Inside the City of Bedford, the county seat of Lawrence County, building permits come from the Planning and Zoning Department on the second floor of City Hall, 1102 16th Street (812-275-1631, weekdays 8 a.m. to 4 p.m.). Its staff review site and building plans, issue the permit and inspect the work during and after construction. Residential, commercial, demolition and sign applications are filed through forms on the city website, and a new house costs $50 plus 10 cents per square foot under the city’s posted fee schedule.
What requires a building permit in Bedford?
Bedford’s fee schedule is the clearest list of what the city permits. It prices new houses, residential remodeling, new commercial and public buildings, commercial remodels, foundation-only work, signs, demolition, moving a building and mobile home parks, and it charges a certificate of occupancy separately.
Permit priced by the city
- New residential construction
- Residential remodeling that changes structure, wiring or plumbing
- Other residential remodeling over $500
- New commercial, public, church, temple and fraternal buildings
- Commercial remodels, with or without inspection
- Foundation-only permits, demolition, signs and moving a building
Also handled by the department
- Rezoning, variances, special exceptions and conditional uses
- Subdivision plats and site plans
- Planned residential developments
- Certificates of occupancy
- Building, fire and property code complaints
The schedule’s cheapest residential line covers remodeling over $500 that does not touch structure, wiring or plumbing, so even cosmetic work of that size is on the list. Starting work before the permit is issued doubles the fee. The schedule has no separate lines for decks, fences, sheds or pools, so ask the department how such a project is classed.
What Bedford decides and what the state holds
The city sets its permit fees, zoning and subdivision rules, historic review and property maintenance standards, and its own staff inspect. Buildings used by the public, by employees or by three or more tenants also need a state Construction Design Release before construction, and Bedford’s applications make the applicant certify that the plans match those the state released. One- and two-family homes and other Class 2 work are permitted locally by the same department, using the residential application. Zoning rules change by Plan Commission hearing: in August 2025 the city gave notice of a September 9, 2025 hearing on letting single-family and two-family homes be built by right in the Professional-Residential (PR) districts, with retail stores allowed there by special exception.
Short on time to read all of this?
Get a free quote →Bedford building department: who handles permitting
The Planning and Zoning Department, led by Planning/Zoning Director Kevin Jones, handles every step: site and building plan review, permits, inspections, the city’s GIS mapping, filings for rezoning, variances, special exceptions and plats, and code enforcement for building and fire problems, overgrown lots and debris. It is also the staff for the Plan Commission, the Board of Zoning Appeals and the Historic Review Board.
| Detail | Information |
|---|---|
| Office | Planning / Zoning Department, City Hall 2nd floor, 1102 16th Street, Bedford, IN 47421 |
| Phone | 812-275-1631 (City Hall 812-279-6555, fax 812-275-1608) |
| Hours | Weekdays, 8 a.m. to 4 p.m., except holidays |
| Director | Kevin Jones, Planning/Zoning Director |
| Applications | Online residential, commercial, demolition and sign permit forms on bedford.in.gov |
| Utilities and streets | Utilities Department 812-275-1626; Street Department 812-279-9222 |
The department works inside the city limits only. Lawrence County maintains roads outside Bedford, Mitchell and Oolitic, and the Lawrence County Health Department, 2419 Mitchell Road (812-275-3234), issues septic permits across the county.
Bedford permit types
Each application is a form on the city website that collects the owner, the applicant, the person paying the fee and the general contractor (or “UNKNOWN” if none is chosen), plus the estimated construction cost and start date. Plans and other files are uploaded with the form.
Residential permits
The residential form asks whether the home will be lived in by the owner or rented, whether the job is new or a remodel, the number of bedrooms and units, and whether the house uses public sewer, a septic system or something else. Square footage is reported floor by floor, with the basement, covered decks and porches, concrete patios and any attached or detached garage listed separately; for a remodel, only the work area is counted. The form also asks whether the lot is in a flood plain, has sinkholes or lies in a watershed. Up to three files of 100 MB can be attached.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
The commercial form classifies the building as retail, office, restaurant, industrial, healthcare or another use, records whether it is a rental and how many units it holds, and asks for the number of stories, the total height and the maximum occupancy. It names the electrical and HVAC contractors as well as the general contractor and takes files of up to 500 MB. Commercial plans must match those released by the state, and work started before the city permit is signed and issued is not authorized.
Not sure this scope needs a permit?
Get a free quote →Two shorter forms cover the rest. The demolition application records whether the structure is a house, a garage or a commercial building, what it was last used for, the expected start and finish dates and the cost of the demolition, for a flat $50 fee. Sign applications are priced at $50 per sign. Anyone thinking of opening a business is invited to meet the department before buying or leasing, to confirm the use is allowed at that address, learn about any special approvals and understand the development timeline.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The Bedford zoning layer on the Lawrence County ThinkGIS map shows a parcel’s district. Rezonings, variances, special exceptions and plats are filed through the department and go to the Plan Commission (second Tuesday, 4 p.m.) or the Board of Zoning Appeals (fourth Tuesday, 3 p.m.), both meeting at Bedford Municipal Hall, 1617 K Street.
- Historic review. The Historic Review Board meets at 4 p.m. on the fourth Monday of January, April, July and October.
- Septic. Where a lot is not on sewer, the county health department issues the septic permit after a soil survey by a registered soil scientist; the application costs $75 (cash, money order or cashier’s check), the department has up to 30 days to review the installer’s plan, and the permit lasts one year. The installer or owner must call the health department 48 hours before any part of the system is covered.
- Addresses. The health department sends people needing a new address inside the city to 812-279-4083.
- Floodplain and floodway. The application asks about flood plains. Bedford takes part in the National Flood Insurance Program, and building in a floodway also needs a Construction in a Floodway permit from the Indiana Department of Natural Resources under IC 14-28-1.
Bedford permit costs and fees
The Planning and Zoning fee page sets out the city’s building, improvement and land-use fees. The page names no ordinance number or adoption date, so ask the department to confirm a figure when you file.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Residential new construction | $50 plus $0.10 per sq ft |
| Residential remodel with structural, electrical or plumbing changes | $0.10 per sq ft, $50 minimum |
| Residential remodel over $500 without those changes | $25 |
| Commercial or public building, or church, temple or fraternal building, new | $200 plus $0.10 per sq ft |
| Commercial remodel with inspection / without inspection | $0.05 per sq ft, $100 minimum / $50 |
| Foundation only (commercial section) | $25 |
| Sign | $50 per sign |
| Demolition | $50 |
| Certificate of occupancy | $50 |
| Moving a building | $0.10 per sq ft |
| Mobile home park | $100 plus $5 per space |
| Rezoning / variance / special or conditional use | $200 / $100 / $100 |
| Subdivision plat / site plan | $100 plus $5 per lot / $100 |
| Planned residential development | $250 plus $20 per dwelling |
| Work started without a permit | Permit fee doubled |
Worked example at the page’s rates: a new house of 1,800 square feet costs $50 plus 1,800 × $0.10, or $230, before the $50 certificate of occupancy. A 2,500-square-foot commercial remodel that needs inspection costs 2,500 × $0.05, or $125, since that is above the $100 minimum. The fee page does not say which areas count toward the square footage, so give the floor-by-floor figures the application asks for and let the department calculate the total.
Sewer and water connections are handled by the city Utilities Department (812-275-1626) and are not on this schedule, and the county health department’s $75 septic application is separate.
Trade permits and who may pull them
Bedford’s posted fee page lists no separate electrical, plumbing or mechanical permit fee, and remodeling that changes wiring or plumbing is priced on the residential remodel line. The commercial application identifies the electrical and HVAC contractors by name and phone alongside the general contractor, so the department knows who is doing each trade.
Rather not deal with the building department?
Get a free quote →- Plumbing: plumbing contractors are licensed by the State of Indiana, and septic work outside the sewer system goes through the county health department, which keeps a list of voluntary registered installers.
- Electrical and HVAC: the state has no license for these trades, and Bedford’s pages show no local registration rule; the department at 812-275-1631 can say whether one applies before the permit issues.
- Owners: the residential application can be filed by an owner as applicant; the city does not publish a separate homeowner form.
How to apply for a Bedford building permit
Look up the parcel on the Bedford zoning layer of the county GIS map, or call the department about the use you plan.
File any rezoning, variance or special exception and wait for the Plan Commission or BZA decision.
Get the septic permit and address if the lot is not sewered, and any state design release for a commercial building.
Choose the residential, commercial, demolition or sign application and enter the floor areas, cost and contractors.
Attach the site plan and building plans to the form.
The permit is valid only once the department signs and issues it.
Review, corrections and what causes delay
The department reviews both the site plan and the building plans. Any drawings sent after the application count as an amendment and must carry the city’s endorsement and the approving official’s signature before that work is built. Since January 1, 2026, a unit that permits one- and two-family homes must review a complete application within 7 business days, and an applicant may use a qualified private reviewer instead.
Inspections and certificates in Bedford
City inspectors check buildings during and after construction for compliance with state and local law, and by signing the application the owner agrees to let city officials onto the property to inspect and post notices. Questions about inspections and their timing go to the department at 812-275-1631.
A certificate of occupancy costs $50, and the application asks the owner to keep it with the property records once the job is finished. The schedule also carries a $50 line for a commercial remodel with no inspection. Building code and fire concerns about existing buildings go to the same department through the city’s online code violation form.
Indiana building code in Bedford
Bedford’s building inspector enforces the state codes inside the city. FEMA’s Community Status Book lists the City of Bedford (community 180148) as participating in the National Flood Insurance Program, with current flood maps dated December 3, 2010.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Bedford permit search and official resources
The city does not post an online permit search. For copies of past permits, plans or certificates of occupancy, ask the Planning and Zoning Department at 812-275-1631 or City Hall at 812-279-6555; Indiana’s Access to Public Records Act lets anyone ask for existing city records. City Council meetings are posted as videos on the agendas page.
- Bedford Planning & Zoning Department
- Planning & Zoning fee schedules
- Residential building permit application
- Commercial building permit application
- Demolition permit application
- Sign permit application
- Lawrence County ThinkGIS (Bedford zoning layer)
- Code violation complaint form
- Plan Commission hearing notice, September 9, 2025
- Lawrence County Health Department septic permit steps
- IDNR Division of Water permit programs (Construction in a Floodway)
- FEMA Community Status Book, Indiana
Inspections are where schedules slip.
Get a free quote →Bedford building permit FAQs
How much does a building permit for a new house cost in Bedford?
$50 plus 10 cents per square foot, so an 1,800-square-foot house is $230, plus $50 for the certificate of occupancy.
What happens if I start work without a permit?
The fee page says permit fees are doubled when work starts before a permit is obtained.
Can I apply online?
Yes. The city posts residential, commercial, demolition and sign permit applications as online forms that accept uploaded plans.
Do I need a permit to remodel?
Remodeling that changes structure, wiring or plumbing costs 10 cents per square foot with a $50 minimum; other remodeling over $500 is a $25 permit.
When does the Board of Zoning Appeals meet?
On the fourth Tuesday of the month at 3 p.m. at Bedford Municipal Hall, 1617 K Street; the Plan Commission meets on the second Tuesday at 4 p.m.
Who issues septic permits for a Bedford lot?
The Lawrence County Health Department, after a soil survey by a registered soil scientist, with a $75 application fee.
Does a new shop or office in Bedford need state approval too?
Yes. A building used by the public or by employees needs a state Construction Design Release, and the city application asks you to certify that your plans match the released set.
How do I find my zoning district?
Open the Lawrence County ThinkGIS map, turn on the “Bedford Zoning” layer and search the address.
Simplify Bedford permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bedford sooner?
Let Alliance prepare, file, and track your Bedford permits while your crew stays on the job.
More Indiana permitting guides
Lawrence County
Read guide →Monroe County
Read guide →Jackson County
Read guide →Beech Grove Building Permit Guide
Read guide →Blackford County Building Permit Guide
Read guide →Bloomington Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bedford permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.