The DeKalb County Department of Development Services, 301 South Union Street in Auburn ((260) 925-1923, Monday to Friday 8:00 a.m. to 4:00 p.m.), handles planning, zoning, improvement location permits, building permits and inspections. Its building department covers unincorporated DeKalb County and every town and city except Auburn (with its extraterritorial area) and Altona, while Hamilton is served by Steuben County. A house costs $0.10 per square foot of floor area with a $50 minimum on the schedule updated July 29, 2024, and every contractor working under county permits must hold a $20 annual county registration.
What requires a building permit in DeKalb County?
The county asks owners to contact Development Services before building or adding on, digging a pond, starting a business or making most other improvements, because a permit is needed for most of them. Two permits are in play: the improvement location permit (ILP), the zoning approval, and the building permit, the code approval with inspections. The county publishes separate exemption lists for each.
No building permit
- Grade-level patios, sidewalks and driveways
- Painting, paneling, new siding, gutters and insulation
- Same-size window, door, storm window and storm door replacement
- Chimney replacement and cosmetic work
- Fences (the building permit page says an ILP is needed)
- Above-ground pools (ILP needed; a deck around one needs both permits)
- Sheds under 300 square feet with no permanent foundation (ILP needed), and pre-built sheds under 500 square feet
No ILP
- Ground-level patios with no structure planned on or over them
- Painting, paneling, siding, gutters, insulation and like-size windows and doors
- Roofing replacement and chimney replacement
- Chain-link or wire fences that do not form a visual barrier, and any fence 4.5 feet tall or less
- Streets and sidewalks
- Driveways (a Highway Department permit is still required)
The two county pages disagree on fences: the building permit page says every fence needs an ILP, while the ILP page exempts fences 4.5 feet tall or less and see-through chain-link or wire fences, so ask before you build. A re-roof needs no ILP, but the building permit schedule charges $30 for roofing when a contractor is hired to replace or reshingle it. The ILP form flags flood zones, the airport compatibility and wellhead protection overlays and possible wetlands; the county sends wetland questions to the Indiana Department of Environmental Management, and the form says no permit issues without the state and federal papers.
What the county decides and what the state holds
The county sets its exemption lists, fees, contractor registration and zoning through its Unified Development Ordinance, floodplain ordinance and building department regulations. The construction codes are the state’s, adopted by the Fire Prevention and Building Safety Commission. A Class 1 project needs an Indiana Department of Homeland Security Construction Design Release before construction unless 675 IAC 12-6-4 exempts the work, and the county’s process map has the applicant obtain any state documents before the final application.
Short on time to read all of this?
Get a free quote →DeKalb County building department: who handles permitting
Development Services combines the planning department, the building department and the county GIS office, led by Director and Zoning Administrator Chris Gaumer. Who issues the zoning approval and who issues the building permit depends on where the parcel sits, so check it on the county’s Beacon GIS or SmartGov parcel search first.
| Place | Zoning / ILP | Building permit and inspections |
|---|---|---|
| Unincorporated county, Corunna and Spencerville | DeKalb County Development Services | DeKalb County Development Services |
| Ashley, St. Joe, Waterloo | The town (the county has no zoning jurisdiction there) | DeKalb County, after the town’s ILP |
| Butler, Garrett | The city | DeKalb County, except demolition permits |
| Auburn and its extraterritorial area | City of Auburn Building, Planning & Development, 210 South Cedar Street, (260) 925-6449 | City of Auburn; see the Auburn guide |
| Altona | Not the county; ask the town | Not the county; the published sources do not name the issuing office |
| Hamilton and its extraterritorial area | Not the county; ask the town | Steuben County |
DeKalb County permit types
Applications run through the county’s SmartGov public portal, where applicants submit and process applications and search parcels; staff also invite owners to call or email so they can work through a project electronically. The paper ILP application asks for a site plan with setbacks, the zoning class, lot size, foundation type, estimated cost and completion date, and any manufactured home’s make, year and serial number. An incomplete application is not processed; a complete one is processed within 72 hours.
Residential permits
- New homes and additions. Both an ILP (on county-zoned land) and a building permit; garages, decks and porches use the same residential rate.
- Sign-offs. The ILP form has spaces for the Health Department permit number, the county or state highway permit number, Soil and Water approval and Surveyor approval, collected before the final application.
- Sheds and outbuildings. Small sheds may need only an ILP; larger or permanent ones need both permits.
- Solar. A private accessory solar system needs a $50 ILP and a $30 building permit.
- Ponds. A pond needs a $150 ILP, and the Surveyor’s Office issues pond permits.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial and industrial buildings are priced per square foot under both permits, and commercial or industrial development plans go to the Plan Commission. Commercial solar energy systems need a CSES overlay district and a development plan, each with its own application. Utility and railroad equipment buildings that are uninhabited need only a foundation permit, plus an electrical permit if they will have power.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Town ILP. Inside a city or town the county inspects, the municipality’s ILP comes first.
- Health Department. Its permit number goes on the ILP form; call environmental health at (260) 925-2220.
- Driveways. The county Highway Department, 3942 US Highway 6, Waterloo, (260) 925-1864, or INDOT on a state road.
- Drains. The Surveyor’s Office manages county-regulated drains and issues outlet connection and pond permits; the Drainage Board meets the first and third Thursday at 8:30 a.m.
- Zoning relief. The BZA hears development standards variances, special exceptions and use variances; the Plan Commission hears rezonings and overlay districts, with subdivisions through its Plat Committee.
- Floodplain. The planning department administers the floodplain ordinance, and the ILP form asks whether an elevation certificate is required.
DeKalb County permit costs and fees
The building permit schedule was updated July 29, 2024, and an ILP fee may be added to it. Development Services calls both lists simplified, so ask for any fee not shown. Fees can be paid online once staff have told you the amount.
| Work | Fee |
|---|---|
| Residential: dwellings, manufactured homes, garages, additions, decks, porches, accessory buildings | $0.10 per sq ft of floor area; $50 minimum |
| Residential remodel | $0.10 per sq ft affected; $50 minimum |
| In-ground pool; private accessory solar | $75; $30 |
| Commercial buildings and commercial agricultural buildings | $0.15 per sq ft; $100 minimum |
| Industrial buildings | $0.15 per sq ft; $200 minimum |
| Commercial solar energy system | $50 per acre; $5,000 maximum |
| Utilities and railroads | $0.05 per sq ft; $25 minimum |
| Electrical service, temporary service, plumbing system, roofing | $30 each |
| Foundation; demolition | $50; $50 |
| Removal of flammable or combustible storage tanks | $50 per tank |
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Structures or additions of 300 sq ft or less / larger | $30 / $50 |
| Commercial structures | $0.02 per sq ft; $75 minimum, $250 maximum |
| Industrial structures | $0.02 per sq ft; $100 minimum, $500 maximum |
| Fence or retaining wall; private accessory solar | $50; $50 |
| Ponds | $150 |
| Zoning affidavit or conformance letter | $25 |
| All others (signs, pools) | $50 |
Example from the schedules: a 2,000-square-foot house on county-zoned land is 2,000 × $0.10, or $200, for the building permit, plus the $50 ILP for a structure over 300 square feet, for $250 before any other charges. Contractor registration adds $20 a year, and paying it online carries a 2.60% convenience fee.
Trade permits and who may pull them
Under Ordinance 2019-R-19 (County Code 32-3-3), every contractor, subcontractor or person doing construction work in the county, or in a city or town where the county acts as building inspector under an interlocal agreement, must register with the building department before receiving a permit. The ordinance covers masonry, concrete, decks, demolition, electrical, excavation, framing, heating, plumbing, pools, remodeling, repairs, roofing, steel erecting and tower building.
- Registration. $20, valid January 1 to December 31, with proof of liability insurance or a bond of at least $500,000; the 2027 form is emailed to the building department and paid online.
- Plumbers. Plumbing contractors register and show their Indiana plumbing contractor license unless state law exempts them.
- Electrical and plumbing permits. Service changes, temporary service and plumbing system replacements or additions are $30 permits; fixture replacements are excluded.
- Subcontractors. When a general contractor is hired, each subcontractor must also be registered, but does not need a separate permit.
- Homeowners. Section 5 of the ordinance sets what “a contractor and/or homeowner” must provide to receive a permit, starting with proof of registration for any contractor hired.
Rather not deal with the DeKalb County building department?
Get a free quote →How to apply for a DeKalb County building permit
Check the parcel on Beacon or SmartGov; Auburn, its extraterritorial area and Altona are not county permits, and Hamilton goes to Steuben County.
Call (260) 925-1923 or email the planning office; staff review the plans informally and say which documents you need.
Health Department permit, highway or INDOT driveway permit, Soil and Water and Surveyor approvals, and any state design release.
Inside Ashley, Butler, Garrett, St. Joe or Waterloo, the municipality’s ILP comes before the county building permit.
File the final application with the site plan and plans; registered contractors must be listed.
Pay the fee staff give you, online or at the office, then call for inspections as work proceeds.
Review, corrections and what causes delay
A missing site plan stops an ILP outright, and a contractor without a current county registration card cannot be issued a permit. Sign-offs from other offices take the most time: drainage questions go to the Drainage Board, which meets twice a month, and zoning relief waits for the BZA or Plan Commission, whose agendas are posted about a week before each hearing. Once complete, an ILP application is processed within 72 hours. State law since January 1, 2026 also gives local units three business days to confirm a one- or two-family application is complete and seven to finish its plan review.
Inspections and certificates in DeKalb County
To schedule a building inspection anywhere the county is the building inspector, including the towns it serves, call the building division at (260) 925-3021, the number on its Building page, or the main Development Services line, (260) 925-1923. The ILP application warns that every required inspection must be passed before a certificate of occupancy is issued, and the building department issues certificates of occupancy as required. Foundation permits are priced separately for repairs to existing foundations, and new foundations and basements placed under existing structures are charged as new construction.
Indiana building code in DeKalb County
The county building department enforces the state codes in unincorporated DeKalb County and in the cities and towns it serves; Auburn runs its own program. FEMA’s Community Status Book lists unincorporated DeKalb County (community 180044) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2006; the county floodplain ordinance applies on its land, and each city or town has its own entry.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Want this handled start to finish?
Get a free quote →DeKalb County permit search and official resources
Applicants follow their own applications in the SmartGov public portal, which also has a parcel search, and the Beacon GIS map, built with Auburn, Butler and Garrett through the CoCiGIS partnership, holds parcel, tax, utility and other county data; for older permit records, ask Development Services. Plan Commission, Plat Committee and BZA agendas and packets are posted on the department page about a week before each meeting; the Plan Commission meets at 7:00 p.m. at the courthouse.
- Department of Development Services
- Building permit information and fee schedule
- Improvement location permit information and fees
- SmartGov public portal
- Improvement location permit application
- Process map: improvement location and building permit
- Building contractor registration
- Contractor Registration Ordinance 2019-R-19
- DeKalb County Unified Development Ordinance
- Floodplain ordinance
- Demolition of structures ordinance
- 2026 Plan Commission meeting schedule
- 2026 BZA meeting schedule
- Surveyor’s Office
- Drainage Board
- Highway Department
- Health Department
- City of Auburn building permits and fees
- IDHS building plan review and design releases
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →DeKalb County building permit FAQs
Does DeKalb County issue building permits in Auburn?
No. Auburn and its extraterritorial area, and Altona, are outside the county’s building and ILP program; Auburn’s Building, Planning & Development Department issues them there.
How much is a permit for a new house?
$0.10 per square foot of floor area with a $50 minimum, plus the ILP fee where the county zones; a 2,000-square-foot house is $200 plus a $50 ILP.
Do I need a permit for a fence?
No building permit. The ILP page charges $50 and exempts fences 4.5 feet or lower and see-through chain-link or wire fences, but the building permit page says all fences need an ILP, so confirm with the office.
Does a shed need a permit?
A shed under 300 square feet with no permanent foundation, or a pre-built shed under 500 square feet, needs no building permit, though an ILP may still apply.
Do contractors have to register with the county?
Yes. Contractors and subcontractors register each calendar year for $20 with $500,000 of liability insurance or bond before a permit is issued.
Who issues building permits in Hamilton?
Steuben County issues all building permits in Hamilton and its extraterritorial area.
How fast is an ILP processed?
Within 72 hours of a complete application with a site plan.
Simplify DeKalb County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in DeKalb County sooner?
Let Alliance prepare, file, and track your DeKalb County permits while your crew stays on the job.
More Indiana permitting guides
Auburn
Read guide →Allen County
Read guide →Steuben County
Read guide →Delaware County Building Permit Guide
Read guide →Dubois County Building Permit Guide
Read guide →East Chicago Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about DeKalb County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.