Skip to main content
Municipal GuideIndianaLogansport · Cass County

Logansport, Indiana Building Permit Guide

To get a building permit in Logansport, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Logansport’s Building Commissioner issues building, electrical and change-of-use permits for property inside the city, and every application now goes through the shared Cass County OpenGov portal.

Authority: Logansport Building CommissionerFiling: OpenGov portal onlyPhone: (574) 753-4381
Authority
Building CommissionerCity Building, 601 E Broadway, 3rd floor
New house fee
$100 + 7¢/sq ftOrdinance 2016-24, plus $10 ILP
Contractors
City registrationElectricians need a city license
Hours
Mon–Fri 8–4(574) 753-4381

Inside Logansport city limits, building permits come from the Building Commissioner (Rob Rennewanz) at the City Building, 601 East Broadway, phone (574) 753-4381. Applications, contractor registrations and electrician test requests are filed only on the OpenGov portal the city shares with Cass County, and only the deeded owner or a registered contractor or electrician may apply. Fees follow Ordinance 2016-24, adopted September 12, 2016: a new house is $100 plus 7 cents a square foot, with a separate $10 improvement location permit.

What requires a building permit in Logansport?

The Building Commissioner’s page sets a wide rule: a permit is needed for new construction, demolition, any new structure placed on a lot, fences, and alterations to the inside or outside of a building. Electrical work always needs its own permit, separate from the building permit. Changing how a property is used, such as adding or removing dwelling units, opening a new business in a building or turning a commercial property into a home, needs a change of use permit. Even a garage sale inside city limits needs a permit.

Permit needed

  • New houses, commercial buildings and additions
  • Sheds, garages and any other new structure on the lot (an “ILP” building permit, usually approved in 48 hours)
  • Fences inside the city, with height, dimensions and location shown (48-hour approval)
  • Interior or exterior alterations, remodels and re-roofing
  • Demolition
  • All electrical work, on a separate electrical permit
  • Changes of use and new businesses
  • Sidewalks, driveways and curb cuts

No improvement location permit

  • Soft-sided above-ground pools, hot tubs and spas
  • Storage of recreational vehicles and trucks
  • Utility installation, road construction and drain tile work
  • Fences in the fringe area outside city limits
  • Normal yard and garden work

The second list comes from the improvement location permit (ILP) exceptions in the Logansport & Fringe Zoning Ordinance. It covers the zoning permit only; work on the list can still need an electrical or building permit, so ask the office before relying on it.

What Logansport decides and what the state holds

The city sets its own permit list, fee schedule, contractor registration and electrician license, and its Plan Commission and Board of Zoning Appeals apply the Logansport & Fringe Zoning Ordinance (Ordinance 2018-03). That ordinance covers the city and an area of extended jurisdiction, the “fringe”, set on April 9, 2001 and recorded with the county. Indiana keeps the building codes themselves and the design release for Class 1 buildings. The zoning ordinance adds its own step for commercial and industrial uses: the ILP application must include a design release signed by an Indiana registered professional engineer stating that the use should meet the ordinance’s performance standards, and the permit issues once 10 days pass without a request for more information or a written objection.

Short on time to read all of this?

Get a free quote →

Logansport building department: who handles permitting

Two offices share the work. The Building Commissioner’s office reviews construction, issues building and electrical permits, registers contractors, licenses electricians and schedules inspections. Zoning questions, setbacks, floodplain status, rezoning, variances and subdivisions belong to the Planning and Zoning Department, which the developer guidebook calls the Logansport/Cass County Planning Department and describes as serving Logansport, unincorporated Cass County and the Town of Walton. Its Planning Executive Director is Arin Shaver, AICP.

Logansport permit contacts
DetailInformation
Building CommissionerRob Rennewanz; City Building, 601 East Broadway, Suite 303 (3rd floor), Logansport, IN 46947
Main phone and hours(574) 753-4381; Monday to Friday, 8:00 a.m. to 4:00 p.m.
Permit, inspection and portal questions(574) 725-2810
Planning and Zoning200 Court Park, Room 306; (574) 753-7775; fax (574) 753-7401; Monday to Friday, 8:00 a.m. to 4:00 p.m.
Online filingCass County OpenGov portal (countyofcassin.portal.opengov.com); paper applications are not accepted
Septic and drivewaysCass County Health Department, (574) 753-7760; Street Department for a driveway cut, (574) 753-4610

Because the portal is shared, check that the address you enter is inside city limits; parcels in unincorporated Cass County are handled by the county’s own Building Commissioner and Zoning Administrator under a different fee schedule.

Logansport permit types

If you are not the deeded owner, upload the city’s 2026 Consent of Property Owner form or a purchase agreement signed by all parties. A shed or other accessory building is filed as an “ILP” building permit so staff can check setbacks and lot coverage, and a fence application needs its height, dimensions and location on the lot.

Residential permits

  • New houses and additions are priced by square foot, plus the $10 residential ILP.
  • Remodels, roof alterations and re-roofing are priced by job value.
  • Electrical, mechanical and plumbing upgrades carry a separate fee for each item upgraded.
  • Pools: in-ground pools and permanently installed above-ground pools have flat fees; soft-sided pools need no ILP.
  • Demolition is charged only when it is not part of a new building on the same lot.
  • Rental homes fall under the minimum housing standards in Chapter 14, Article V of the city code. Ordinance 2024-16 added a $150 fine for failing to register a rental unit after notice, for failing to schedule its inspection, and for failing to register a unit under new ownership.

Commercial permits

New commercial, public and industrial buildings and additions pay a base fee plus a square-foot charge and the $50 commercial ILP. Sprinkler systems, storage tanks and Type 1 and Type 2 kitchen hood systems have their own flat fees, and remodels and parking lots are priced by value. A certificate of occupancy and a change of occupancy each have a fee. The guidebook routes commercial, industrial, public and semi-public projects through a Technical Review, in which the developer or contractor collects sign-offs from utilities, the fire department, the health department and other service providers on a routing sheet before the ILP and building permit issue.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Improvement location permit. Under the zoning ordinance, an ILP is needed before you build, move, alter, enlarge or change the use of a structure. The application needs a site plan showing property lines and setbacks. The administrator approves or denies it within 30 calendar days, and an ILP lapses two years after issue if the work is not substantially complete.
  • Overlay review. Work in the Airport Overlay, Gateway Corridor, Riverfront Protection or Downtown Overlay goes to the Plan Commission or airport board for comment, and the Historic Overlay needs a certificate of appropriateness from the Historic Preservation Commission.
  • Variances and rezoning. The Board of Zoning Appeals meets at 5:00 p.m. on the third Monday and the Plan Commission at 4:00 p.m. on the second Monday, both in the City Council Chambers on the third floor of the City Building. File about 21 days before the meeting; the petitioner pays for the legal notice.
  • Septic and driveways. Where a lot is not on sewer, the Cass County Health Department issues the septic permit; a new driveway cut comes from the city Street Department.
  • Floodplain. Ask Planning and Zoning whether the lot is in a mapped flood area before you design.
  • State release. A Class 1 building also needs the state Construction Design Release before construction starts.

Logansport permit costs and fees

Fees are set by Ordinance 2016-24, adopted September 12, 2016, which is still the schedule linked from the Building Commissioner’s page. The Building Commissioner or Zoning Administrator may waive a fee for good cause, for example where the applicant is a governmental institution. The 2016 schedule prints no plan review fee.

Rather talk it over?

Call 1-855-478-4290 →
Logansport permit fees (Ordinance 2016-24)
WorkFee
Single-family dwelling$100 + 7 cents per sq ft
Multi-family dwelling$100 + 7 cents per sq ft for the first unit + $30 for each added unit
Addition to a dwelling; accessory building$50 + 5 cents per sq ft
Garage or carport$50 per car space
Renovation, remodel, roof alteration or re-roofing$50 + $5 per $1,000 of value
Sidewalk, driveway or curb cut$50 + $5 per $1,000 of value
Residential electrical, mechanical or plumbing upgrade$50 + $5 per $1,000 of value, for each item
In-ground pool / permanent above-ground pool$100 / $75
Commercial new construction and additions$300 + 12 cents per sq ft
Commercial remodel or parking lot; commercial trade upgrade$100 + $5 per $1,000 of value
Sprinkler system / storage tanks / hood systems$150 / $200 / $200
Razing$50 residential, $100 commercial; no charge if part of new construction
Improvement location permit$10 residential; $50 commercial or industrial
Certificate of occupancy / change of occupancy$100 / $50
Reinspection$50 residential; $100 commercial or industrial
Work started before a permitDouble the original permit cost
Signs$20 + $1 per sq ft of sign face
BZA: use variance / special exception / standards variance / appeal$215 / $165 / $215 / $50
Rezoning / planned unit development / development plan review$265 / $215 + $10 per unit or lot / $90

Worked example from the schedule: a new 1,800-square-foot house is $100 plus 1,800 × $0.07, or $226, and the separate residential ILP adds $10, for $236 before electrical permits, any certificate of occupancy fee and county septic fees. A $20,000 remodel is $50 plus 20 × $5, or $150. Contractors also pay the city’s registration fee, and the county health department charges $150 for a new septic system for new construction.

Trade permits and who may pull them

Only the deeded owner or a registered contractor or electrician can open a permit. The FAQ adds that anyone working on a property they do not own and live in must be a Registered Contractor with the city.

Rather not deal with the building department?

Get a free quote →
  • Contractor registration. Register on the portal with a certificate of liability insurance of at least $500,000 naming the City of Logansport, 601 E Broadway Ste. 303, as certificate holder, plus workers’ compensation if you have employees. The page says registration runs until your liability insurance expires; the FAQ on the same page gives a $35 yearly fee with registration running January 1 to December 31. Ask the office which term applies when you register.
  • Electricians. Anyone doing electrical work in the city needs a Logansport electrical license. Applicants file an Application to Test on the portal, take the exam in the Building Department office, show at least 5 years’ experience, post a $5,000 surety bond naming the city as obligee and carry $500,000 in liability cover. The license runs to the expiry date of that insurance.
  • Plumbing. Plumbing contractors hold a state license from the Indiana Plumbing Commission; plumbing and mechanical upgrades are priced per item on the city schedule.

How to apply for a Logansport building permit

1. Confirm the address is in the city

Check zoning, setbacks, overlays and floodplain status with Planning and Zoning at (574) 753-7775.

2. Book a pre-application meeting

The guidebook strongly recommends one for anything beyond a simple home project, so staff can name the right application and review body.

3. Clear zoning first

File any variance, rezoning or certificate of appropriateness about 21 days before the board meeting, then the ILP with a site plan.

4. Open the portal application

Create an OpenGov account, choose the permit type and upload plans, the site plan and, if you are not the owner, the consent form.

5. Add outside approvals

Attach the county septic permit or the city driveway cut if your job needs one, and the state design release for Class 1 work.

6. Pay and wait for issue

Pay the fee shown on the portal; sheds and fences are usually approved in about 48 hours.

Review, corrections and what causes delay

Planning staff email most proposals, including residential ones, to the Technical Review Committee and then decide whether a full technical review meeting is needed, so commercial work should expect routing sign-offs from utilities and the fire department. Applications filed by someone other than the owner without the consent form, contractors without a current registration, and electrical work tucked into a building permit are common reasons a record stalls. The zoning administrator has 30 calendar days to act on an ILP.

Inspections and certificates in Logansport

Inspection requests, portal questions and registration questions go to the Building Department line, (574) 725-2810. The zoning ordinance requires a certificate of occupancy before anyone occupies land or a building that received an ILP, and the fee schedule prices it at $100. A failed inspection that has to be repeated costs $50 for residential work and $100 for commercial or industrial work.

Rental units are inspected separately under the minimum housing chapter by the department’s rental inspector.

Indiana building code in Logansport

FEMA’s Community Status Book lists the City of Logansport (community 180023) as participating in the National Flood Insurance Program, with flood maps effective September 3, 2014. The zoning ordinance carries the city’s floodplain rules, and Planning and Zoning answers floodplain questions.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Logansport permit search and official resources

Permits, registrations and inspection requests are all filed in the shared OpenGov portal. To ask about an existing permit or inspection, call the Building Department line, (574) 725-2810. For zoning, floodplain status or a property’s development history, Planning and Zoning staff help owners and appraisers research the file at (574) 753-7775. City ordinances, including fee and rental ordinances, are posted on the city’s ordinances page.

Inspections are where schedules slip.

Get a free quote →

Logansport building permit FAQs

Do I need a permit for a fence in Logansport?

Yes, inside city limits. Give the height, dimensions and location; approval usually takes about 48 hours. Fences may not exceed 8 feet, or 6 feet next to a residential lot, and are limited to 48 inches in a residential front setback.

Do I need a permit for a shed?

Yes. A shed needs an “ILP” building permit so staff can check setbacks and lot coverage; it is usually approved in about 48 hours.

How much is a building permit for a new house?

$100 plus 7 cents a square foot under Ordinance 2016-24, plus the $10 residential ILP; an 1,800-square-foot house works out to $236.

Can I get a paper application?

No. The Building Commissioner’s page says paper applications are no longer accepted; every permit is filed on the OpenGov portal.

Can a homeowner pull a permit?

The deeded owner can apply for work on their own property. A tenant or buyer needs the consent form or a signed purchase agreement, and anyone working on property they do not own and live in must be a registered contractor.

Does an electrician need a city license?

Yes. Electricians pass the city exam, show 5 years’ experience, post a $5,000 bond and carry $500,000 in liability cover.

What if I start work before getting a permit?

The fee schedule doubles the original permit cost for work done after the fact.

Simplify Logansport permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Logansport sooner?

Let Alliance prepare, file, and track your Logansport permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Logansport permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.