Skip to main content

Monroe County, Indiana Building Permit Guide

To get a building permit in Monroe County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Monroe County Building Department in the Showers Building issues building permits and licenses electricians in the county, including Bloomington, after the county or city zoning step for Class 2 homes.

Authority: Monroe County Building DepartmentFiling: OpenGov portalPhone: 812-349-2580
Authority
County Building Dept.501 N Morton St, Suite 220
Class 2 homes
ILP or CZC firstSince January 1, 2026
Electricians
County licensePlumbers register with the county
Counter
9–11 and 1–3Permit pickup and payments

In Monroe County, building permits come from the Monroe County Building Department in the Showers Building North, 501 North Morton Street, Suite 220, Bloomington (812-349-2580), where Robert LaRue is Building Commissioner. The department enforces the state building codes in the unincorporated county and inside the City of Bloomington, and it licenses and registers the electricians and plumbers who work in the county. Since January 1, 2026, work on one- and two-family homes and townhouses must first clear zoning: an improvement location permit (ILP) from the County Planning Department, or a Certificate of Zoning Compliance in Bloomington. Applications are filed online through OpenGov.

What requires a building permit in Monroe County?

The county’s building permit fee pages show what the department permits. The Planning Department’s list of Class 2 work shows what now needs the ILP before the building application can be made.

Building permits

  • New houses, modular and manufactured homes, and relocated buildings
  • Additions, remodeling, alterations and repairs
  • Restoration after partial flood or fire damage and non-structural rehabilitation
  • Covered decks and porches, and decks or balconies more than 30 inches above grade
  • Accessory structures, pools, spas and whirlpools
  • Electrical services, electrical, mechanical, plumbing and structural installations
  • Sewer connections and alterations; demolition
  • Fences over 6 feet, ramps and stairs

Class 2 work that needs an ILP first

  • New single-family homes, duplexes and townhomes up to three stories
  • Additions and remodels where the main use is Class 2
  • Accessory structures and accessory dwelling units
  • Decks, pergolas, swimming pools and fences
  • Detached garages, carports and sheds
  • Demolition on a property whose main use is Class 2

The Planning Department’s free Residential Construction Planning Pre-Design request is the starting point for any ILP and tells the owner every permit the job will need. Commercial work goes to the Building Department directly, with the county’s note on whether a state Construction Design Release must be filed.

What the county decides and what the state holds

Monroe County adopts the state codes through its own building code, Chapter 430 of the County Code, which also covers permit review, fees and inspections; Chapter 433 and Ordinance 96-38 set up electrical contractor licensing and plumbing contractor registration, and Ordinance 95-25 deals with unsafe buildings. Zoning in the unincorporated area follows the Monroe County Development Ordinance, adopted on December 18, 2024 and last amended on October 22, 2026. The Class 2 review deadlines come from state law, House Enrolled Act 1005, now IC 36-7-2.5.

Monroe County building department: who handles permitting

The Building Department describes its job as inspecting and enforcing the adopted Indiana building codes throughout Monroe County. In practice the zoning step depends on location: the County Planning Department for unincorporated land, Bloomington’s Planning and Transportation Department inside the city, and Ellettsville’s own Planning Department inside that town.

Short on time to read all of this?

Get a free quote →
Monroe County permit contacts
OfficeDetails
Building DepartmentShowers Building North, 501 N Morton St, Suite 220, Bloomington, IN 47404; 812-349-2580; fax 812-349-2967; buildinginspector@co.monroe.in.us
Building Department hoursMonday to Friday 8 a.m. to 4 p.m.; licenses and permits picked up and payments taken only 9 to 11 a.m. and 1 to 3 p.m.
Planning Department (ILPs)Showers Building North, Suite 224; 812-349-2560; PlanningOffice@co.monroe.in.us; Monday to Friday 8 a.m. to 4 p.m.; Director Jackie Nester Jelen
Septic permitsMonroe County Health Department, Environmental Health: Wastewater; payments through Vital Records, 812-349-2542
County roadsMonroe County Highway Department permits for any work in county rights-of-way

Which office covers each city and town

Building permits by community
CommunityWho issues what
Unincorporated countyCounty Planning Department ILP for Class 2 work, then the county building permit
BloomingtonCity Certificate of Zoning Compliance for Class 2 work, then the county building permit; commercial work starts at the county
EllettsvilleThe town’s Planning Department, which has its own Building Department division, permit forms and inspectors; Town Hall, 1150 W Guy McCown Dr, 812-876-8008
StinesvilleThe town’s pages carry no building permit information; ask the town office, 7973 W Main St, 812-379-8757

The county’s own pages describe its code enforcement as countywide, while Ellettsville publishes its own building permit applications and inspection process, so call both offices before starting work in Ellettsville.

Monroe County permit types

Every application starts with an OpenGov account. The county posts a short video and a PDF on how to apply online, and the same portal handles licensing applications, electrical and plumbing sign-offs and public records requests.

Residential permits

  • Residential and townhouse permits cover one- and two-family homes, modular and manufactured homes, additions, remodels and accessory buildings, priced by square foot with minimums.
  • Trade-only permits for electrical, mechanical, plumbing and structural installations are $100 each; electric service changes and reconnect authorizations have their own lines.
  • Advanced Structural Components Form is part of the county’s residential form set, filed where the design uses such components.
  • Homeowner Sign-Off Form is needed when an owner installs the electrical or plumbing system.

Commercial permits

Commercial and apartment permits cover new buildings, shells, additions, remodels, hotel and motel units, agricultural buildings, sprinkler systems, commercial range hoods, storage tanks above set gas and liquid volumes, and towers. Partial filings cost $125 per submission. The commercial page asks whether a Construction Design Release must be filed with the state first.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. For Class 2 work, the county ILP or Bloomington’s Certificate of Zoning Compliance must be complete before the building application.
  • Septic. A new septic permit ($250) needs a soil evaluation by an IRSS-registered soil scientist, minimum specifications from Health Department staff and a septic site plan, usually from the installer; permits last two years, renewals cost $100 and repairs $150.
  • Driveways and road work. Any work in a county right-of-way or on a county road needs a Highway Department permit built to the county’s standard drawings, such as MC-603-001 for a residential driveway without sidewalk; working without one can bring a fine. State roads need an INDOT permit.
  • Historic and floodplain review. The Planning Department staffs the Historic Preservation Board and answers floodplain questions.

Monroe County permit costs and fees

The Building Department’s fee pages are headed “Residential Permit Fees (2012)”, “Multi-Family Building Permit Fees (2012)” and “Commercial Building Permit Fees (2012)”. Fees are set under section 430-10 of the County Code; ask the department at 812-349-2580 whether any later change applies before you budget.

Residential building permit fees (posted 2012 schedule)
WorkFee
New house (conventional) / modular placement$0.14 per sq ft, $125 minimum
Manufactured home placement$0.14 per sq ft, $75 minimum
Addition / remodeling$0.14 per sq ft; $75 / $50 minimum
Alteration or repair$50
Restoration after partial flood or fire damage$100
Non-structural complete rehabilitation$0.10 per sq ft, $75 minimum
Covered decks and porches; decks over 30 inches$0.10 per sq ft, $50 minimum
Accessory structure$0.10 per sq ft, $50 minimum
Electric service under 400 amp / over 400 amp and 3 phase$50 / $100
Reconnect authorization$20
Fences over 6 feet, ramps, stairs$50
Pool: above-ground / in-ground$50 / $125
Demolition: house / detached accessory$75 / $50
Relocation$0.14 per sq ft, $125 minimum
Electrical, mechanical, plumbing or structural installation$100 each
Sewer connection or alteration$50
Re-inspection / extension of unexpired permit$50 / $50 per inspection
Permit renewal50% of the original fee
Certificate of occupancy$125

Rather talk it over?

Call 1-855-478-4290 →
Commercial and multi-family fees (posted 2012 schedule)
WorkFee
New construction / shell only$300 plus $0.15 per sq ft
Addition$225 plus $0.15 per sq ft
Remodeling / accessory structure$125 plus $0.15 per sq ft
Hotel or motel; covered decks and balconies$40 per unit plus $0.15 per sq ft
Apartments, townhouses, condominiums$100 per unit plus $0.14 per sq ft
Alteration or repair / agricultural building$100 / $60
Sprinkler system / class one hood / class two hood$125 / $100 / $75
Pool, spa or whirlpool$175 (multi-family $150)
Storage tank / towers$150 per unit / $175 per unit
Solar electric installation / sewer$50 / $50
Demolition$100 per structure
Partial filing$125 per submission

Worked example at the residential page’s rates: a 2,000-square-foot conventional house is 2,000 × $0.14, or $280, above the $125 minimum. The same page also lists a $125 certificate of occupancy. Septic permits and highway permits are paid to the Health Department and Highway Department separately.

Trade permits and who may pull them

Monroe County runs its own licensing and registration program. Chapter 433 of the County Code covers electrical contractor licensing and plumbing contractor registration, and the Licensing and Registration Board examines, registers and licenses electrical contractors. Plumbing contractors also hold the state plumbing contractor license.

Rather not deal with the Monroe County building department?

Get a free quote →
  • Insurance for licensees: public liability and property damage cover naming Monroe County, of at least $500,000 combined, or $500,000 per occurrence for injury and $100,000 for property damage, with the certificate filed with the Building Commissioner as license administrator.
  • Workers’ compensation: required unless the licensee has no employees and notifies the board; the carrier must give 15 days’ notice before cancelling.
  • Board: the Building Commissioner sits with electrical contractors, a professional engineer and a citizen member, and posts its meeting dates for 2025 and 2026.
  • Sign-offs: electrical and plumbing contractors sign onto a permit through the OpenGov sign-off form.

Homeowners

An owner who installs the electrical or plumbing system must file the Homeowner Sign-Off Form before a rough-in inspection can be scheduled. The owner promises not to employ paid contractors, with the work done by the owner, a relative or unpaid volunteers, to call for inspections and attend them, and to tell the department if a licensed contractor is hired. Hiring an unlicensed contractor breaks Ordinance 96-38, and both the contractor and the owner can be penalized.

How to apply for a Monroe County building permit

1. Open an OpenGov account

All county permit, license and septic applications are filed online.

2. Request a pre-design

For Class 2 work in the unincorporated county, the free Residential Construction Planning Pre-Design lists every permit needed.

3. Clear zoning

Get the county ILP, or Bloomington’s Certificate of Zoning Compliance inside the city, before the building application.

4. Get septic and road approvals

Septic permits come from the Health Department; county road and right-of-way permits from the Highway Department.

5. File the building permit

Apply in OpenGov with plans, the Advanced Structural Components Form where needed, and contractor sign-offs.

6. Pay and pick up

Payments and permit pickup at the counter are taken only from 9 to 11 a.m. and 1 to 3 p.m.

Review, corrections and what causes delay

The Building Department will not take a Class 2 building application until the ILP or zoning certificate is complete, so start the zoning step early. A homeowner who skips the sign-off form cannot book the rough-in inspection. On septic lots, the soil evaluation and minimum specifications usually set the pace, and a septic permit is valid for two years from issue.

Inspections and certificates in Monroe County

Inspections are called in to the Building Department at 812-349-2580, and its forms page also links an inspection schedule. Owner-installed electrical or plumbing work needs the Homeowner Sign-Off on file first, and the owner must attend to represent the work. Chapter 430 also has a section on inspection help from township and district fire departments.

The residential schedule charges $50 for a re-inspection and $50 per inspection to extend an unexpired permit, and lists a $125 certificate of occupancy. Unsafe buildings are handled under Ordinance 95-25 and Chapter 432.

Want this handled start to finish?

Get a free quote →

Ellettsville inspections

Inside Ellettsville, inspections are booked with the town at 812-876-8008 using the permit number. The town inspects on Monday, Wednesday and Friday from 8 a.m. to 3:30 p.m. and on Tuesday from noon to 3:30 p.m., with footing, foundation, underslab, rough-in, energy and final inspections for a new house.

Indiana building code in Monroe County

FEMA’s Community Status Book lists unincorporated Monroe County (community 180444) as participating in the National Flood Insurance Program, with the current flood map dated December 17, 2010. Floodplain questions in the unincorporated county go to the Planning Department.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Monroe County building permit FAQs

Does the county issue building permits in Bloomington?

Yes. The county Building Department issues them; for Class 2 work the city’s Certificate of Zoning Compliance must be issued first.

What is the first step for a new house outside the cities?

Request the free Residential Construction Planning Pre-Design from the County Planning Department, then get the ILP before applying at the Building Department.

How much is a building permit for a new house?

The posted residential schedule charges $0.14 a square foot with a $125 minimum; a 2,000-square-foot house is $280.

Can I do my own electrical or plumbing work?

Yes, on your own project, if you file the Homeowner Sign-Off Form before the rough-in inspection and do not pay anyone else to do the work.

Do electricians need a county license?

Yes. The Licensing and Registration Board examines and licenses electrical contractors, and plumbing contractors register with the county.

How much is a septic permit?

$250 for a new system, $150 for a repair and $100 to renew; permits last two years.

When can I pay or pick up a permit?

Weekdays from 9 to 11 a.m. and 1 to 3 p.m. at Suite 220 of the Showers Building North.

Monroe County permit search and official resources

Permit, license and septic records are kept in the county’s OpenGov portal, and the Building Department’s forms page links an Indiana public records request filed through the same portal for older files.

Inspections are where schedules slip.

Get a free quote →

Simplify Monroe County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Monroe County sooner?

Let Alliance prepare, file, and track your Monroe County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Monroe County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.