction started before the ILPTwice the current permit fee
Agricultural buildingsNo permit fee; all other UDO rules apply
Unpaid fees on any earlier permit or violationNo final action until paid
Septic permit, new system (Health Department)$250
Septic repair / renewal / hook-up$100 / $30 / $100

Because the county schedule is kept only in the office, ask Planning and Zoning for the current ILP and petition amounts before you file; the septic figures come from the Health Department’s posted fee schedule. Inside Rushville, the city posts its own applications and fees.

Trade permits and who may pull them

Rush County’s planning pages describe no county electrical, plumbing or mechanical permits and no county contractor licensing or registration. Plumbing work must still be done by a plumber licensed by the state, which licenses plumbing contractors and journeymen.

  • Septic installers: the Health Department keeps a list of septic system installers and soil scientists for residential systems, and commercial systems go through its Environmental Health Specialist.
  • Utility work in county roads: utilities sign the county utility agreement under the right-of-way utility ordinance.
  • Field tile: crossing a county road with drainage tile needs the highway department’s tile crossing permit.

In Rushville, the city’s Planning & Zoning office sets its own requirements for permits inside city limits.

Rather not deal with the Rush County building department?

Get a free quote →

How to get a Rush County improvement location permit

1. Confirm the jurisdiction

Check the parcel on the county’s GIS (Beacon) map and confirm it is outside Rushville’s city limits.

2. Check the zoning district

The UDO sets uses and setbacks; rural centers have extra standards in Chapter 6.

3. Arrange septic or sewer

Contact the Health Department, or the Western Rush County district in Walker and Posey townships.

4. Check the floodplain

Get a Floodplain Development Permit if the site is in a flood hazard area.

5. File the ILP

At Room 211 of the Courthouse, with the site plan and, in an Agricultural District, the signed Notice of Agricultural Activity.

6. Pay and build

Pay the fee from the Commissioners’ schedule; start only after the ILP issues.

7. Get the certificate of occupancy

Request it when the work is complete, before anyone moves in.

Review, corrections and what causes delay

Simple projects are approved by staff; projects that need a rezoning, variance or plat wait for the monthly BZA or Area Plan Commission meeting and the Commissioners. Unpaid fees from any earlier permit or violation stop the file. An ILP issued under the older ordinances can still be completed if construction began within one year of the UDO taking effect.

Inspections and certificates in Rush County

The UDO ties completion to the certificate of occupancy: it certifies that the building, use, parking, landscaping and other required improvements match the ordinance and any conditions of approval. The Floodplain Administrator may make periodic inspections of finished projects in flood areas, and the Health Department inspects septic systems it permits. Ask Planning and Zoning (765-932-3090) for the certificate when the work is finished.

For written proof that an existing property or use complies, apply for a Certificate of Compliance; it confirms compliance on the date issued but does not authorize new construction.

Indiana building code in Rush County

FEMA’s Community Status Book lists unincorporated Rush County (community 180421) as participating in the National Flood Insurance Program, with a current map dated January 7, 2015. The county also has a moratorium on data centers: the Commissioners adopted 90 days on February 13, 2026, then six months on March 9, 2026, and on August 10, 2026 approved a further six-month extension; the UDO was adopted without data center language, and the Area Plan Commission’s November 4, 2026 agenda listed an update from its data center committee.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Rush County permit FAQs

Do I need a permit to build in rural Rush County?

Yes. The UDO requires an improvement location permit before construction of any structure or a new use, issued by Planning and Zoning in Room 211 of the Courthouse.

Does Rush County issue permits in Rushville?

No. The City of Rushville’s Planning & Zoning office issues ILPs and new construction permits inside the city.

How much is an ILP?

The amount is on the Commissioners’ fee schedule kept at the office, raised 15% in March 2026; building before the ILP doubles it, and farm buildings pay nothing.

How much is a septic permit?

$250 for a new system and $100 for a repair, from the Rush County Health Department.

Do I need a permit for a pool?

Yes. The UDO says a swimming pool cannot be installed without an ILP.

How high must a house in the floodplain be built?

To the flood protection grade, the base flood elevation plus 2 feet, with a Floodplain Development Permit.

When do the BZA and Area Plan Commission meet?

The first Wednesday of each month, the BZA at 5:30 p.m. and the commission at 6:00 p.m.

Rush County permit search and official resources

Planning and Zoning keeps a record of every ILP in its office, and floodplain permit records are open for public inspection at Room 211; ask by phone or in person. Area Plan Commission and BZA minutes and the Commissioners’ minutes are posted on the county website.

Inspections are where schedules slip.

Get a free quote →

Simplify Rush County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Rush County sooner?

Let Alliance prepare, file, and track your Rush County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Rush County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.