In Peru, building permits come from the City of Peru Building Department at City Hall, 35 South Broadway (765-473-4881), where Bruce Carson has been Building Commissioner since January 2024. The department combines building, zoning and code enforcement, takes applications online through its iWorQ portal or at City Hall, and adds a zoning fee for the improvement location permit (ILP). A new house costs $0.10 a square foot, with a $100 minimum and a $500 cap for one- and two-family projects, plus the $45 residential ILP. Land outside the city limits is planned and permitted by Miami County.
What requires a building permit in Peru?
Peru sorts work by property type. On a residential property (a one- or two-family house, duplex, or modular or manufactured home) a permit is needed for any new structure, accessory building, addition, electrical, roofing, plumbing or HVAC work. A commercial property, meaning anything larger than a two-family dwelling, needs a commercial permit for the same kinds of work.
Permit required
- New houses, additions and remodels of the primary residence
- Accessory buildings, whether on a permanent foundation or not
- Roofing, including re-roofs and overlays
- Electrical services and rewires, new HVAC systems and plumbing installations
- Pools and spas, in-ground or above-ground
- Ramps, stairs and fences over 8 feet (a variance first)
- Demolition and moving a structure
- Placing a manufactured or modular home
No building permit
- Agricultural buildings, under the residential fee sheet
Fences go through the city’s zoning permit application under Fence Ordinance 151.080, signed by the zoning administrator. Minor remodeling, including electrical or roofing work, still needs an application approved by the Building Commissioner before work starts.
What Peru decides and what the state holds
Peru sets its own permit and zoning fees, registers contractors, tests and licenses electrical contractors, enforces the property maintenance code and handles unsafe buildings. Its Advisory Plan Commission works under Chapter 151 of the city code. For commercial new builds the department asks for the state design release, Rule 5 and floodplain requirements with the application; the Construction Design Release itself is a state approval for Class 1 buildings.
Peru building department: who handles permitting
The Building Department’s duties are plan and permit review for new or substantial improvements; permits for construction, demolition and occupancy, including electrical upgrades, roofing, pools, renovations and new builds; contractor registration and licensing; and unsafe building and code enforcement cases. The zoning administrator, on the second floor of City Hall, staffs the Plan Commission and Board of Zoning Appeals and reviews zoning permits with the Building Commissioner.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | City of Peru Building Department, City Hall, 35 S Broadway, Peru, IN 46970 |
| Phone / fax | 765-473-4881 / 765-472-5815 |
| Hours | Monday, Tuesday, Thursday, Friday 8 a.m. to 4 p.m.; Wednesday 8 a.m. to noon |
| Building Commissioner | Bruce Carson, appointed effective January 1, 2024 and approved by the Common Council on January 8, 2024 |
| Zoning | zoning@cityofperu.org; 765-919-4127 |
| Plan Commission and BZA | 6:00 p.m., fourth Tuesday, City Hall (next: November 24, 2026) |
| Online | iWorQ portal for permit submission, zoning permits and permit status |
The city’s permits stop at its boundary. Miami County ended Peru’s planning and zoning control over unincorporated land within 2 miles of the city on December 31, 2024, so parcels outside the limits go to the Miami County Planning Department in the courthouse.
Peru permit types
Peru publishes separate application forms for accessory structures, pools, manufactured and mobile homes, fences, floodplain work, address changes, roadside stands and street, alley, curb or right-of-way cuts, and takes building permits online through iWorQ. Residential and commercial permits are good for one year, except demolition permits, which last 30 days.
Residential permits
- New homes and additions: priced by square foot, with living-space additions at twice the rate of non-living additions; add the zoning fee for new construction.
- Accessory buildings: a permanent building of 200 square feet or more needs a monolithic pour or pad; a non-permanent one of 200 square feet or less pays a flat fee, and the fee sheet adds the zoning fee to both. The accessory structure form records setbacks, new addresses, lot combinations and any variance needed.
- Manufactured and modular homes: bring the year, serial number and state registration, and a moving permit from Miami County.
- Demolition: a mobile home owner must first confirm with the Assessor’s Office that no back taxes are owed.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial permits cover apartments and condominiums, offices, warehouses, manufacturing, restaurants, retail, hotels and agricultural buildings, with new structures, shells, additions, remodels, accessory buildings and roofing priced separately. Electrical service, plumbing, HVAC, towers and in-ground or floodplain storage tanks have their own lines. New commercial builds need the state design release, Rule 5 and floodplain documents, and three copies of the plans delivered to the office.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Plot drawing. Additions and new construction need a drawing with lot dimensions, every existing building, the proposed work and the clearance to each lot line, reviewed by the zoning administrator and Building Commissioner.
- Zoning permit. The ILP fee is added to the building permit for new construction; fences use the zoning permit form alone.
- Variances. Setback, fence and parking variances, use variances and special exceptions go to the Board of Zoning Appeals, with a newspaper notice at least 10 days before the meeting.
- Right-of-way and floodplain. Street, alley and curb cuts need a cut permit, and work in the floodplain uses the city’s floodplain permit application.
Peru permit costs and fees
The Building Department posts separate residential and commercial building permit fee sheets and a zoning fee page; the sheets do not cite an ordinance number. Residential permits for one- and two-family dwellings are capped at $500 per project and commercial permits at $5,000.
| Work | Fee |
|---|---|
| New primary residence | $0.10 per sq ft, $100 minimum |
| Room addition (living space) | $0.20 per sq ft, $100 minimum |
| Room addition (non-living area) | $0.07 per sq ft, $25 minimum |
| Manufactured or modular home placement | $0.10 per sq ft, $100 minimum |
| Renovate or remodel primary residence | $0.10 per sq ft, $100 minimum |
| Roofing (re-roof, overlay) | $40 |
| Accessory structure, permanent, 200 sq ft or more | $0.10 per sq ft, $35 minimum |
| Accessory structure, non-permanent, 200 sq ft or less | $35 |
| Fences over 8 feet, ramps, stairs | $40 |
| Swimming pool or spa | $75 |
| Demolition: house / accessory | $100 / $60 |
| Relocating a structure | $0.10 per sq ft, $100 minimum |
| Electrical service only / service and rewire | $40 / $100 |
| New HVAC system / plumbing installation | $100 / $100 |
| Permit renewal before expiry | 50% of the original fee |
| Certificate of occupancy | No charge |
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| New commercial structure | $0.15 per sq ft plus $30 per unit |
| Warehouse / shell only | $0.15 per sq ft plus $300 base |
| Commercial addition / accessory structure | $0.15 per sq ft plus $200 / plus $100 base |
| Commercial remodeling | $0.15 per sq ft plus $150 base |
| New apartments or condominiums | $0.25 per sq ft plus $15 per unit |
| Multi-family addition or renovation | $0.25 per sq ft, $100 minimum |
| Agricultural structure | $60 |
| Commercial roofing | $100 per structure; $100 per unit multi-family; $100 not-for-profit |
| Electrical service / HVAC / plumbing | $75 each |
| Pool or spa / change of use | $150 / $75 |
| Storage tank (in-ground and floodplain) / towers | $150 per unit each |
| Work | Fee |
|---|---|
| Improvement location permit | $45 residential; $75 commercial |
| Appeal, special exception, use or area variance | $160 each |
| Rezoning or vacating an alley or road | $160 plus $25 recorder’s fee |
| Planned unit development | $300 |
| Subdivision | $300 plus $10 per lot |
| Home occupation / sign | $20 / $50 per sign |
Worked example at the sheets’ rates: an 1,800-square-foot new house is 1,800 × $0.10, or $180, plus the $45 residential ILP, for $225. A permit may be renewed once before it expires for half the original fee; renewing after expiry costs the full fee, and a second renewal needs a new application and review.
Trade permits and who may pull them
Electrical, plumbing and HVAC work each have their own permit lines, and the accessory structure form marks the electrical and plumbing contractor lines “must be licensed”, while an owner doing the work may write “self”. Plumbing contractors need the state plumbing contractor license.
Contractor registration
Peru says contractor registration is required in the city and across Miami County. Registration costs $25, needs the company name, contact details and proof of insurance, and must be renewed between January 1 and February 28 each year. A contractor who is not registered cannot obtain permits, which the city ties to section 152.18(C) of its code. The city and the Miami County Building Department offer cross registration, so registering at either office covers both; when pulling a permit, show proof of registration and a certificate of insurance naming the agency as certificate holder.
Rather not deal with the building department?
Get a free quote →Electrical contractor test
Electrical contractors must pass the city’s test before registering. One part is open book, using the 2017 NEC code book the city provides; the other is closed book on Peru Utilities residential standards. A score of at least 80% is needed on each part, within a 3-hour limit, and tests are given from 8 a.m. to 1 p.m. on Monday, Tuesday, Thursday and Friday and from 8 to 9 a.m. on Wednesday. Results come within 24 hours, the Board of Works then approves the contractor at one of its twice-monthly meetings, and the license costs $25 a year with at least $100,000 of insurance. A failed test can be retaken after 7 business days, and a contractor who lets the license lapse three years in a row must test again.
Alliance handles electrical permit expediting for contractors here. More on this: who pulls the electrical permit.
How to apply for a Peru building permit
Land outside the limits, including the former 2-mile fringe, is permitted by Miami County.
Each contractor registers with the city or the county; electrical contractors pass the city test first.
Show the lot, existing buildings, the new work and its distance to every lot line.
Submit online through iWorQ or at City Hall; commercial new builds deliver three sets of plans with the state design release, Rule 5 and floodplain papers.
The zoning administrator and Building Commissioner approve the application before work starts.
Pay by cash, check, money order, certified check or card; card payments are taken by phone through the Clerk’s Office.
Review, corrections and what causes delay
A fence over 8 feet needs its variance before the permit, and every BZA case needs a newspaper notice at least 10 days before the meeting, which falls on the fourth Tuesday. Subdivision plans go to the zoning administrator first and the City Council for the final plan. Unregistered contractors stop the permit entirely. Demolition permits expire after 30 days.
Inspections and certificates in Peru
Questions about inspections of permitted work go to the Building Department at 765-473-4881, and a permit’s status can be checked in the iWorQ portal. Fence applications ask whether the site is marked for inspection, so mark the fence line before applying.
A certificate of occupancy is part of the permit and carries no charge. The department also enforces the International Property Maintenance Code, investigates unsafe buildings and handles grass, trash and derelict vehicle complaints, which can be reported online through the department’s code enforcement link. The city’s sidewalk rebate program has its own application.
Want this handled start to finish?
Get a free quote →Indiana building code in Peru
FEMA’s Community Status Book lists the City of Peru (community 180168) as participating in the National Flood Insurance Program, with the current flood map dated September 28, 2012. Work in the floodplain uses the city’s floodplain permit application, and storage tanks in the floodplain carry a separate $150 permit.
Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana
Peru building permit FAQs
How much is a permit for a new house in Peru?
$0.10 a square foot with a $100 minimum, plus the $45 residential ILP; one- and two-family projects are capped at $500.
Do I need a permit for a shed?
Yes. A non-permanent shed of 200 square feet or less is $35; a permanent one of 200 square feet or more is $0.10 a square foot, $35 minimum, on a monolithic pour or pad.
Do I need a permit for a fence?
Fences go through the zoning permit application under Fence Ordinance 151.080; one over 8 feet also needs a variance and a $40 building permit.
Do I need a permit to re-roof?
Yes. A residential re-roof or overlay is $40; commercial roofing is $100 per structure.
Can I register as a contractor with the county instead?
Yes. Peru and the Miami County Building Department offer cross registration, so registering at either office covers both.
Do electricians need anything extra?
Yes. Electrical contractors must pass the city’s two-part test with 80% on each part and hold a $25 city license.
Who handles permits just outside the city?
Miami County. Peru’s 2-mile planning jurisdiction ended on December 31, 2024.
Peru permit search and official resources
Permit status can be checked online in the city’s iWorQ portal through the “Check on existing permit” link on the Building Department page; for older files, ask the department at City Hall. Its page also links the setback requirements handout, the fencing ordinances and the property maintenance code manual.
Inspections are where schedules slip.
Get a free quote →- City of Peru Building Department
- Building permits and procedures
- Residential building permit fees
- Commercial building permit fees
- Zoning fees
- Contractor registration
- Electrical contractor test study guide
- Accessory structure permit application
- Fence permit application
- Floodplain permit application
- Setback requirements handout
- Street, alley, curb and right-of-way cut permit
- Planning and zoning
- Miami County ordinance ending the 2-mile jurisdiction
- FEMA Community Status Book, Indiana
Simplify Peru permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Peru sooner?
Let Alliance prepare, file, and track your Peru permits while your crew stays on the job.
More Indiana permitting guides
Miami County
Read guide →Wabash County
Read guide →Cass County
Read guide →Pike County Building Permit Guide
Read guide →Plymouth Building Permit Guide
Read guide →Porter County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Peru permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.