Skip to main content

Decatur County, Indiana Building Permit Guide

To get a building permit in Decatur County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Decatur County’s Area Plan Office in the courthouse at Greensburg issues building, electrical and sign permits, zoning approvals and inspections for the whole county except the City of Greensburg, with plans reviewed over two weeks.

Authority: Decatur County Area Plan OfficePlan review: 2 weeks (since Dec. 1, 2024)Phone: 812-663-8451
Authority
Area Plan Office150 Courthouse Square, Suite 117
Covers
All of the countyExcept the City of Greensburg
Inspections
48 hours’ notice$100 re-inspection fee
Septic
Board of Health812-663-8301, by appointment

In Decatur County, the Area Plan Office, led by Area Plan Director Doug Westerfeld in Suite 117 of the Decatur County Courthouse, 150 Courthouse Square, Greensburg (812-663-8451, Monday to Friday 8 a.m. to 4 p.m.), issues building permits, electrical permits, sign permits and zoning approvals and does the building inspections everywhere in the county except the City of Greensburg. Since December 1, 2024 every set of plans has a two-week review period. Permit and inspection fees are paid when you apply, inspections need 48 hours’ notice, and a re-inspection costs $100.

What requires a building permit in Decatur County?

The Area Plan Office lists its jobs as zoning, variances, special exceptions, pond permits, new addresses and address changes, survey approvals, building permits, electrical permits, sign permits and building inspections. Its inspection sheet shows the kinds of work it permits: houses and additions, businesses, churches, schools and industries, basements, warehouses, manufactured housing, and private garages, pole barns and sheds.

Permits from the Area Plan Office

  • New houses, additions and basements
  • Garages, pole barns and sheds
  • Manufactured homes, set by a licensed manufactured home installer
  • Commercial, industrial, institutional and church buildings
  • Swimming pools and ponds, each with its own document list
  • Electrical and sign permits

Approvals from other offices

  • Septic permit: Decatur County Board of Health
  • Driveway, road crossing and transportation permits: County Highway Department
  • Site development permit for erosion and sediment control when more than an acre of dirt is excavated
  • State driveway permit on state highways
  • Lake permit for lots at Lake Santee

The county zoning ordinance includes articles on flood hazard areas, plot plan review, wind energy systems, solar energy facilities, wireless towers, animal waste, kennels and transportation management, and the county’s Stormwater Management Ordinance 2023-14 comes with a stormwater technical standards manual.

What the county decides and what the state holds

The county decides zoning, permit documents, review times, inspection stages and fees. The building standards are the state’s, and the county’s inspection checklist cites the 2020 Indiana Residential Code section by section. Commercial and industrial buildings need a full Construction Design Release from the Indiana Department of Homeland Security before the county permit, along with any state variance needed to waive sprinklers, unless 675 IAC 12-6-4 exempts the work.

Decatur County building department: who handles permitting

The Area Plan Office handles every step from zoning to final inspection outside Greensburg. Because it covers all of the county except Greensburg, it also serves the towns; inside Greensburg, contact the city.

Short on time to read all of this?

Get a free quote →
Who issues building permits in Decatur County
PlaceBuilding permits and zoning
Unincorporated Decatur CountyDecatur County Area Plan Office
Westport, Millhousen, New Point and the Decatur County part of St. PaulDecatur County Area Plan Office (it covers all of the county except Greensburg)
City of GreensburgOutside the county office’s area; contact the City of Greensburg
Area Plan Office contacts
DetailInformation
OfficeDecatur County Courthouse, 150 Courthouse Square, Suite 117, Greensburg, IN 47240
Phone / fax812-663-8451 / 812-663-8459
HoursMonday to Friday, 8 a.m. to 4 p.m.
DirectorDoug Westerfeld, Area Plan Director
BoardsArea Plan Commission and Board of Zoning Appeals, each on the first Wednesday of the month, Room 106 of the courthouse

Decatur County permit types

Improvement location permits can be started online through the county’s GeoPermits site, and the office posts a document list for each kind of permit. Plans must be on 8½ × 11, 8½ × 14 or 11 × 17 paper only.

Residential permits

  • What to bring. The property record card from the Assessor (Room 105), a copy of the deed from the Recorder (Room 121), the septic permit, a hand-drawn sketch plan showing the building and its setbacks from the road and property lines, the driveway permit, a site development permit where more than an acre is dug, a county map showing the location, and the building plans.
  • Building plans. Foundation plan, a floor plan of each floor with windows and doors, a cross-section from footers to shingles with member sizes, an electrical diagram, a plumbing diagram, truss drawings from the supplier or an engineer’s stamp, an insulation plan or RESCheck report, and the spec sheet and layout for any manufactured floor system.
  • Pole barns. Pole holes are inspected before poles are set and must be at least 36 inches deep.
  • Manufactured homes. The footer goes at least 24 inches below finished grade, and the home is inspected for anchoring before skirting goes on.
  • Pools and ponds. A pool permit needs the property record card, deed, an aerial view with the pool area marked and a township map. A pond needs the same records, the county pond and lake requirement form and a drainage map from the Soil and Water Conservation District (812-663-8674); a pond that does not meet the ordinance goes to the BZA, with papers due by the first Wednesday for a hearing at 6:30 p.m. on the first Wednesday of the next month.

Commercial permits

The commercial and industrial checklist asks for the property record card, the deed ($1 a page from the Recorder), a plot plan, a site development permit with erosion and sediment control plans, a state or county driveway permit, site development plans for water, sewer, roads and electric, the full state design release, a state septic permit from the Indiana Department of Health, any state sprinkler variance, a full set of building plans, a COMcheck energy report and a stormwater drainage report.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Rezoning applications go to the Area Plan Commission and need an aerial view of the 1.5 to 2.99 acres to be rezoned, preliminary septic approval from the Board of Health and a soil test; variances and special exceptions go to the Board of Zoning Appeals.
  • Septic. Call the Board of Health at 812-663-8301 for an appointment; the Health Department is at 315 South Ireland Street.
  • Driveways. The County Highway Department garage, 959 South County Road 200 West ((812) 663-2682, Monday to Thursday 7 a.m. to 5 p.m.), issues driveway, road crossing and transportation permits and posts its highway standards manual and driveway specifications; state highways need the state permit (812-372-7837 on the county’s checklist).
  • Erosion control. A site development permit under the county’s erosion and sediment control rules when more than an acre is excavated.
  • Addresses and surveys. New addresses and survey approvals come from the Area Plan Office; the County Surveyor’s page (812-663-6526) posts the 2025-5 survey ordinance.

Decatur County permit costs and fees

The Area Plan Office collects building permit and inspection fees when you apply, by check payable to the Decatur County Area Plan Commission. Its posted documents price pools, ponds, zoning petitions and re-inspections, but no building permit fee schedule is posted with them, so call 812-663-8451 with the size and type of building for a figure.

Charges named in Decatur County’s permit documents
ItemAmount
Building permit and inspection feesPaid at application; checks to the Decatur County Area Plan Commission
Re-inspection$100
Pool permit (pool document updated August 2017)$220 above ground; $260 in ground
Pond permit (pond document updated March 2023)$385 if the pond meets the ordinance; otherwise a $485 application and a BZA petition
BZA petition, special exception or variance$385 or $485, non-refundable, payable to the Area Plan Office
Property record card (Assessor)No charge
Copy of deed (Recorder)$1 per page
State design release (Class 1 work)Paid to the state with the release application

Rather talk it over?

Call 1-855-478-4290 →

Inspection fees are paid up front with the permit, and each re-inspection adds $100. Plan time as well as money: every set of plans now has a two-week review, and the septic, driveway and (over an acre) site development permits are on the list of papers to bring with the application.

Trade permits and who may pull them

The Area Plan Office issues electrical permits as well as building permits, and residential plans must include an electrical diagram and a plumbing diagram. Inspections cover rough electric and rough plumbing for houses and additions, rough electric for garages and pole barns, under-slab plumbing in outbuildings and the meter base for manufactured homes.

  • Plumbing. Plumbing contractors hold a state license from the Indiana Plumbing Commission; the county’s documents do not add a local plumbing license.
  • Manufactured home installers. Mobile home footers must be installed by a licensed manufactured home installer.
  • Trusses. Roof trusses must be bought from a supplier, or the plans for site-built trusses stamped by an engineer.
  • Contractors and owners. The county’s pages do not describe a contractor registration or say who may sign for a permit, so ask the Area Plan Office when you call for the fee.

How to apply for a Decatur County building permit

1. Check the location

Inside Greensburg, go to the city; everywhere else, to the Area Plan Office. Look up the parcel on the county’s Beacon GIS.

2. Collect the records

Get the property record card from the Assessor first, then the deed from the Recorder.

3. Book the septic appointment

Call the Board of Health at 812-663-8301; get the driveway permit from the Highway Department.

4. Draw the sketch plan

Show the building’s size and setbacks on letter-size paper, and prepare the building plans.

5. Apply

Start the ILP online through GeoPermits or at Suite 117, and pay the permit and inspection fees.

6. Allow two weeks

Every set of plans has a two-week review period.

7. Call for inspections

Give 48 hours’ notice for each stage.

Rather not deal with the Decatur County building department?

Get a free quote →

Review, corrections and what causes delay

The two-week review applies to all plans, and the county’s list asks for every plan part, from the foundation plan and cross-section to the electrical and plumbing diagrams, truss papers and insulation plan, so bring a complete set. Oversized paper is not accepted. Zoning cases wait for the monthly Area Plan Commission or BZA meeting on the first Wednesday. Under state law since January 1, 2026, a local unit has three business days to confirm a one- or two-family application is complete and seven business days to complete plan review, and lets an applicant use a qualified private reviewer instead, at the applicant’s cost.

Inspections and certificates in Decatur County

Call the Area Plan Office at least 48 hours before each inspection. The county’s inspection sheet, updated February 2026, sets the stages by building type:

Decatur County inspection stages
StageWhat is checked
Houses, additions, businesses, churches, schools, industriesFooter before concrete; foundation; crawlspace or slab insulation; rough framing, electric and plumbing; insulation; final before occupancy
BasementsFooter; walls before concrete; floor before concrete; exterior insulation; drainage tile
Warehouses and bulk storageFooter; foundation; rough framing, electric and plumbing; final before occupancy
Manufactured housingFooter; foundation; meter base; anchoring before skirting; plate and crawlspace insulation; final before occupancy
Private garages, pole barns and shedsFooter; foundation; pole holes before poles are set; under-slab plumbing; rough framing and electric; final before use

The code minimum inspection sheet tells builders what inspectors look for: footings at least 24 inches below final grade, half-inch anchor bolts within 12 inches of corners and no more than 6 feet apart, ground falling 6 inches in the first 10 feet away from the foundation, and crawlspace vents, vapor barriers and access openings. Each re-inspection costs $100.

Indiana building code in Decatur County

The Area Plan Office inspects to the state codes, citing the 2020 Indiana Residential Code on its checklists, and applies the county zoning ordinance, subdivision control ordinance, construction standards and stormwater ordinance. FEMA’s Community Status Book lists unincorporated Decatur County (community 180430) as participating in the National Flood Insurance Program, with flood maps effective October 16, 2013; Greensburg (180043) participates separately with maps of the same date, and the county zoning ordinance has a flood hazard areas article.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Want this handled start to finish?

Get a free quote →

Decatur County permit search and official resources

Ask the Area Plan Office for copies of past permits, inspection records, variances or address assignments. Property record cards come from the Assessor and deeds from the Recorder in the courthouse, and the county’s GIS maps are on Beacon.

Inspections are where schedules slip.

Get a free quote →

Decatur County building permit FAQs

Who issues building permits in Decatur County?

The Area Plan Office in the courthouse, 812-663-8451, for the whole county except the City of Greensburg.

How long does plan review take?

Since December 1, 2024, all plans have a two-week review period.

Do the towns issue their own permits?

The county says its Area Plan Office covers all of Decatur County except Greensburg, so Westport, Millhousen, New Point and the county’s part of St. Paul are served by it.

How much notice do inspections need?

48 hours for every inspection; a re-inspection costs $100.

What do I need for a pole barn?

A permit with a sketch plan, then inspections of the footer or pole holes (at least 36 inches deep), rough framing and electric, and a final before use.

Who issues septic permits?

The Decatur County Board of Health, by appointment at 812-663-8301; commercial projects list a state septic permit from the Indiana Department of Health.

Do I need an erosion control permit?

Yes, a site development permit for erosion and sediment control when more than an acre of dirt is excavated.

Simplify Decatur County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Decatur County sooner?

Let Alliance prepare, file, and track your Decatur County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Decatur County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.