Cass County, Indiana Building Permit Guide

To get a building permit in Cass County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Cass County Planning Department, which houses the county Building Commissioner and Zoning Administrator, issues improvement location and building permits for unincorporated Cass County through an OpenGov portal.

Authority: Cass County Planning DepartmentFiling: OpenGov portalPhone: (574) 753-7775
Authority
County Planning Department200 Court Park, Room 306, Logansport
New house fee
$100 + 7¢/sq ftPlus $10 ILP (schedule of 11/1/20)
Fences
No permitUnincorporated county only
Septic
Health Department$150 for new construction

In unincorporated Cass County, the Cass County Planning Department at 200 Court Park, Room 306, Logansport (574-753-7775) issues the improvement location permit and the building permit; its staff include the county Building Commissioner, Ralph Koppe, and the department is led by Executive Director Arin Shaver, AICP. Applications go through the OpenGov portal the county shares with Logansport. On the county fee schedule dated November 1, 2020, a new house costs $100 plus 7 cents a square foot, plus a $10 improvement location permit.

What requires a building permit in Cass County?

The Cass County Zoning Ordinance, in effect since October 3, 1986 and posted in a 2024 edition, requires an improvement location permit (ILP) before anyone occupies or uses land, builds, rebuilds, moves, alters or enlarges a structure, changes the use of a structure or land, or changes a non-conforming use. Once the Zoning Administrator approves the ILP, the ordinance says the applicant may go on to secure other permits, such as the building permit. The fee schedule then lists what the Building Commissioner charges for.

Permit needed

  • New houses, multi-family buildings and additions
  • Accessory buildings, garages and carports
  • Accessory structures on skids, and moving one to a new site
  • Structural remodels and finishing unfinished space
  • In-ground pools and permanently installed above-ground pools
  • Razing a structure
  • Commercial, institutional and confined feeding buildings
  • Signs, temporary uses and changes of occupancy

No ILP needed

  • Fences, which the ordinance says need no permit at all
  • Soft-sided above-ground pools, hot tubs and spas
  • Walks, driveways, patios, retaining walls, gazebos and similar yard improvements
  • Installing utilities, drain tile and ditch cleaning
  • Normal farming, gardening and timber work
  • Storing recreational vehicles and trucks

Fences still have rules: they must sit entirely on the owner’s lot, and in residential districts or next to homes they are limited to 48 inches in the front yard setback unless set back no farther forward than the house.

What the county decides and what the state holds

The county sets its own fee schedule, zoning districts and ILP rules, and its Zoning Administrator checks every ILP against the National Flood Insurance Program rules. The state keeps the building codes and the design release for Class 1 buildings. The zoning ordinance adds a local step: an ILP for a commercial or industrial use must come with a design release signed by an Indiana registered professional engineer stating the use should meet the ordinance’s performance standards, and the permit issues after a 10-day period with no request for more information and no written objection. Building without the permits is a Class C infraction under the ordinance, with fines of $100 to $300 per violation, each day counted separately, and the county will not accept new applications from anyone it has notified of a violation except to fix it.

Short on time to read all of this?

Get a free quote →

Cass County building department: who handles permitting

The zoning ordinance applies to all unincorporated land, except land under the jurisdiction of a city or town plan commission. The Planning Department handles the unincorporated county and also staffs the Walton Plan Commission and Board of Zoning Appeals, administering Walton’s own zoning ordinance and fee schedule. The developer guidebook describes one planning office serving Logansport, Cass County and Walton, and the same OpenGov portal carries county and city applications, so choose the right jurisdiction when you file.

Cass County permit contacts
DetailInformation
Planning DepartmentCass County Government Building, 200 Court Park, Room 306, Logansport, IN 46947
Phone and hours(574) 753-7775; fax (574) 753-7401; Monday to Friday, 8:00 a.m. to 4:00 p.m.
StaffExecutive Director and Subdivision Administrator Arin Shaver, AICP; Building Commissioner Ralph Koppe; a Zoning Administrator
Online filingOpenGov portal: ILP, building and demolition permits, contractor registration, variances, special exceptions, subdivisions
PaymentCash, check or credit card
Drainage Board / Surveyor200 Court Park, Room 306; (574) 753-7843
Cities and towns in Cass County
PlaceWho handles permits
Logansport (city)The city’s own Building Commissioner, City Building, 601 East Broadway, (574) 753-4381; see our Logansport guide
Walton (town)Zoning under the Walton ordinance, administered by the county Planning Department with Walton’s own Plan Commission and BZA
Galveston (town)The published sources do not say; ask the town hall, 306 S. California St., (574) 699-6664
Royal Center (town)The published sources do not say; ask the town hall, 104 E North Street, (574) 643-3771
Onward (town)The published sources do not say; ask the Planning Department

To find out which office serves an address, look the parcel up on the county GIS map or ask Planning staff, who help owners, appraisers and others research zoning status, floodplain status and a property’s development history.

Cass County permit types

The Planning Department lists these applications on OpenGov: improvement location permit, demolition permit, contractor registration, use variance, special exception, variance from developmental standards, subdivision and planned unit development. A rezoning uses a separate paper form posted on the department page.

Not sure this scope needs a permit?

Get a free quote →

Residential permits

  • New houses and additions are priced by square foot, with a $10 ILP on top.
  • Accessory buildings are priced by square foot; garages and carports by car space.
  • Skid-mounted sheds pay a flat fee, and moving one between sites has its own smaller fee.
  • Remodels that change structure or finish unfinished space pay a flat fee.
  • Pools: in-ground and permanently installed above-ground pools need permits; soft-sided pools do not.
  • Home occupations are permitted at three levels: simple, major and cottage industry.

Commercial permits

Commercial, public, semi-public and industrial buildings, additions and accessory buildings pay a base fee plus 12 cents a square foot and a $50 ILP; institutions pay a lower rate, and confined feeding operations have their own rate. Renewable energy projects carry a $20,000 application fee, half of it credited to the building permit, plus per-megawatt and per-instrument charges. The guidebook sends commercial, industrial, public and semi-public projects through a technical review in which the applicant collects sign-offs from utilities, the highway department, the fire district, the health department, the soil and water district and the surveyor.

What comes before the building permit

  • Improvement location permit. The Zoning Administrator approves or disapproves it within 30 days, and it expires one year after issue if the work is not substantially complete.
  • Septic. Where there is no sewer, the Cass County Health Department issues the onsite system permit under County Ordinance 2009-03.
  • Drainage. The Drainage Board and Surveyor review drainage for development; large projects such as wind farms sign a drainage agreement before any building permit.
  • Road access. The county Highway Department sits on the technical review committee; INDOT controls state highways.
  • Floodway. The ordinance requires an Indiana Department of Natural Resources permit for construction in a floodway before the county issues a building permit, including for filling, grading, clearing and paving done ahead of construction.
  • Hearings. The county Plan Commission meets at 8:30 a.m. on the first Tuesday and the BZA at 6:00 p.m. on the fourth Monday, both in the Commissioners’ Hearing Room at the courthouse; applications are due 21 days before.
  • State release. A Class 1 building needs the state Construction Design Release before construction starts.

Cass County permit costs and fees

The county schedule posted by the Planning Department is dated November 1, 2020. The Building Commissioner or Zoning Administrator may waive a fee for good cause, for example for a governmental institution.

Rather talk it over?

Call 1-855-478-4290 →
Cass County fees (schedule dated 11/1/20)
WorkFee
Single-family dwelling$100 + 7 cents per sq ft + $10 ILP
Multi-family dwelling$100 + 7 cents per sq ft first unit + $30 per added unit + $10 ILP
Addition; accessory building$50 + 5 cents per sq ft + $10 ILP
Accessory structure on skids$20 + $10 ILP; moving one to another site $10
Garage or carport$50 per car space + $10 ILP
Structural remodel; unfinished to finished space$50
In-ground pool / permanent above-ground pool$100 / $75, each + $10 ILP
Razing$50 residential, $100 commercial; no charge with new construction
Commercial new construction, additions, accessory$300 + 12 cents per sq ft + $50 ILP
Institutional buildings$100 + 7 cents per sq ft + $50 ILP
Confined feeding operation$30 + 3 cents per sq ft + $50 ILP
Reinspection / requested inspection$50 residential, $100 commercial / $35
Work started without a permitDouble the original permit cost
Home occupation$25 simple; $50 major; $75 cottage industry
BZA: use variance / special exception / standards variance / appeal$215 / $165 / $215 / $50
Rezoning / PUD / development plan review$265 / $215 + $10 per unit or lot / $90
SubdivisionMinor $115; major $165 + $15 per lot
Renewable energy application$20,000, half applied to the building permit

Worked example: a 2,000-square-foot house in the unincorporated county is $100 plus 2,000 × $0.07, or $240, plus the $10 ILP, for $250. A new septic system for that house adds the Health Department’s $150 new-construction fee. Walton has a separate, lower schedule: $75 plus 7 cents a square foot for a house.

⚠️ Pending fee change. Plan Commission Resolution 26-06, heard on June 2, 2026, recommends adding commercial and industrial remodeling, roof alterations and reroofing to the fee schedule. It was certified to the Board of Commissioners; the posted copy does not show the recommendation marked, and no adopted amounts or newer schedule are posted.

Rather not deal with the Cass County building department?

Get a free quote →

Trade permits and who may pull them

The county lists contractor registration as an OpenGov application next to its building permits. The county schedule prices building work but lists no separate electrical, plumbing or mechanical permit fees. Plumbing contractors hold a state license from the Indiana Plumbing Commission. Inside Logansport, the city registers contractors and licenses electricians under its own rules.

Septic installation is a Health Department matter: the 2025 application must be signed by the owner or an authorized representative, asks about bedrooms, wells, water softeners and fixtures, and is pending until every required paper is in. The fee is $150 for new construction, $100 for a residential replacement, $50 for a residential repair and $250 for new commercial work, and the department has 45 days to issue or deny the permit.

How to apply for a Cass County building permit

1. Check the jurisdiction

Find the parcel on the county GIS map and confirm it is outside Logansport and outside any town with its own plan commission.

2. Ask for a pre-application meeting

The guidebook strongly recommends one with planning staff to pick the right application and review body.

3. Get outside approvals

Start the septic permit with the Health Department and talk to the Highway Department and Surveyor about access and drainage.

4. File on OpenGov

Submit the ILP and building permit with a site plan and plans; commercial work adds the engineer’s design release and the state release.

5. Pay the fee

Pay by cash, check or credit card under the 2020 schedule.

6. Build and book inspections

Begin only after the permit issues, and finish within the ILP’s one-year life.

Review, corrections and what causes delay

The ordinance gives the Zoning Administrator 30 days to approve or disapprove an ILP and requires written reasons for a refusal. Hearings add time: plan commission and BZA petitions are due 21 days before the meeting, legal notice runs at least 10 days before it, and mailed notices go to interested parties 12 days ahead at the petitioner’s cost. A septic permit can take up to 45 days.

Inspections and certificates in Cass County

The county schedule charges $35 for a requested inspection and $50 (residential) or $100 (commercial) for a reinspection, so plan work to pass the first time. Before anyone occupies land or a building that received an ILP, the zoning ordinance requires a certificate of occupancy confirming the work matches the permit. Inspection questions go to the Building Commissioner in the Planning Department, (574) 753-7775; septic systems are a Health Department matter.

Want this handled start to finish?

Get a free quote →

Indiana building code in Cass County

FEMA’s Community Status Book lists Cass County (community 180022) as participating in the National Flood Insurance Program for its unincorporated area, with flood maps effective September 3, 2014; Logansport participates separately.

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

Cass County permit search and official resources

Under the zoning ordinance, the Zoning Administrator keeps a permanent file of all permits and applications as public records. To get copies, send the county’s Public Records Request Form by email to the public information officer or deliver it in person at the County Auditor’s office. Planning staff can also tell you a parcel’s zoning, floodplain status and permit history.

Inspections are where schedules slip.

Get a free quote →

Cass County building permit FAQs

Do I need a permit for a fence in Cass County?

Not in the unincorporated county: the zoning ordinance says fences need no permit, though height and placement rules still apply. Inside Logansport, fences do need a city permit.

How much is a building permit for a new house?

$100 plus 7 cents a square foot, plus a $10 ILP; a 2,000-square-foot house is $250 before the septic permit.

Where do I apply?

On the OpenGov portal; the Planning Department at 200 Court Park, Room 306, Logansport, (574) 753-7775, answers questions about which application to use.

Does a shed on skids need a permit?

Yes. An accessory structure on skids is $20 plus the $10 ILP, and moving it to another site is $10.

How long is an improvement location permit good for?

One year from issue; if the work is not substantially complete, a new ILP is needed before work continues.

Who handles septic permits?

The Cass County Health Department at 1616 Smith Street, (574) 753-7760; a new system for new construction is $150.

Does the county issue permits in Logansport?

No. Logansport has its own Building Commissioner, fee ordinance and contractor registration, even though both use the same OpenGov portal.

Simplify Cass County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Cass County sooner?

Let Alliance prepare, file, and track your Cass County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Cass County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.