Lawrence County, in south-central Indiana, has three incorporated places: the City of Bedford, the county seat (13,962 people in the Census Bureau’s 2025 estimate), the City of Mitchell (4,019) and the Town of Oolitic (1,142). The county’s own list of departments has no planning, zoning or building office, so the permits a builder meets on unincorporated land come from the Lawrence County Health Department (septic systems, 812-275-3234) and the state, while Bedford’s Planning and Zoning Department issues building permits inside that city.
What requires a permit in Lawrence County?
The answer depends on where the lot is. Inside Bedford, the city’s Planning and Zoning Department prices and permits new houses, remodels, commercial buildings, signs and demolition. Outside the cities, the county’s published departments are the assessor, auditor, emergency management, extension, health, highway, recorder, soil and water conservation, solid waste, surveyor, treasurer and veterans offices, with no building department among them.
County septic permit needed before
- Starting a new house not served by sewer
- Placing a manufactured, modular or mobile home
- Building or plumbing an outbuilding that will have plumbing
- Replacing or rebuilding a home or plumbed outbuilding
- A remodel that may add bedrooms or raise the daily design flow
- Adding to, altering, replacing or repairing a septic system
- Putting a system in for a house that never had one
State approvals that still apply
- A Construction Design Release before building or altering a Class 1 structure: a shop, office, church, restaurant or building with three or more tenants
- Indiana Department of Health commercial plan review for restaurants, groomers, churches and similar commercial septic projects
- An IDNR Construction in a Floodway permit for building in a floodway
What the county decides and what the state holds
Under IC 36-7-8-3, a county building ordinance for unincorporated land takes effect only after the state commission approves it, and it does not apply to private homes built by individuals for their own occupancy. The county pages show no such ordinance or county building permit for houses; the Board of Commissioners’ office at the Courthouse (812-275-3111) is the place to confirm that for a particular project. The health department applies the state’s residential onsite sewage rule, 410 IAC 6-8.3, and the state holds the Class 1 design release and its fees.
Lawrence County building department: who handles permitting
Permits in Lawrence County are split among the city, the county health department and state agencies. Use the county’s ThinkGIS parcel map to see whether an address is inside Bedford, Mitchell or Oolitic before choosing an office.
Short on time to read all of this?
Get a free quote →| Area | Building permits | Contact |
|---|---|---|
| City of Bedford | Bedford Planning & Zoning Department: plan review, permits and inspections (see the Bedford guide) | City Hall 2nd floor, 1102 16th Street; 812-275-1631 |
| City of Mitchell | The county and state sources do not say; ask Mitchell City Hall | No official city page found |
| Town of Oolitic | The county and state sources do not say; ask the town office | No official town page found |
| Unincorporated county | No county building department is listed; septic permits from the county health department; Class 1 work through the state | Health Department, 2419 Mitchell Road; 812-275-3234 |
The Lawrence County Health Department’s office at 2419 Mitchell Road, Bedford, is open Monday to Friday from 8:30 a.m. to 4:30 p.m., closes from noon to 1 p.m., and issues no documents after 3:30 p.m. Most of its permits and forms can be handled by mail; it takes no credit or debit cards and no personal checks. County offices at the Courthouse, 916 15th Street, keep 8 a.m. to 4 p.m. hours on weekdays.
Permit types in Lawrence County
With no county building department, the county permits a builder will meet are environmental ones, plus the city’s permits inside Bedford.
Residential permits
- Septic construction permit: signed by the health officer under 410 IAC 6-8.3, needed for any house, mobile home or plumbed outbuilding that will not be on sewer, and for repairs or changes to an existing system.
- Optional system recommendations: for $25 the health department reviews the file and states the minimum system that may be placed on the lot, ready in about five business days; it is a planning aid, not the permit.
- Bedford building permits: new houses, remodels and demolition in the city are applied for through Bedford’s online forms.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings are Class 1 structures, so the state Construction Design Release comes first wherever the site is. A commercial septic system serving a restaurant, dog groomer, church or similar use goes to the Indiana Department of Health’s Commercial Plan Review section, starting with the state pre-application form the county posts. Plans for Class 1 work of more than 30,000 cubic feet must be prepared by a registered architect or engineer. The county also reviews plans for new or remodeled retail food establishments, and public or semi-public pools need a county pool permit.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building work
- Address. The septic application needs an assigned address: call 812-279-4083 inside Bedford or 812-277-9680 for everywhere else.
- Soil survey. An Indiana registered soil scientist must survey the site before a septic application is filed; the health department keeps the list.
- Roads. The County Highway Department, 1 County Complex Road (812-275-2644), maintains about 675 miles of road and some 3,500 culverts and small structures outside Bedford, Mitchell and Oolitic, plus 128 bridges, some of them inside Bedford and Mitchell. Requests to adopt or vacate a county road go to the Commissioners, whose 2026 agendas included one of each.
- Drainage. The County Surveyor reports that Lawrence County has no drainage board and maintains no legal drains, so there is no county regulated-drain approval. The Surveyor’s office (Courthouse Room 13, 812-279-2159) keeps section corner records and, since January 2022, all parcel mapping and chain of title in the county GIS; older plat book images are in its online records archive.
- Soil and water. The Lawrence County Soil and Water Conservation District, set up in 1957, gives landowners technical help with conserving soil and water.
- Floodplain. FEMA lists unincorporated Lawrence County as a participating community; building in a floodway needs an IDNR permit under IC 14-28-1. IDNR’s Division of Water answers questions at 317-232-4160 and runs a Waterways Inquiry Request form that tells a landowner which permit a project needs.
Permit costs and fees in Lawrence County
The county fees a builder is most likely to pay are the health department’s septic charges. Building permit fees exist only where a city sets them, and the state charges its own fee for Class 1 design releases.
| Item | Fee |
|---|---|
| Residential septic permit application (county health department) | $75, cash, money order or cashier’s check |
| Optional septic system recommendations | $25, about five business days |
| Bedford: new house | $50 plus $0.10 per sq ft (city fee page) |
| Bedford: certificate of occupancy | $50 |
| Bedford: work started without a permit | Permit fee doubled |
| State Construction Design Release (Class 1 only) | $75 filing fee plus a processing fee of at least $75, generally $0.050 per gross sq ft |
Rather talk it over?
Call 1-855-478-4290 →The septic fee is due with the application, together with the soil survey, a floor plan on no larger than letter-size paper showing every livable floor with each room’s use, rough dimensions, doors, windows, closets and stairs, plus any plumbed garage or workshop (it need not be to scale), the recorded deed (from the Recorder, 812-275-3245) and a copy of a current driver’s license or state ID. When the owner is a trust or an LLC, the document linking it to the applicant is also needed.
Example: a 2,000-square-foot new house in Bedford pays the city $50 plus $200, or $250, before the certificate of occupancy; the same house on an unsewered lot outside the cities pays the county $75 for the septic application, and the county pages list no building permit fee.
Trade permits and who may pull them
Indiana licenses plumbing contractors and journeyman plumbers; it has no license for general, electrical or HVAC contractors, and the Lawrence County pages show no county registration for any trade. Septic installers are a separate group: the health department keeps a list of voluntary registered installers showing their bonding, insurance and the system types they are trained to install, and the installer submits the system drawing and materials list for review.
Inside Bedford, the city’s commercial application names the electrical and HVAC contractors along with the general contractor, and remodeling that changes wiring or plumbing is priced on the city’s remodel line. Owners may file the septic application themselves or through an agent, and the floor plan may be drawn by the owner. The permit is issued to the owner or the designated representative, who signs for it and collects it at the health department, and a copy must stay on the site while the installer works.
Rather not deal with the Lawrence County building department?
Get a free quote →How to get permits in Lawrence County
Search the county ThinkGIS map by owner name, address or tax ID to see whether the lot is in Bedford, Mitchell, Oolitic or unincorporated land.
A house is Class 2; a shop, office, church or building with three or more tenants is Class 1 and needs the state design release.
Call the addressing number for the area and hire a registered soil scientist if the lot will use septic.
Apply in person at 2419 Mitchell Road on Monday to Wednesday or every other Thursday, 9 a.m. to 3 p.m., or by mail.
The health department reviews it and calls when the permit is ready to sign and collect.
Use Bedford’s online residential or commercial form.
Review, corrections and what causes delay
The health department has up to 30 calendar days to review a complete septic file, and any request for plan changes restarts that 30-day clock. Applications that arrive on a day outside the posted intake days wait until the following Monday. A septic file is complete only with the soil survey, the assigned address, the floor plan, the recorded deed, an ID copy and the fee. On Class 1 work, the state must answer a complete design release application within 10 business days and finish any plan review within 20.
Inspections in Lawrence County
On a septic job, the owner or installer must notify the health department 48 hours (two working days) before any buried part of the system is covered. The issued permit has to be on site during installation, and staff sign it at the final inspection. Septic permits are valid for one year from issue.
Inside Bedford, city staff inspect buildings during and after construction and issue the certificate of occupancy. On a Class 1 building anywhere in the county, the design release must be posted on site and a full set of the released plans kept there until the building is occupied. The health department also investigates written complaints about failed septic systems and, outside city limits, about housing conditions.
Indiana building code in Lawrence County
FEMA’s Community Status Book lists unincorporated Lawrence County (community 180441) and the City of Bedford (180148) as participating in the National Flood Insurance Program, both with flood maps effective December 3, 2010. The county row covers unincorporated land only.
Want this handled start to finish?
Get a free quote →Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Lawrence County permit search and official resources
For septic records, complaint files or inspection reports on a property, file the health department’s Request for Release of Information form. Parcel maps, owners and section corners are on the county’s ThinkGIS site, which needs a free public account for full details. Bedford building permit records are held by the city’s Planning and Zoning Department.
- Lawrence County departments
- Environmental Health: septic and other permits
- Steps in obtaining a septic permit (residential)
- Septic permit application
- Request for release of environmental information
- County Highway Department
- County Surveyor
- Lawrence County ThinkGIS parcel map
- Commissioners and Council agendas
- Bedford Planning & Zoning Department
- IDNR Division of Water permit programs (Construction in a Floodway)
- FEMA Community Status Book, Indiana
Lawrence County building permit FAQs
Inspections are where schedules slip.
Get a free quote →Does Lawrence County issue building permits?
The county lists no building, planning or zoning department. Bedford issues its own building permits, and the county health department issues septic permits countywide.
How much is a septic permit in Lawrence County?
The residential application fee is $75, paid in cash, by money order or by cashier’s check; optional system recommendations cost $25.
How long does septic plan review take?
Up to 30 calendar days from a complete file, and the clock restarts if the plan has to be changed.
Who issues building permits in Bedford?
The city’s Planning and Zoning Department on the second floor of City Hall, 1102 16th Street, 812-275-1631.
Is there a county drainage board?
No. The County Surveyor states that Lawrence County has no drainage board and maintains no legal drains.
Who maintains the road in front of my lot?
The County Highway Department (812-275-2644) maintains county roads outside Bedford, Mitchell and Oolitic; streets inside those places are not county roads.
Do I need a permit to put a mobile home on rural land?
If it will use a septic system, yes: the county health department’s septic permit must be issued before a manufactured, modular or mobile home is placed.
Does a shop or church outside the cities need any approval?
Yes. Class 1 buildings need a state Construction Design Release before construction, and a commercial septic system goes through the Indiana Department of Health.
Simplify Lawrence County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lawrence County sooner?
Let Alliance prepare, file, and track your Lawrence County permits while your crew stays on the job.
More Indiana permitting guides
Bedford
Read guide →Monroe County
Read guide →Jackson County
Read guide →Lebanon Building Permit Guide
Read guide →Logansport Building Permit Guide
Read guide →Lowell Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Lawrence County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.