In Miami County, building permits and improvement location permits (ILPs) come from the Miami County Planning Department, Room 101 of the courthouse at 25 North Broadway in Peru (765-472-3901, ext. 1291), led by Administrator Corey Roser. It covers every unincorporated area; its jurisdiction map leaves out only Peru, Bunker Hill and Converse, so Amboy, Denver and Macy fall inside it. Since January 1, 2025 the county also plans and zones the 2-mile fringe those three once controlled. All permits are filed online through Schneider GeoPermits, and fees follow the schedule the County Council adopted on August 19, 2025: a new house is $0.15 a square foot for the building permit plus an ILP capped at $150.
What requires a building permit in Miami County?
The county’s fee schedule is the clearest list of what it permits. Each line carries a building construction permit (BCP), an improvement location permit for zoning, or both.
Homes and farms
- New houses, modular and manufactured home placement or relocation
- Additions, remodeling and accessory dwelling unit requests
- Accessory buildings, decks and porches
- Carports, lean-tos and prefabricated sheds (flat fee, higher with electric)
- Roofs, electric services, plumbing and HVAC installations
- Swimming pools, fences, signs and demolition
- New agricultural buildings (ILP only)
Commercial and energy
- New buildings, shells, additions, remodels and accessory structures
- Hotels, motels, condominiums and apartments
- Alterations, repairs, roofing and changes of use
- Commercial range hoods and sprinkler systems
- Billboards, towers and similar structures
- Personal solar systems, solar farms and wind turbines
The county also sells an advisory building inspection ($50) and a written advisory building report ($100) for owners who want an existing building checked, and charges $125 for a certificate of occupancy where no permit was issued.
What the county decides and what the state holds
Miami County sets its own permit fees (governed by Ordinance 4-18-05), registers contractors, runs its zoning, subdivision and flood damage prevention ordinances, handles unsafe buildings, and keeps special rules for data centers, solar farms and land near Grissom Air Reserve Base. Its flood damage prevention ordinance of August 7, 2023 was amended on October 6, 2025 and again on January 5, 2026. The Construction Design Release for Class 1 buildings remains a state approval.
Miami County building department: who handles permitting
The Planning Department handles zoning, building permits, inspections, code enforcement and unsafe buildings for the county, and staffs the Plan Commission and Board of Zoning Appeals. Its jurisdiction map marks the only areas it does not serve: the City of Peru and the towns of Bunker Hill and Converse.
Short on time to read all of this?
Get a free quote →| Office | Details |
|---|---|
| Planning Department | Miami County Courthouse, 25 N Broadway, Room 101, Peru, IN 46970; 765-472-3901, ext. 1291; fax 765-472-3908 |
| Online permits | Schneider GeoPermits, for every permit and contractor registration |
| Plan Commission | 6:30 p.m., second Wednesday of the month, courthouse G.A.R. Room |
| Board of Zoning Appeals | Second Wednesday, 7:30 p.m. or five minutes after the Plan Commission adjourns |
| Environmental Health (septic) | Miami County Health Department, 765-473-0283 |
| Highway Department | 2180 N Mexico Rd, Peru; 765-473-7125; driveway, utility and road cut permits |
| Surveyor and Drainage Board | Courthouse Room 104; 765-472-2544; Monday to Friday 8 a.m. to 4 p.m. |
Which office covers each city and town
| Community | Who serves it |
|---|---|
| Unincorporated county | County Planning Department (BCP and ILP) |
| Amboy, Denver, Macy | Inside the county department’s area on its jurisdiction map; the county rezoned the Town of Denver in 2022 |
| Peru (city) | City of Peru Building Department, City Hall, 35 S Broadway; 765-473-4881 |
| Bunker Hill, Converse | Outside the county department’s area; each town’s own plan commission zones inside its limits. Only part of Converse lies in Miami County. Ask the town office who issues building permits. |
Under an ordinance the commissioners adopted on December 16, 2024, the planning and zoning powers that Peru, Bunker Hill and Converse held in unincorporated land up to 2 miles beyond their limits ended on December 31, 2024. From January 1, 2025 the Miami County Plan Commission covers all unincorporated land, while each municipality keeps control inside its own boundaries.
Miami County permit types
Most jobs carry two charges: the building construction permit (BCP), usually priced on floor area, and the improvement location permit (ILP), priced on construction cost with a cap.
Residential permits
- Houses and additions: $0.15 a square foot for the BCP plus the ILP, with $100 minimums.
- Sheds, carports and lean-tos: a flat $75, or $125 with electric, which buys both permit cards.
- Remodels, decks and porches: $0.15 a square foot with a $50 minimum, plus the ILP.
- Manufactured and modular homes: placement and relocation are charged like new houses.
- Accessory dwelling units: a $75 request on the ILP side.
- Roofs and electric services: $50 each; plumbing and HVAC installations $75 each.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial work pays a base fee plus $0.15 a square foot on the BCP, and an ILP of $1 per $1,000 of construction cost capped at $500. Range hood installations, sprinkler systems, changes of use and alterations carry flat fees, and a temporary certificate of occupancy for up to 180 days costs $200. Development plan review is $225 per application.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →Solar farms and data centers
On November 2, 2026 the commissioners amended the solar ordinance to cap the total fenced panel area of all existing, approved and future solar farms in the county’s planning area at 2,750 acres. Acreage is counted as soon as a complete developmental plan review application is filed, the Planning Department keeps a public ledger in filing order, and it must stop processing new solar farm applications once the cap is reached. The county also added data center rules to its zoning ordinance in 2026; the amending ordinance was recorded on July 20, 2026.
What comes before the building permit
- Zoning. The ILP checks the zoning ordinance; rezonings, variances and special exceptions go to the Plan Commission or BZA first.
- Septic. Lots without sewer need a septic permit from the Miami County Health Department’s Environmental Health office.
- Driveways and road work. The Highway Department issues driveway access, utility and road cut permits on county roads; it does not maintain state roads.
- Drainage. The Surveyor oversees 496.71 miles of regulated drains, and work affecting one goes through the Drainage Board.
- Floodplain. Projects in mapped flood areas follow the county’s amended flood damage prevention ordinance.
Miami County permit costs and fees
The Miami County Council adopted the current fee schedule by Resolution 8-19-25 on August 19, 2025, on the recommendation of the Plan Commission and the commissioners; it replaced the schedule of August 20, 2024. The county says fees are governed by Ordinance 4-18-05 and may change without notice. BCP means building construction permit and ILP means improvement location permit.
Rather talk it over?
Call 1-855-478-4290 →| Work | Building permit (BCP) | Location permit (ILP) |
|---|---|---|
| New house; addition; accessory structure | $0.15 per sq ft, $100 minimum | $1 per $1,000 of cost; $5 minimum, $150 maximum |
| Remodel; deck or porch | $0.15 per sq ft, $50 minimum | $1 per $1,000 of cost; $5 minimum, $150 maximum |
| Manufactured or modular home placement | $0.15 per sq ft, $100 minimum | $1 per $1,000 of cost; $5 minimum, $150 maximum |
| Apartments or condominiums (residential) | $100 per unit plus $0.15 per sq ft | $1 per $1,000 of cost; $5 minimum, $150 maximum |
| Carport, lean-to, prefabricated shed | $75 without electric; $125 with electric (both permit cards) | Included |
| Accessory dwelling unit request | – | $75 |
| Electric service / roof permit | $50 / $50 | – |
| Plumbing installation / HVAC installation | $75 / $75 | – |
| Swimming pool | $100 | Over 3 ft deep: $1 per $1,000 of cost; $5 minimum, $150 maximum |
| Fence / demolition / signs | $50 / $50 / $50 per side | – |
| Temporary certificate of occupancy (residential / commercial) | $100 / $200 (commercial: up to 180 days) | – |
| Commercial new construction | $300 per structure plus $0.15 per sq ft | $1 per $1,000 of cost; $500 maximum |
| Commercial addition / shell only / accessory / remodel | $200 / $150 / $100 / $100, each plus $0.15 per sq ft | $1 per $1,000 of cost; $500 maximum |
| Hotel, motel, condo or apartment (commercial) | $30 per unit plus $0.15 per sq ft | $1 per $1,000 of cost; $500 maximum |
| Commercial alteration, repair or roofing / change of use | $75 / $75 | – |
| Range hood class one / class two / sprinkler system | $100 / $75 / $100 | – |
| Agricultural new construction / billboard | – | $150 / $75 |
| Personal solar system / towers | $100 / $150 per unit | – |
| Re-inspection or failed inspection / stop work order | $40 / $100 | – |
| Contractor registration | $50 | – |
| Permit renewal before expiry | 50% of the original fee | – |
| Rezoning / variance or special exception / appeal | $185 each | – |
| Minor or major subdivision / PUD | $150 plus $50 per lot / $300 plus $50 per lot | – |
Rather not deal with the Miami County building department?
Get a free quote →Worked example at the schedule’s rates: a 2,000-square-foot house with a construction cost of $300,000 pays a BCP of 2,000 × $0.15, or $300. The ILP at $1 per $1,000 would be $300, but the residential ILP is capped at $150, so the total is $450. Commercial wind turbines are listed at $200 per tower on the building side and $20,000 plus $1,750 per megawatt on the location side; a solar farm is listed at $10,000 on the building side and $1,750 per megawatt, not to exceed $40,000, on the location side.
Trade permits and who may pull them
Electrical, plumbing and HVAC work each have their own line on the fee schedule: $50 for a residential electric service, and $75 for a plumbing or HVAC installation. Plumbing contractors also need the state plumbing contractor license.
Contractor registration
Contractors and subcontractors register with the Planning Department online through Schneider GeoPermits, uploading a current certificate of liability insurance and paying $50 by cash, check made out to the Miami County Treasurer, or card. Registration runs from January 1 to December 31 of the same year, and the county posts a step-by-step guide to registering in GeoPermits. The City of Peru says the city and the county offer cross registration, so a contractor registered at either office is registered for both, though Peru’s own fee is $25. The county’s pages do not describe a separate rule for homeowners doing their own work, so ask the department before you apply.
How to apply for a Miami County building permit
Make sure the parcel is outside Peru, Bunker Hill and Converse; land in their former 2-mile fringe is now county land.
File any rezoning, variance or special exception with the Plan Commission or BZA, which meet on the second Wednesday.
Environmental Health issues septic permits; the Highway Department issues driveway, utility and road cut permits.
Every contractor on the job needs a current county registration, or a cross registration through Peru.
File the BCP and ILP online with the construction cost and floor area that set the fees.
Pay the fees and arrange inspections with the department.
Review, corrections and what causes delay
Solar farm filings count against the 2,750-acre cap only once the department rules them complete, so missing material can cost a place in the ledger. Renewing a permit before it expires costs half the original fee. Work that fails inspection pays $40 for each re-inspection, and a stop work order adds $100.
Inspections and certificates in Miami County
The Planning Department’s staff includes a building inspector and a code enforcement officer. Questions about inspections go to the department at 765-472-3901, ext. 1291. A carport, lean-to or shed permit that includes electric work comes with both permit cards. Failed or extra inspections cost $40 each.
Want this handled start to finish?
Get a free quote →A temporary certificate of occupancy costs $100 for a house and $200 for a commercial building, the commercial one for up to 180 days. A building occupied without a permit can apply for a certificate of occupancy for $125. Unsafe buildings are handled under the county’s Unsafe Building Law of November 20, 2023, and zoning compliance or verification letters cost $25 per parcel plus copies.
Indiana building code in Miami County
FEMA’s Community Status Book lists unincorporated Miami County (community 180409) as participating in the National Flood Insurance Program, with the current flood map dated September 28, 2012; the City of Peru has its own entry. The county’s flood damage prevention ordinance governs building in mapped flood areas.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Miami County building permit FAQs
Does the county issue permits in Peru?
No. Peru, Bunker Hill and Converse are outside the county department’s area; Peru has its own Building Department at City Hall.
I live just outside Peru. Who handles my permit?
The county. Peru’s 2-mile planning jurisdiction ended on December 31, 2024, and the Miami County Plan Commission has covered all unincorporated land since January 1, 2025.
How much is a permit for a new house?
$0.15 a square foot for the building permit, $100 minimum, plus an ILP of $1 per $1,000 of cost capped at $150.
What does a shed permit cost?
A prefabricated shed is $75, or $125 with electric.
How do contractors register?
Online in Schneider GeoPermits, with a certificate of insurance and a $50 fee; registration runs for the calendar year.
Is there a limit on solar farms?
Yes. Since November 2, 2026 the total panel area of solar farms in the county’s planning area is capped at 2,750 acres.
When does the Plan Commission meet?
At 6:30 p.m. on the second Wednesday of the month in the courthouse G.A.R. Room; the BZA meets the same evening.
Miami County permit search and official resources
Permits and contractor registrations are filed and tracked in Schneider GeoPermits. Copies of county planning records cost $0.10 a page in black and white and $0.25 in color for letter-size pages under the fee schedule’s public records request lines.
Inspections are where schedules slip.
Get a free quote →- Miami County Planning Department
- Schneider GeoPermits online permitting
- Fee schedule
- Resolution 8-19-25 adopting the fee schedule
- Contractor registration
- Jurisdiction boundaries map
- Ordinance ending the 2-mile jurisdictions (December 16, 2024)
- Plans and ordinances
- Solar acreage cap ordinance (November 2, 2026)
- Data center development ordinance (2026)
- Plan Commission
- Board of Zoning Appeals
- Highway Department permits
- Surveyor and Drainage Board
- City of Peru contractor registration
- FEMA Community Status Book, Indiana
Simplify Miami County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Miami County sooner?
Let Alliance prepare, file, and track your Miami County permits while your crew stays on the job.
More Indiana permitting guides
Peru
Read guide →Wabash County
Read guide →Cass County
Read guide →Michigan City Building Permit Guide
Read guide →Mishawaka Building Permit Guide
Read guide →Monroe County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Miami County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.