In the City of Auburn, the Department of Building, Planning and Development (BPD), led by Administrator Ryan Shambaugh at 210 South Cedar Street, second floor (260-925-6449, Monday to Friday 8 a.m. to 4 p.m.), issues building permits, trade permits and improvement location permits in the city and its extraterritorial district; DeKalb County does not issue permits there. Under the city’s Building Code, Ordinance 2025-24 of November 18, 2025, the property owner or an authorized representative applies for the permit, and Chapter 163, last amended January 20, 2026, prices a new house at 10 cents per square foot of floor area, from $35 to $600. Electricians need a city license and plumbers a city registration.
What requires a building permit in Auburn?
Chapter 151 of the city code, rewritten by Ordinance 2025-24 and passed on November 18, 2025, requires a site improvement permit before work starts on any Class 1 or Class 2 structure and its accessory buildings, on agricultural buildings, and on any work involving a structural change, a permanent foundation or a temporary or permanent connection to City of Auburn electric service. The department’s permit list adds the everyday items.
Permit required
- New buildings, additions and remodels
- Decks, pergolas, porches and gazebos
- Garages, carports, sheds and yard barns over the small-shed limit
- Fences and swimming pools
- Electrical and plumbing work
- Foundation work and demolition
- Permanent and temporary signs
- Sewer and water connections and taps, irrigation meters, and work in the right-of-way
No site improvement permit
- Finish work: painting, flooring, cabinets, roof decking and shingles, siding, gutters, insulation, windows and doors
- Non-load-bearing exterior walls, patios, slabs, stoops, sidewalks, driveways and parking areas
- Installing, replacing or repairing furnaces, HVAC systems, water heaters, softeners, toilets, sinks and showers
- Detached one-story residential sheds on temporary foundations under 120 square feet and under 12 feet tall
The exemptions apply, in the ordinance’s words, to work “not subject to the requirements of a construction design release, or” that “does not involve structural change or changes to electrical or plumbing systems.” Federal and state work on their own land, work in a railroad or public street right-of-way and some manufactured homes in mobile home parks are also exempt, but a City of Auburn electric connection always needs a permit. The fee chapter puts the shed cut-off at 120 square feet or less, a hair wider than Chapter 151.
What Auburn decides and what the state holds
Auburn adopts the Fire Prevention and Building Safety Commission’s rules by reference, including the building, residential, plumbing, electrical, mechanical, energy, swimming pool and fire codes, and sets its own permit list, fees, inspections and trade licensing. Chapter 151 takes effect only after both the council’s adoption and the state commission’s approval. A Class 1 project needs the Indiana Department of Homeland Security’s Construction Design Release unless 675 IAC 12-6-4 exempts it, and Auburn asks for a copy of the release and its application at pre-application review. The Unified Development Ordinance, last updated September 17, 2024, governs zoning in the city and its extraterritorial district.
Short on time to read all of this?
Get a free quote →Auburn building department: who handles permitting
BPD covers planning, zoning, permits and inspections for the city, and the city employs its own building inspector. DeKalb County’s Department of Development Services says plainly that it does not issue improvement location or building permits for Auburn or its extraterritorial area, so county permits do not apply here. Outside that area, the county issues building permits.
| Detail | Information |
|---|---|
| Office | Department of Building, Planning and Development, 210 South Cedar Street, second floor, Auburn, IN 46706 (mail: P.O. Box 506) |
| Phone / fax | 260-925-6449 / 260-920-3342 |
| bpd@ci.auburn.in.us | |
| Hours | Monday to Friday, 8 a.m. to 4 p.m. |
| Administrator | Ryan Shambaugh |
| Area | City limits and the extraterritorial district under the UDO |
| Appeals | Inspection disputes to the Administrator; licensing and registration appeals to the Board of Public Works and Safety |
Auburn permit types
Each permit has its own form on the Building Permits & Fees page, and BPD answers questions by phone or at bpd@ci.auburn.in.us. One application covers one address, though one application can cover a multi-family building where every unit gets the same work from the same contractors.
Residential permits
- General building permit. Lists the contractor and site manager, foundation type, bedrooms, baths and garage size, construction type, stories, basement, and whether trusses or I-joists are used, with a plot plan.
- Improvement location permit. The zoning approval for decks, porches, above-ground pools, stairs, fences and similar work; no separate ILP fee is charged when a building permit is issued.
- Fence, demolition and relocation permits. Separate forms; moving a house, garage or commercial building needs a relocation permit.
- Electrical and plumbing permits. Pulled by a licensed or registered tradesperson, or by the owner-occupant doing the work.
- Water wells and excavation. The permits page lists a water well permit and an excavation permit.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial, industrial and agricultural buildings use the same general building form, which asks for the occupancy class, sprinklers, fire alarm and hood systems. Before applying for a Class 1 building, the owner submits the site plan, the state design release application and release, and the plans sent to the state for a pre-application review; Class 2 and other work needs a site plan, material specifications and construction plans. Fire suppression systems, sign wiring and commercial premise wiring each carry their own fee, and development plans go to the Auburn Plan Commission.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Pre-application plan review. Required before any application; it takes from one day to three weeks depending on the project.
- Zoning. The UDO and the August 2026 zoning map set the district; rezonings and plats go to the Plan Commission, and variances, special exceptions and appeals to the Board of Zoning Appeals.
- Utilities. Auburn Electric is notified when an electrical permit is approved and the site is ready for power; once a plumbing permit is approved, the contractor calls the Auburn Water Department to tap.
- Right-of-way. A utility service or right-of-way encroachment agreement costs $100, including recording.
- Private covenants. The ILP form warns that the city does not check deed restrictions or association approvals.
- 811. Call Indiana 811 at least two full working days before digging.
Auburn permit costs and fees
Fees are set by Chapter 163 of the city code, amended December 20, 2022 and January 20, 2026 (with other fees amended again April 7, 2026), and Chapter 164 for planning and zoning cases. They are paid before the permit issues, are not refundable, and are waived for work by or for any unit of government.
| Work | Fee |
|---|---|
| New house or accessory building over 120 sq ft | $0.10 per sq ft of gross floor area; $35 minimum, $600 maximum |
| Residential remodel or alteration | $0.10 per sq ft altered; $35 minimum, $600 maximum |
| Manufactured home, one- or two-family | $75 |
| Commercial, industrial or agricultural, new or remodel | $0.10 per sq ft; $35 minimum |
| Electrical service, permanent or temporary | $50 |
| Premise wiring, one- or two-family | $25 per unit; $25 per accessory building |
| Premise wiring, commercial | $0.02 per sq ft; $40 minimum, $200 maximum |
| Plumbing | $0.02 per sq ft; residential $30–$100, commercial $40–$200 |
| Fire suppression | $1 per head; $40–$150 |
| Permanent pool; deck, porch or exterior stairs | $75; $25 |
| Reinspection; permit renewal; conditional certificate of occupancy | $40; $30; $30 |
| Improvement location permit: residential / non-residential / fence | $25 / $50 / $25 (no fee with a building permit) |
| Plan Commission: development plan; rezoning; primary plat | $475; $225; $375 + $20 per added lot |
| BZA: development standards variance; use variance or special exception | $225 + $100 each added request; $325 |
Rather talk it over?
Call 1-855-478-4290 →Example from Chapter 163: a new 2,400-square-foot house is 2,400 × $0.10, or $240, for the building permit, plus $50 for a permanent electrical service, $25 for premise wiring and 2,400 × $0.02, or $48, for plumbing, for $363; the ILP has no separate fee when a building permit is issued. A 7,000-square-foot house would hit the $600 building permit cap. The permits page summary leaves out these maximums and also lists a $100 excavation permit and a $35 water well permit; the adopted chapter controls the amounts in the table.
Trade permits and who may pull them
Auburn licenses electricians and registers plumbers, and the general building permit form says electric and plumbing permits must be pulled by a licensed contractor unless the owner is doing the work. Installing or replacing furnaces, HVAC systems and water heaters appears on Chapter 151’s exemption list, under the same design-release and structural, electrical and plumbing wording quoted above.
- Electricians (Chapter 155). Anyone doing electrical work in the city needs a city license for the type of structure. A master electrician may pull permits for Class 1 and Class 2 work and a master residential electrician for Class 2 only; journeymen and apprentices may not pull permits. Licenses are renewed every year: $50 for masters, $25 for journeymen and $15 for apprentices. Testing is done by an outside agency, and working without a license is fined $25 a day.
- Owner-occupants. An owner who lives in the home may do the electrical work on that dwelling unit and get the permit, without a license.
- Plumbers (Chapter 153). Plumbing contractors register with BPD each calendar year for $20, showing their Indiana plumbing contractor license; the registration ends with the calendar year or the state license, whichever is first. An owner-occupant of a building with eight or fewer dwelling units may do the plumbing and pull the permit.
- Appeals. Registration and licensing decisions can be appealed in writing to the Board of Public Works and Safety.
Rather not deal with the building department?
Get a free quote →How to apply for an Auburn building permit
Check the August 2026 zoning map or ask BPD; a free zoning verification letter is available.
Send the site plan, specifications and plans, plus the state release papers on Class 1 work.
BPD returns comments in person, by fax or by mail, or recommends going ahead.
The owner or authorized representative files the general building permit and the trade permits, one per address.
BPD approves or rejects a complete application within 10 days; fees are due before issue.
Give at least 24 hours’ notice for each inspection.
Issued after the final inspection, once all trades are done and address numbers are posted.
Review, corrections and what causes delay
Pre-application review takes from a day to three weeks, and an application rejected after review comes back to the owner with reasons, who must fix and resubmit it. Design changes on a Class 1 building need an addendum or revised state release, which the owner gives BPD before the final inspection. A permit is good for one year and can be renewed once, for $30, when weather, materials or labor shortages delay the job. State law since January 1, 2026 gives local units three business days to confirm a one- or two-family application is complete and seven to finish its plan review.
Inspections and certificates in Auburn
The permit holder calls BPD at 260-925-6449 to book each inspection, at least 24 hours ahead: for a Tuesday 9 a.m. concrete pour, call before 9 a.m. on Monday. Required inspections are included in the permit fee, but work that is not ready, covered or inaccessible when the inspector arrives costs $40 to reinspect. The inspector may also visit unannounced, and cited deficiencies must be fixed within the permit term or 90 days after written notice, whichever is longer. For electrical work, Auburn Electric is told when the site is ready to be energized and BPD then inspects.
A certificate of occupancy is required before using a new building or addition, a relocated building, a permanent pool, or a building structurally repaired after a fire, flood or storm. The Administrator issues it within three working days of the final approval, at no charge. A conditional certificate costs $30 and is issued only when weather, materials or labor shortages hold up completion, the building is habitable, and smoke alarms, fire safety equipment, wiring, water and sewer have passed inspection. Violations of the building code can draw fines of up to $2,500.
Indiana building code in Auburn
Auburn enforces the state rules it adopts by reference in Chapter 151 through its own department and inspector. FEMA’s Community Status Book lists the City of Auburn (community 180046) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2006; the ILP form records whether a site is in the floodway or flood fringe.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Auburn permit search and official resources
To get copies of past permits, inspection results or certificates of occupancy, file BPD’s public records request form with the department or email bpd@ci.auburn.in.us. The department’s 2025 annual report and the zoning map are posted on its page, and the city code chapters are posted as PDFs.
- Building permits, fees and licensing
- Building, Planning & Development department
- Building, permits and inspections FAQs
- Chapter 151, Building Code (Ordinance 2025-24)
- Chapter 163, Building Code Fee Schedule
- Chapter 164, Plan Commission and BZA fees
- Chapter 155, Licensing of Electricians
- Chapter 153, Registration of Plumbers
- General building permit form
- Improvement location permit form
- Unified Development Ordinance
- Auburn zoning map, August 2026
- Helpful tips for builders and residents
- Request an inspection
- BPD public records request form
- Auburn code of ordinances
- DeKalb County Department of Development Services
- IDHS building plan review and design releases
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Auburn building permit FAQs
How much is a building permit for a new house in Auburn?
$0.10 per square foot of gross floor area, at least $35 and at most $600, plus electrical and plumbing permit fees; a 2,400-square-foot house is $240 for the building permit.
Do I need a permit to replace a roof, siding or windows?
No, as long as the work involves no structural change and no electrical or plumbing changes.
Does a shed need a permit?
Not if it is a one-story detached residential shed on a temporary foundation under 120 square feet and under 12 feet tall; larger sheds and yard barns need one.
Can I do my own electrical work?
Yes, in the dwelling unit you own and live in as your main home, with a permit; otherwise a city-licensed master or master residential electrician must pull it.
Does DeKalb County issue permits in Auburn?
No. The county does not issue improvement location or building permits in Auburn or its extraterritorial area.
How much notice do inspections need?
At least 24 hours; the inspections themselves are included in the permit fee, and a reinspection costs $40.
How long is a permit valid?
One year from issue, with one renewal for $30 if the delay was outside the owner’s control.
Simplify Auburn permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Auburn sooner?
Let Alliance prepare, file, and track your Auburn permits while your crew stays on the job.
More Indiana permitting guides
DeKalb County
Read guide →Allen County
Read guide →Steuben County
Read guide →Avon Building Permit Guide
Read guide →Bartholomew County Building Permit Guide
Read guide →Bedford Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Auburn permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.